Sec. 3-141. - Permits—Required; inspection, approval of electrical work.
Except as provided in section 3-163(b) and (c), any person desiring to perform electrical work within the city or county planning jurisdiction must have a current master electrician's license, and before entering upon such work, make application to and receive a permit from the planning department to perform such work. The work done under such permit shall be inspected in four (4) phases: temporary, rough-in, set meter base and final, upon completion by the building official/inspector and approval issued by him/her before any electric energy shall be turned on to or furnished through such work or installation. (1) Application. Application for electrical permits shall be made on or before the date work is begun, on a prescribed form, and shall state the correct lot, block, and street number where the work is to be performed and the name of the owner of the property, and shall be accompanied by a readable drawing of work indicating the size and character of the material or equipment to be installed (if applicable). (2) Changes to plans. If, after a permit is issued, and it is desired to alter or deviate in any manner from the terms of the application and drawings submitted at the time of securing the permit, notice of such intentions shall be given to the building official/inspector and a correct drawing furnished to and approved by the building official/inspector or designated agent before inspection is made. (3) Revocation. A permit shall be revoked by the building official/inspector or designated agent for any material departure from the approved application and drawing, or in the event any false statement or false representation was made securing the permit. (4) Expiration. Each permit shall lapse by limitation and become void if the work is not begun within three (3) months from the date of issuance. The permit will be valid for a period of six (6) months. An extension may be granted by the building official/inspector, at no additional fee. (5) Inspection and reinspection fee. A nonrefundable inspection fee shall be paid prior to the issuance of any electrical permit. In case it becomes necessary to make a reinspection of any electrical work, the contractor shall pay a nonrefundable reinspection fee of five dollars ($5.00) per inspection.
(Code 1965, § 9-8; Ord. No. 01-0008, § I, 5-15-01)