For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 503.01 — Street Opening Permits; Right-of-Way Registration; Costs

Codified Ordinances of the City of Cleveland, Ohio (2026 S-28: current through legislation passed October 19, 2026) · Codified Ordinances of Cleveland § 503.01

Corpus is an independent public-information project, not the official City of Cleveland website. Stable reference: corpuslaw.us/code/04eec71d-8499-4ce1-a97f-330d17120ec0

§ 503.01 Street Opening Permits; Right-of-Way Registration; Costs

(a) No person, including a corporation, private utility or public utility, shall excavate any pavement in any highway, lane, road, street, alley or sidewalk of the City, without first obtaining a street opening permit, except as provided in division (g) of this section, and holding a current Right-of-Way Certificate of Registration, except as provided in division (a)(2) of this section. (1) Street Opening Permit. The application for a street opening permit shall be in the form prescribed by the Director. This application shall state the name, address and phone number of the applicant, the location, kinds and extent of the pavement desired to be taken up and the number, purpose and size of excavations which are desired or necessary. If the permit is for reconfiguring the public right-of-way, an engineered drawing stamped by a professional engineer of the State of Ohio much accompany the permit application. The application shall also include a signed statement that the permittee shall hold harmless the City of Cleveland, its officers and employees and shall indemnify the City of Cleveland, its officers and employees for any claims or damage to property or injury to persons which may be occasioned by any activity carried on under the terms of the permit. At the time of application, the applicant shall pay a non-refundable fee in accordance with the following: A. Street Excavation - $313.00 for first 200 sq. ft. and $43.00 for each additional 200 sq. ft. (or portion thereof) $195.00 inspection fee for one parcel or a small project $260.00 per month inspection fee for a large project B. Sidewalk Excavation - $45.00 for 1 to 200 sq. ft or for a single residential parcel $90.00 for 201 to 1000 sq. ft. $135.00 for 1001 to 5000 sq. ft. $225.00 for 5001 sq. ft. or over $195.00 inspection fee for one parcel or a small project $260.00 per month inspection fee for a large project C. Expedited Reviews - $50.00 additional fee for any requested and performed expedited reviews. D. Engineering Review Fee for Earth Retention System (ERS) review or elevated pedestrian bridge review - $4,000.00 fee for complete review per site. For purposes of this section, a “small project” means that the adjacent property for which a permit is being sought is a single residential house, townhomes or apartments with less than four units, other commercial single building under 0.5 acres and a “large project” means that the adjacent property for which a permit being sought is greater in size than a small project. (2) Right-of-Way Certificate of Registration. The application for an annual Right-of-Way Certificate of Registration shall be in the form prescribed by the Director, shall state the name of the person, firm or corporation applying for registration and the name, address, and phone number of the place of business or places of business of the applicant, and shall include such additional information that the Director deems necessary. If the applicant is a firm, co-partnership, corporation, association or any combination, the application shall contain the names and addresses of all members or officers, together with a certified copy of the corporation minutes or other certified evidence that the application has been duly authorized. At the time of application, the applicant shall pay a non-refundable fee of one hundred dollars ($100.00). No Right-of-Way Certificate of Registration shall be required for officials or employees of a public utility or private utility. (b) In the event the scope of the project is revised during the course of the work, the Manager of Engineering and Construction may recalculate the street opening permit fee based on the actual size of the excavation in accordance with the fee schedule. (c) In the event that a street opening permit is not issued or is revoked before an excavation has been made, the entire fee shall be refunded to the applicant, except for twenty-five dollars ($25.00) to cover the city’s cost of processing the application. (d) Prior to being issued a street opening permit, permittee shall submit a performance bond or have a current performance bond on file either: (1) In the amount of the estimated cost of backfilling and restoring the excavation to be made by the permittee, as estimated by the Manager of Engineering and Construction; or (2) An umbrella bond in the amount of two hundred fifty thousand dollars ($250,000.00). Any person providing an umbrella bond will be deemed to have met the performance bond requirements of this section for the duration of the performance bond. (e) After the fee and deposit required by this section have been paid, the Director may issue the street opening permit applied for. The permit shall state the exact time the excavation is to be made, the probable length of time required for the work to be done and the repair made, the character of the pavement, including its base, and the character of the work necessary for the satisfactory relaying of the pavement. (f) Permittee shall restore, or cause to restore, all excavations according to regulations promulgated by the Director of Capital Projects. Any regulations promulgated by the Director shall be effective thirty (30) days after publication in the City Record. (1) If the Director determines that the permittee has failed to make restorations according to the Director’s regulations, the Director may, by written notice, order the permittee to make restorations according to the regulations. The permittee shall have thirty (30) calendar days from receipt of written notice to make the appropriate restorations. (2) If the Director determines that the permittee has failed to make restorations after thirty (30) days from the permittee’s receipt of notice, the Director may draw, from the permittee’s performance bond, funds sufficient to make the restorations according to the Director’s regulations or the Director may proceed to carry out the restoration in accordance with Section 503.015 of these Codified Ordinances. (g) In an emergency, a person may make an excavation or opening or remove pavement in any highway, lane, road, street or alley of the City, provided that the person notifies the Director in writing of the emergency, including a description of the nature of the emergency, and applies for a street opening permit within seven (7) calendar days of making the opening. The appropriate street opening fee shall accompany the application. Any person failing to notify the Director as provided in this division (g) shall be charged the regular permit fee plus