§ 5-143 — Priorities and timeline
Code of Ordinances of the City of Providence, Rhode Island (Supp. No. 8: codified through Ordinance No. 2026-10, enacted March 5, 2026) · Providence Code of Ordinances § 5-143
Corpus is an independent public-information project, not the official City of Providence website. Stable reference: corpuslaw.us/code/03b3ee78-d74d-490e-a00f-393fb3708b12
Sec. 5-143. - Priorities and timeline.
All municipal buildings are to be carbon neutral buildings by 2040. School facilities shall meet the latest definition of zero energy capable as defined by the Northeast Collaborative for High Performance schools (NE-CHPS) by 2040 the priorities for reaching carbon neutrality for each building include, but are not limited to the following: (1) Completing a comprehensive accounting and analysis of all energy uses in all municipal buildings. (2) Identification and analysis of energy efficiency measures and energy saving opportunities, as well as applicable local, state, federal, and other sources of capital to defray costs of these measures. Investing in all cost-effective energy efficiency and energy savings opportunities. (3) Analysis of the feasibility of using thermal energy and thermal energy networks at the facility, including any anticipated limitations on the use of thermal energy networks, along with a characterization of any such limitations, including whether they are permanent, temporary, or resolvable in a cost-effective basis. (4) Determination of the feasibility and advisability of gathering, combining, or expanding any clean energy sources or central thermal energy networks with neighboring or nearby related municipal facilities. (5) An analysis of the feasibility of installing electrically powered space and water heating and cooling systems, and associated structural and electrical upgrades, with a goal of all electric buildings. a. Where and when electrically powered space and water heating and cooling systems are determined to be cost-effective, the city will prioritize these recommended systems and place the system in service, except in cases where thermal energy and thermal energy networks are installed as suitable cost-effective alternatives. (6) Preference for the installation of on-site renewable energy generation where feasible based on location and building characteristics (orientation, sunshade, etc.), as well as battery storage systems. (7) Require all public buildings to have an energy use intensity (EUI) assessment within a year of passage in order to prioritize the need for an investment grade energy audit. (8) Schedule investment grade energy audits based on the above prioritization for buildings with the worse EUI ratings, or with the most favorable renewable energy potential within three (3) years of passage (unless one (1) has been performed in the prior two (2) years), to assess energy savings opportunities, electrification potential, and renewal and battery energy storage system capabilities, and updated based on funding potential and required levels of performance. Buildings scheduled to receive capital improvements based on the city's CIP or other schedules must undergo an investment grade energy audit prior to the issuing of formal construction documents. (9) Within a year of the investment grade audit, the city will assess the audit findings and create a priorities plan for capital improvements to advance the decarbonization goals of the city/described in this article. (10) All school buildings must be not powered by metered and delivered fossil fuel by 2040 for all primary building systems. Starting immediately, no new connections to the fossil fuel system from a municipal building will be permitted, provided that the replacement thermal system for heating, cooling, hot water, and appliances in the building provides the same or greater safety, reliability, and cost-effectiveness as defined in section 5-141. (11) All other municipal buildings must have completed the relevant evaluations as described above and invest in all cost-effective energy efficiency and clean energy systems to move toward full electrification as soon as it is cost-effective, leveraging all available local, state, federal, and other available funding. All other municipal buildings must be powered by one hundred (100) percent carbon pollution-free electricity by 2033, at least half of which will be locally supplied clean energy, as required in the Climate Justice Plan.
(Ord. No. 2024-3, § 1, 3-12-24)
Ask a question about Providence law
Corpus searches the Providence sections it holds and shows the ones that match, with their citations. Free, no sign-in.