For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

App. 1 — COPY OF FORMER FRANCHISE SECTIONS 301(b)—(f)

Saint Paul Legislative Code (Supp. No. 133, Update 1: codified through Ordinance No. 26-26, adopted May 13, 2026) · Saint Paul Legislative Code, App. H, App. 1

Corpus is an independent public-information project, not the official City of St. Paul website. Stable reference: corpuslaw.us/code/0580a7a5-2674-462c-8ce3-92f030f7a875

APPENDIX 1 - COPY OF FORMER FRANCHISE SECTIONS 301(b)—(f)

301.(b). The City will retain control of the entire capacity of CityLink, the cable broadband network developed as part of the institutional network demonstration projects, and may use all the capacity on CityLink for transmission and reception of data, video or other communications at no charge. The Company, at its cost, will maintain the CityLink network from the City's points of connection, whether the City's end user equipment or the City's control system for CityLink, through the network, including the Company's headend and remodulators so that it may be used for those purposes. The maintenance obligation includes, but is not limited to, the replacement of network components. Operational responsibilities will be shared as those responsibilities have been shared prior to December 1, 1997, with each party bearing its own costs. The City shall have the right, at its cost, to install equipment and devices on the system as appropriate to accommodate new services or functions, so long as it does not degrade technical system operation, and, further, for that portion of the System which the Company maintains, the right is subject to the consent of the Company, which shall not be unreasonably withheld. The Company, upon request, will install one (1) standard drop from the network to City buildings adjacent to the network at no charge, and otherwise will extend CityLink upon written request, but may charge the City the actual cost it incurs in extending the system, including drop costs. The parties will cooperate to share information and to assist each other technically as required to assure the efficient operation of the CityLink. A map showing CityLink as it existed as January 1, 1998 is attached to Ord 15-10 as Exhibit E. 301.(c). The Coaxial Institutional Network shall be constructed, provided and maintained at Company's cost as required by Appendix H, until the Upgraded HFC Institutional Network is completed. From and after completion of the Upgraded HFC Institutional Network, only the obligations established by or incorporated into the requirements for the Upgraded HFC Institutional Network shall apply. 301.(d). The Upgraded HFC Institutional Network shall be constructed, operated and maintained as required by the Corrective Plan, attached to Ord 15-10 as Exhibit C. The Corrective Plan obligations shall apply throughout the term of this franchise as if fully set forth herein, and for any period that the Company continues to operate within the City of St. Paul. The responsibility for costs and respective rights of the parties shall be as specified in the Corrective Plan (as clarified by the Agreement dated April 15, 1998), with the following additional amendments: 301.(d).(1). Under the Corrective Plan, the City is entitled to use all the capacity on the hybrid-fiber coaxial portion of the Institutional Network except for 12 MHz in the forward path and 12 MHz in the reverse path as initially activated. The City agrees that Company may utilize up to 20 percent of the available capacity in the forward path on the hybrid-fiber coaxial portion of the Upgraded HFC Institutional Network (counting the 12 MHz as part of the 20 percent) and 20 percent of the available capacity in the reverse path on the hybrid-fiber coaxial portion of the Upgraded HFC Institutional Network (counting the 12 MHz as part of the 20 percent), so long as the Company does so in a manner that (i) does not impair the City's use of the institutional network in any respect; and (ii) does not impose additional cost upon the City. Available capacity is defined as the portion of the 450 MHz activated capacity in a particular direction that is useable, less the capacity devoted to pilot and control signals that benefit the City. 301.(d).(2). Under the Corrective Plan, the city is entitled to 50 per cent of any increase in the hybrid-fiber coaxial portion of the Upgraded HFC institutional Network. If the capacity of the hybrid-fiber coaxial portion of the Upgraded HFC Network is increased by Company, Company shall make additional capacity available to the City within six months of a request therefor. However, the City agrees that on or before the time it requests such additional capacity, it will submit a plan for use of that capacity to the Company, showing why it believes that there is a need therefor. The Company may, within 45 days of receipt of the plan, submit an alternative plan for satisfying the City's needs. If the City, in its sole discretion, decides that the alternative plan is adequate, it will rescind its request; otherwise, the requested capacity must be provided. The parties clarify that this provision does not place an independent obligation on the company to increase the capacity of the Upgraded Institutional Network. 301.(d).(3). Under the Corrective Plan, the Company is required to activate a single data channel in the forward path and a single data channel in the reverse path for City use. Within six months of a City request therefor, Company agrees to provide an additional data channel in the forward and reverse paths for City use as more fully described in Exhibit B, attached to Ord 15-10. 301.(d).(4). Under the Corrective Plan, the Company is required to activate a single data channel in the forward path and a single data channel in the reverse path for school use. Within six months of a City request therefor, Company agrees to provide an additional data channel in the forward and reverse paths for school use as more fully described in Exhibit B. 301.(d).