§ 33.676.200 — Application Requirements
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.676.200
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/04d0122f-2090-4f24-a01a-af2fc41979c5
33.676.200 Application Requirements
A complete application for a Lot Confirmation under the provisions of this chapter consists of the materials listed below. The Director of PP&D may waive items listed if they are not applicable. Application materials may be filed electronically in a format designated by the Director of PP&D. If a paper copy is submitted, at least one copy of each plan/map submitted with the application must be 8- 1/2 by 11 inches in size and be suitable for reproduction. The applicant is responsible for the accuracy of all information submitted with the request. A. Application Form. The completed application form bearing an accurate legal description, tax account number and location of the property. The completed form must also include the name, address, telephone number, and original signatures of the applicant and all property owners and the nature of the applicant’s interest in the property. B. Verification of lot creation. Documentation that establishes when and how the lot was created is required. For Lot Confirmations where the base zone requires that the lot was under separate ownership from abutting lots, ownership information for the lot and abutting lots is also required. This may include copies of recorded plats, historic deeds, or other documentation that provides evidence of the creation and chain of ownership of the property. C. Site plan and supplemental survey. 1. A site plan is required for all applications. The site plan must be drawn to scale and show: • The location of existing lot or property lines; • The boundaries of the re-established lot, lot of record, or combinations thereof; • All development on the site including driveways and parking areas; • The location of utilities and services; and • The location and dimensions of existing curb cuts abutting the site. 2. If existing buildings on the site will remain after the lot confirmation, a supplemental survey signed and stamped by a registered land surveyor is also required. The survey must show utilities and services, the distances between the buildings on the lot, and the lot line that is being confirmed. C. Other. 1. Narrative. A written narrative explaining how the regulations and standards of this chapter have been met; and 2. Fees. The applicable filing fees.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
