§ 18-123 — Quality control plan for consultants and contractors
Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 18-123
Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/03d10e2a-7837-4e18-8080-12832bca331b
Sec. 18-123. - Quality control plan for consultants and contractors.
(a) Consultants. (1) Quality control is the process performed to ensure conformance by consultants to valid requirements by industry standards. This process includes quality planning, training, providing clear decisions and directions, constant supervision, immediate review of completed activities for accuracy and completeness, and documenting all decisions, assumptions, and recommendations. There are three main objectives of a quality control plan ("QCP"): a. To provide a mechanism by which all products of consultants, as applicable, will be subject to a systematic and consistent review to ensure that the final product will be substantially error free. b. To provide for a well-documented design process. A properly documented project file should support major decisions made during the project development and design as well as provide a record of the QCP. c. To provide feedback from the reviews and communication that will assist consultants in improving the design process. (2) All plans, specifications, and estimates for city public works or capital improvement projects prepared by either in-house city professional staff or by external consultants will be prepared in accordance with a documented QCP. (3) The city's department of resilience and public works and the office of capital improvements are authorized to administratively develop and promulgate a QCP. (4) This QCP will provide guidance to the architect or engineer of record and promote communication between consultants, contractors, and vendors, as applicable, and the city's staff. (5) The architect or engineer of record, in conjunction with the city's project managers, is responsible for ensuring all project components are economical, accurate, coordinated, checked, and in conformity with valid requirements pursuant to industry standards. City project managers are encouraged to randomly visit their consultants' offices for unannounced quality assurance reviews to ensure compliance with the consultant's project specific QCP. Consultants shall be cooperative during any such visits. (6) Any failures by the consultant in the QCP shall be noted by the city's project manager in the consultant's work performance evaluation. Pursuant to subsection 18-87(r) of the City Code, consultants with poor project evaluations are subject to the possibility of a suspension, termination, or debarment imposed by the city in accordance with the procedures set forth in section 18-107 of the City Code and the evaluation regulations. (b) Contractors. (1) During the construction phase of capital improvement projects, contractors in coordination with city project managers and the architect/engineer of record will develop a QCP. This plan will detail the qualified personnel, facilities, production facilities, and the means and methods the contractor intends to use to ensure that the work complies with the contract documents. The contractor's QCP will follow the basic guidelines established by the city's staff from the department of resilience and public works and/or the office of capital improvements that are generally applicable to any public works or capital improvement projects. (2) The contract documents will dictate the requirements of the contractor's QCP. As a result, the contractor shall be responsible for all quality control-related inspections over applicable materials. The construction engineering and inspection ("CEI") personnel, therefore, shall have the primary function of monitoring the contractor's level of compliance with the contract documents. (3) The city's department of resilience and public works and the office of capital improvements are authorized to administratively develop and promulgate a QCP. (4) In-person quality assurance inspections of work in progress are also required. These inspections should be on an as-needed basis and as required by the QCP. These inspections are typically less frequent than quality control inspections. Quality control inspections of materials or inspection activities not covered by the contractor's QCP must be performed by CEI personnel. (5) Quality assurance. CEI personnel must determine the adequacy of the contactor's QCP in meeting the requirements of the contract documents. If the requirements of the contract are not being met by the contractor's QCP, the city's project manager and/or other city staff involved in the project must be notified. The CEI should always document instances of QCP failures in meeting the requirements of the contract documents. These instances should also be discussed at work progress meetings. (6) Quality control. It is the CEI's responsibility to ensure compliance with the contract documents through direct observation of construction operations, examination of completed construction, sampling and testing of materials, and review of records to verify compliance with instructions for those records. It is also the CEI's responsibility to produce the required performance records. Performance of these responsibilities requires training, preparation, observation of field operations, and record keeping. (7) Any failures by the contractor in the QCP shall be noted by the city's project manager in the contractor's work performance evaluation. Pursuant to subsection 18-89(g) of the City Code, contractors with poor project evaluations are subject to the possibility of a suspension, termination, or debarment imposed by the city in accordance with the procedures set forth in section 18-107 of the City Code and the evaluation regulations.
(Ord. No. 14007, § 2, 6-10-21)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.
