§ 15.01.405 — Special inspections

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.01.405

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/05a40bd3-3d09-4766-9277-69dc38dad4f9

15.01.405 - Special inspections.

Special inspections shall comply with the provisions of this section. A. General. In addition to the inspections required elsewhere in this chapter, certain types of work shall have special inspections as specified in the building code . The special inspections shall be conducted by the building official or by an approved quality assurance agency approved by the building official. Special inspections conducted by an approved quality assurance agency shall be performed as provided in this chapter and the technical codes. Methods of complying with special inspection requirements are found in the technical guidelines. B. Special inspection by an approved quality assurance agency. When special inspections by an approved quality assurance agency are required, the owner or the design professional acting as the owner's agent shall employ a prime agency. The prime agency shall provide special inspections in accordance with the special inspection agreement as required by this chapter and the technical codes. No change of the prime agency shall be made without the approval of the building official. Projects designated by the building official as requiring special inspection by an approved quality assurance agency shall not be issued a permit until the special inspection agreement is executed by the owner or the owner's agent, the designated prime agency and the building official. C. Special inspection by other than a prime agency. Upon approval of the building official, other persons may provide special inspections in the following cases: 1. Where the required special inspection is to be performed by the design professional responsible for construction documents approved by the building official pursuant to this chapter; 2. Where, in the opinion of the building official, the nature of the work requires inspection by a person having specialized technical knowledge and skill to inspect and test specialized work for which the prime agency may not be qualified or authorized to inspect. In such cases, the building official may approve other persons to perform the required special inspection. Persons acting pursuant to this section accept all duties and responsibilities of a quality assurance agency including reporting requirements. D. Stop work orders. If the building official determines that an approved special inspector is failing to properly perform special inspection services, or that an unapproved special inspector performed, or is performing, special inspection services, the building official may order the special inspection work stopped. Once stopped by the building official, special inspection work may only resume upon written agreement between the quality control manager of the quality assurance agency and the building official. If the building official determines that the owner has made changes to the prime agency without prior approval after the special inspection work has commenced, the building official may order the special inspection work stopped. Once stopped by the building official, special inspection work may only resume upon submittal of a compliance report or other evidence that the special inspection work completed prior to the agency change complies with the approved construction documents, this chapter and the technical codes. E. Subcontracted special inspection. The prime agency designated in the special inspection agreement may subcontract special inspection services to another approved quality assurance agency. The prime agency is responsible for overall coordination and issuance of the required final report. The prime agency and the subcontracted agency shall notify the building official in writing of a subcontracting arrangement. The written notification shall identify the prime agency, the subcontracted agency, and the division of scope of work prior to commencement of the work. The engineering manager of the prime agency shall provide a written declaration that they are in responsible charge of all subcontracted special inspections. The prime agency is responsible for notifying the building official in writing of any changes in the designated subcontracted agencies. F. Waiver of special inspection. The building official may waive the requirement for the employment for an approved quality assurance agency where minor quantities or amount of work requiring special inspection are involved or when the work is performed at the facility of an approved fabricator or manufacturer. G. Special inspection requests. Special inspection requests shall be coordinated between the designated prime agency and the contractor. The permittee shall verify that the prime agency has the most current set of approved construction documents. The permittee is responsible to establish and maintain communication with the prime agency and quality assurance agency throughout the construction process. The permittee shall provide sufficient notice to the prime agency to schedule special inspection services. Construction work is subject to a stop work order for failure to establish and maintain the required special inspection process. H. Types of work requiring special inspection. Special inspection shall be as required by the technical codes. In addition, the building official may require special inspection of work identified by the building official as unique and requiring specialized knowledge to verify proper and safe construction or installation. I. Approved special inspection personnel. Special inspection personnel, fabrication shop inspectors, or quality systems auditors must demonstrate competence to the satisfaction of the building official, achieve and maintain national certification(s), as required for the special inspections to be performed, and meet the applicable requirements of the technical guidelines. The approved special inspection personnel shall be employed by an approved quality assurance agency, a design professional approved to perform special inspections, or the building official. J. Duties and responsibilities of the quality assurance agency and special inspector. Approved special inspectors and approved quality assurance agencies shall perform all duties imposed in this chapter, the technical codes, the referenced standards and the technical guidelines. The approved special inspector shall inspect the types of work identified in the special inspection agreement for conformance with the approved construction documents, the technical codes, the referenced standards and the technical guidelines. The approved special inspector shall report to the job sufficiently in advance of the commencement of work to become familiarized with the approved construction documents. The approved special inspector shall write a non-compliance report (NCR) when approved construction documents or the permit are not available on the premises at the time of special inspection. The approved special inspector shall immediately notify the contractor and shall immediately submit a copy of the noncompliance report to the building official. The approved agencies shall notify the building official in writing of commencement of special inspection activities on a project. 1. Reports. The approved special inspector is responsible for the following reports: a. Daily report by special inspector. The approved special inspector shall write daily reports and provide such other information as may be required by the building official within the scope of the special inspector's duties. The approved special inspector shall also furnish inspection reports as required by the technical guidelines. The approved special inspector shall immediately notify the contractor and the building official in writing of non-conformance with the approved construction documents or other violations of the technical codes and technical guidelines within the scope of the special inspector's activities and duties. Notification shall be within 24 hours and may be accomplished by fax or, upon approval of the building official, transmitted electronically. All daily reports prepared by a special inspector pursuant to this chapter and the technical codes and technical guidelines are the property of the City of Henderson and shall be made available upon request of the building official. b. Final reports. The approved quality assurance agency shall submit a final report to the building official stating whether all specified special inspections were completed, documented, and found to be in compliance with the approved construction documents, technical codes and technical guidelines. Final reports shall not be submitted to the building official until all non-compliance reports have been cleared by the approved quality assurance agency. Final reports shall include all non-compliance reports with dates of approval of corrective action, the completed job card and the job history record. Final reports shall be reviewed by a Nevada licensed professional engineer or registered architect and have an original signature and licensure seal prior to submittal to the building official. The stamp and original signature shall be on a cover letter that certifies the required special inspections were completed or exceptions taken and documented as being acceptable to the building official. Final reports requiring more than two reviews shall be charged fees for additional reviews on a full cost-recovery hourly rate (direct and indirect costs) specified in chapter 15.02 of the Henderson Municipal Code or calculated by the City of Henderson finance department. c. Maintenance of records. Approved agencies shall maintain records of all inspection reports, laboratory test results, and other documents generated during the performance of inspections, material testing, and other related activities on a project. Those records shall be maintained by the approved agencies for a period specified by the applicable referenced standards, but not less than two years from the date the final report was documented as approved.

(Ord. 2736, § 1 (part), 2008)