Sec. 23-434. - Construction.
(a) Incorporation of division 2. Unless expressly provided for otherwise in this division, the provisions of division 2 of this article, which are incorporated into this division by reference and which shall be included when reference is made to this division, shall apply to small cell facilities and support structures, including their construction, removal, abandonment, maintenance and relocation. In the case of an irreconcilable conflict between this division and division 2, this division shall apply. (b) Contractors. Before any installation or other work in the right-of-way or on structures in the right-of-way commences pursuant to a siting permit, grantee must provide the franchise manager with a list of the contractors and subcontractors, and their contact information, authorized to work on the project, all of which must have a valid city business license at the time they perform any work in the city. (c) Coordination of work. Upon request of the city, an applicant may be required to coordinate placement or maintenance activities under a siting permit with any work, construction, installation or repairs that may be occurring or scheduled to occur within a reasonable time frame in the subject rights-of-way, and applicant may be required to reasonably alter its placement or maintenance schedule as necessary to minimize disruptions. (d) Undergrounding. Where undergrounding is required in accordance with section 23-353 of division 2, those portions of a small cell facility that cannot be technically placed underground will be subject to stealth requirements. (e) Restoration. Applicant shall be subject to the restoration provisions at section 23-355 of division 2. (f) Scheduling. In the interest of the public's health, safety and welfare, upon request of the city, through the franchise manager or city engineer, an applicant shall coordinate placement or maintenance activities under a siting permit with any other work, construction, installation or repairs that may be occurring or scheduled to occur within a reasonable timeframe in the subject rights-of-way. The city may require an applicant to alter reasonably its placement or maintenance schedule for permitted work as necessary so as to minimize disruptions and disturbance in the rights-of-way. The city may provide a more definite time frame based on specific city construction or maintenance schedules. (g) As-builts. An application for a siting permit, including an application to replace an existing small cell facility in the right-of-way, shall include plans showing the location of the proposed installation of facilities or structures in the rights-of-way. If the plans so provided require revision based upon actual installation, the applicant shall promptly provide revised plans. Further, the applicant shall provide "as-builts" upon completion of any installation or construction. The plans shall be in a digitized format showing the two-dimensional location of the facilities as provided in subsection 23-354(b) of division 2. The applicant shall provide such plans at no cost to the city.
(Ord. No. 20-270, § 1, 4-9-2020)
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.