For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-138 — Microwave path study

Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 10-138

Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/037a90cd-0fac-44a9-be54-d1ca435885bb

Sec. 10-138. - Microwave path study.

The microwave path study shall include (1) the proximity of the new construction to the city's microwave path or radio site; (2) a tangential distance to the nearest microwave segment with a diagram delineating the locations of the new construction and of said closest microwave segment; and (3) calculations for the probability of interruption to the system. The microwave path study shall be certified by an electronic engineer who is a holder of a State of Florida Professional Engineer license. (1) In the case where the city's radio communications liaison ("RCL") agrees to the microwave path study's findings of non-impact, the city shall proceed with the application and permitting process and grant approval of the land development or building permit, as applicable, subject to compliance with all other laws and regulations. (2) If the microwave path study's findings indicate that there is an interruption or blockage of the microwave path, corrective action by the owner/applicant/designee will be required to assure microwave system reliability is retained. This shall include interruptions that are determined despite a non-impact result from the microwave path study.

(Ord. No. 13746, § 2, 2-22-18)

Ask a question about Miami law

Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.