(5). The Corrective Plan establishes a series of testing procedures and other obligations that are not applicable to CityLink or to the Fiber Institutional network required herein. The Corrective Plan is hereby clarified to provide that the space that Company agrees to provide at the headend can be utilized for any part of the institutional network; that the testing procedures that apply with respect to video transmissions and data transmissions shall also apply to the CityLink and to the Fiber Institutional Network; and to provide that the requirements of Attachment 2-F-1—Attachment 2-F-2 shall be read to extend to all portions of the institutional network. Provided that, with respect to the dark fiber provided by the Company for the Fiber Institutional Network, the tests shall be performed in accordance with Exhibit B. Provided further, notwithstanding any other provision of the Corrective Plan, maintenance of the Fiber Institutional Network shall be paid for as provided below. 301.(d).(6). The Corrective Plan is clarified to make it clear that the City may improve any portion of the institutional network at any time (before and after it is upgraded) to increase the capabilities of the institutional network at its cost. 301.(d).(7). Company and the City shall also be bound by the requirements of the Corrective Plan Agreement, as if fully set forth herein, except that the provisions of Section 6 and Section 8 shall not apply. 301.(e). The company will construct, operate and maintain a Fiber Institutional Network as provided herein. 301.(e).(1). The Company at its cost will install fiber to the locations specified in Exhibit B. The fibers will be installed in the amount and in a topology as indicated on Exhibit B. If a ring topology is not used, the City Hall Annex will serve as the core location. This fiber must be installed no later than the time the Company upgrades the subscriber network, and must be completed and successfully tested on or before the date scheduled for completion of the subscriber network upgrade, except as otherwise provided in Exhibit B. These fibers will be installed at no charge to the City, except with respect to locations that are to be designated by November 30, 1998. With respect to those locations, if the average incremental cost of providing fiber to those locations exceeds the average incremental cost of providing fiber to all other locations listed on Exhibit B, the City will pay an amount equal to the amount by which the average cost of serving the newly designated locations (or, if lower, the not-to-exceed incremental cost estimate) exceeds the average cost of serving the other locations (or, if higher, the average cost estimate described below) (the Average Cost Excess). Within 30 days of the date the City designates the additional locations, Company must provide a not-to-exceed cost estimate of the incremental cost of providing fiber to those locations and an estimate of the average cost of providing fiber to all other locations. The City will then only be liable to pay the Average Cost Excess if City directs the Company to install the fiber to the newly designated locations. All installation will be planned to take advantage of economies of scale and minimize future maintenance costs to the city. 301.(e).(2). If the City desires to have the Fiber Institutional Network extended to locations other than those specified on Exhibit B, by the Company, it may require the Company to extend the Fiber Institutional Network, but the City shall pay the Company the Company's incremental cost for installing the fiber as provided in Section 301.(e).(3). Any fiber shall be installed in the number and in a topology designated by the City. 301.(e).(3). If the City notifies the Company that it desires to have fiber installed to a particular location, pursuant to Section 301.(e).(2), the Company will develop a "not-to-exceed" price for the extension based upon its estimated incremental extension costs. The extension will be planned to take advantage of any economies of scale that may result from installation of fiber at the same time that the Company installs fiber for its own purposes, and to minimize maintenance costs for the City. If the City directs the Company to install the fibers to that location, the Company may bill the City for its incremental costs, up to the not-to-exceed price, upon completion, testing and acceptance of the fiber link. 301.(e).(4). Nothing herein prevents the City from extending the Fiber Institutional Network itself, at its own cost. 301.(e).(5). Company, if requested to do so, shall maintain the Fiber Institutional Network. Beginning on the later of the date the upgrade to the Subscriber network is completed or 36 months after the effective date of the franchise, it may charge the City its actual incremental direct costs for maintenance, plus 10 per cent. However, the Company may not charge for maintenance unless it provides the City six months' notice in advance that it intends to do so. The actual incremental direct cost will be deemed to be $0.00 where the fiber used for the Fiber Institutional Network is included in or lashed to a fiber sheath containing fibers that are used for other portions of the institutional network or other portions of the Company's Cable system. The City may maintain the Fiber Institutional Network itself, if it wishes to do so. "Maintenance" for purposes of this section means ordinary preventive and corrective maintenance and inspections. If the Fiber Institutional Network plant is cut or destroyed or must be relocated, it is company's duty to replace, repair or relocate the plant, at its cost. 301.(e).(6). Company shall provide the City with access to its facilities and equipment as necessary to maintain or upgrade the Fiber Institutional Network with reasonable notice given the nature of the problem. 301.(e).(7). The Fiber Institutional Network fibers shall be for the exclusive use of the City, or other persons authorized by the City to use the Fiber Institutional Network. 301.(e).(8). Company shall otherwise construct, operate and maintain the Fiber Institutional Network, and charge for construction or maintenance as provided in Exhibit B. 301.(f). There shall be no charge for the institutional network or its use, other than the construction charges and maintenance charges for the Fiber Institutional Network set out in Section 301(e).

Ask a question about St. Paul law

Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.