Sec. 32-122. - Post-construction stormwater management plan.
The post-construction storm water management plan shall be submitted to the planning department for transmittal to the director, on a form or format specified by the director, as part of any preliminary plat application required under section 53-6. If not already submitted as part of a preliminary plat process, a post-construction storm water management plan shall be submitted to the director for any activity requiring a permit under section 32-101, at the same time the application for a City of Omaha grading permit is submitted. For any significant redevelopment that does not require a permit under section 32-101, a post-construction storm water management plan shall be submitted along with the permit application for any activity requiring a building permit under section 43-71.
For all developments that have not had a preliminary plat approved by the city council prior to July 1, 2008, the post-construction storm water management plan, at a minimum, shall include low impact development (LID) BMPs to provide for water quality control of the first one-half inch of runoff from the site and shall maintain the peak discharge rates during the two-year storm event to baseline land use conditions, measured at every drainage outlet (storm water discharge) from the new development or significant redevelopment, and include the BMP or BMPs selected, the BMP design, schedules and procedures for inspection and maintenance of the BMPs. Provisions for BMPs are set forth in the Omaha Regional Stormwater Design Manual. The director may also require this minimum control level for replats that significantly increase the amount of impervious area in a preliminarily platted subdivision, which was approved by the city council prior to July 1, 2008.
For all developments with plats preliminarily approved by the city council prior to July 1, 2008 and for any sites requiring a permit under section 32-101 and for significant redevelopment projects, the post-construction storm water management plan, at a minimum, shall include the BMP or BMPs selected, the BMP design, schedules and procedures for inspection and maintenance of the BMPs, and for any sites requiring a permit under section 32-101 and where it is reasonably practicable, include BMPs for water quality control of the first one-half inch of runoff from the site. Provisions for BMPs are set forth in the Omaha Regional Stormwater Design Manual. For significant redevelopment projects that do not require a permit under section 32-101 or that involve replacement of building structures without significant disturbance of existing parking or other pervious areas, BMPs for water quality control of the first one-half inch of runoff from the site shall not be required. For significant redevelopment projects involving an outlot parcel that is part of a greater existing development, the calculation of the area requiring control of the first one-half inch of runoff shall be based only on the impervious area of the project site that is being added or disturbed within the outlot parcel.
(Ord. No. 37395, § 1, 6-13-06; Ord. No. 38222, § 2, 8-26-08; Ord. No. 38544, § 1, 10-20-09)