an additional fee of two hundred dollars ($200.00) to cover the City’s administrative costs of identifying and inspecting the street opening made without a permit. As used in this division (g), “emergency” means a condition that (i) poses a clear and immediate danger to life or health or of a significant loss of property; or (ii) requires immediate repair or replacement in order to restore service to a user. (h) The street opening permit shall identify the time period in which the street opening must be closed. The Manager of Engineering and Construction or his or her designee will determine this time period based upon the size and nature of the opening. (1) If the work is not started within the time designated in the street opening permit, the permit may be revoked by the Manager. (2) If the work has been started but not completed within the time designated in the street opening permit, the permit may be revoked by the Manager of Engineering and Construction. If the permit is revoked, the Director may charge all accrued restoration charges to the permittee. Should the permittee fail to pay all accrued restoration charges within thirty (30) calendar days of receipt of notice, the Director may draw, from the permittee’s performance bond, funds sufficient to restore the highway, lane, road, street, or alley according to the Director’s regulations or the Director may proceed to carry out the restoration in accordance with Section 503.015 of these Codified Ordinances. (3) The Manager, or the Manager’s designee, may, at his or her discretion, issue a stop work order for any work being performed without a valid permit, or suspend a street opening permit for the following reasons: A. The work unreasonably interferes with the performance of work by another party who received a City permit before the issuance of permittee’s permit; or B. The suspension of the work is necessary for the City to evaluate, prevent, or address a hazard or risk to the health, safety, and welfare of the public; or C. The work performed, or the work being performed, is not within the scope of the work approved by the permit; or D. The work is creating, or has created, unsafe work conditions; or E. The permittee or his or her agent fails to abide by the provisions of these Codified Ordinances; or F. The permittee or his or her agent has violated the conditions of or the rules and regulations governing the permit; or G. The work performed, or the work being performed, fails to comply with the City’s specifications and standards. (4) A stop order suspending a permit issued under divisions (h)(3)C. through (h)(3)G. above, shall state the reason(s) for suspension and the corrective measure(s) to be taken, the date by which the corrective measure(s) are to be completed, and such additional information as the Manager, or the Manager’s designee, deems necessary. (5) A permittee whose permit is suspended under division (h)(3) above, may appeal the Manager’s decision to the Board of Right-of-Way Appeals, in writing, within ten (10) days of the Manager’s decision. (i) The Director may, at his or her discretion, revoke a street opening permit at any time under the authority of this chapter if the permittee fails to comply with the requirements contained in a stop order issued accordance with division (h)(4) above or any law, rule, or regulation relating to the performance of work in the public right-of-way or if permittee’s, or its agent’s, Right-of-Way Registration is revoked. (j) The Director may, at his or her discretion, revoke a Right-of-Way Certificate of Registration under the authority of this chapter if the holder fails to comply with the terms of this chapter or any law, rule, or regulation. Additionally, the Director may, at his or her discretion, suspend or revoke a Right-of-Way Certificate of Registration for any of the following reasons: (1) The holder is convicted of a misdemeanor involving moral turpitude or a felony during the renewal period of that Certificate of Registration; (2) The holder obtained a Certificate of Registration by fraud, misrepresentation or deception; (3) The holder engaged in fraud, misrepresentation or deception in the conduct of business; (4) The holder no longer has a valid policy for the required insurance; (5) The holder used its Certificate of Registration to obtain a permit for another; (6) The holder repeatedly failed to secure permits, inspections, and approvals required under Chapter 503; (7) The holder repeatedly installed work in an unworkmanlike manner as defined by the Construction Standards and Specifications of the City of Cleveland or not in conformity with permits issued by the City; (8) The holder has received written notifications of violating Construction Standards and Specifications of the City of Cleveland and has failed remedy such violations; and (9) There have been repeated incidents of returned checks for insufficient funds or stop payment without just cause. (k) The Director shall give written notice, as appropriate, to a permittee of any street opening permit revoked under division (i) above and to a holder of a Right-of-Way Certificate of Registration suspended or revoked under division (j) above. Such notice shall state the reason(s) for the suspension or revocation, as appropriate, and shall further state that the action shall become final unless, within thirty (30) days of date of the notice, a written notice of appeal is filed with the Board of Right-of-Way Appeals. (l) If a street opening permit is suspended under division (h)(3) above, the permittee shall discontinue any work and shall not commence work until the Manager, or his or her designee, provides written notification lifting the suspension. If a street opening permit is revoked under division (i) above, a new permit shall be secured before any further work may proceed. (m) A permittee, in accepting and acting under a street opening permit, agrees to assume full responsibility for injury and damage to persons and property incurred because of any settlement of a restored area, and further agrees to pay all costs involved in reconditioning such areas. If any settlement in a restored area occurs within a period of one (1) year from date of completion of the permanent restoration, it shall be considered as conclusive evidence of defective backfilling. Any expense incurred by the City in correcting such settlement shall be paid by the permittee. (n) A permittee shall carry on the work authorized by the permit in such manner as to cause a minimum of interference with traffic. The permittee shall use a traffic control plan that meets the minimum requirements in the Ohio Manual of Uniform Traffic Control Devices, as amended, or is otherwise approved by the Director. (o) For the purposes of this section, “excavation” shall have the same meaning as in division (a)(12) of Section 510.01 of these Codified Ordinances. (Ord. No. 1141-2023. Passed 2-3-25, eff. 4-5-25)

Ask a question about Cleveland law

Corpus searches the Cleveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.