§ 44-276 — Restoration and repair

Code of Ordinances, City of Round Rock, Texas (Supp. 27: codified through Ordinance of August 13, 2026 (online updated November 5, 2026)) · Round Rock Code of Ordinances § 44-276

Corpus is an independent public-information project, not the official City of Round Rock website. Stable reference: corpuslaw.us/code/05de091d-276f-4346-a6b3-bd5c02dae290

Sec. 44-276. - Restoration and repair.

(a) Within 14 days of completion of replacement, upgrading, excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of facilities or other work in the public rights-of-way, a utility company shall temporarily restore and repair the public rights-of-way. Within 30 calendar days after completion of work in the public rights-of-way, the utility company shall permanently restore, replace, relay and/or repair the surface, base, curbs, drainage systems, irrigation systems, landscape treatment, trees, shrubs, sidewalks, mailboxes, walls, and other city facilities and infrastructure located on, in or under any public rights-of-way that has been excavated, altered or damaged by reason of the replacement, upgrading, excavation, construction, installation, expansion, reconstruction, relocation, alteration, removal, maintenance or repair of the utility company's facilities to the condition the public rights-of-way were in before the construction or better and must receive final approval from the director. (b) Restoration to the condition the public rights-of-way were in before the construction shall be to the reasonable satisfaction of the director. The restoration shall include, but shall not be limited to: (1) Restoration of all landscaping and sprinkler systems including replacing all ground cover damaged during work with the same type of ground cover or better by sodding, seeding, or as directed by the director; (2) Installation of all manholes and handholes, as required; (3) Backfilling and compaction of all bore pits, potholes, trenches or any other excavation sites, unless other safety requirements are approved by the director; (4) Smoothing of all trenches and ruts, and restoration of the surface to the lines and grades existing prior to the work being performed, unless otherwise approved by the director; (5) Restoration of excavation site including compaction in accordance with city specifications. (c) All locate flags associated with the permitted utility project shall be removed during the cleanup process by the applicant or its contractor at the completion of the work. (d) Upon a showing of good cause, the city may, at its sole discretion, extend the time for restoration and repair of the public rights-of-way under this section. Unless the utility company provides a recent photograph or a video tape of the public rights-of-way before the construction, the condition of the public rights-of-way before construction should be presumed in good condition, subject only to reasonable wear and tear, as determined by the director. (e) A utility company shall restore any right-of-way markers or monuments disturbed or destroyed during construction activities within 30 days after construction has ceased. The utility company shall furnish three sets of drawings, blueline or blackline, detailing the restored monumentation. State plane coordinates shall be shown for all monumentation (existing or restored). The drawings shall be signed (original signature), sealed and certified by a registered professional land surveyor, and delivered to the director for approval, no later than 30 days after construction has ceased. (f) Should the director reasonably determine that additional restoration, replacement or repair work is required to restore any public rights-of-way to a condition that is at least as good as it was in before construction, the city shall provide written notice to the utility company of the need to perform such additional restoration, replacement or repair work. The utility company must begin such additional restoration, replacement or repair within ten business days of receipt of written notice and diligently pursue such work to completion. In the event repairs have not been initiated during such ten business day period or the utility company ceases to diligently pursue such work to completion, or the work is not performed to the reasonable satisfaction of the director, the city may repair such portion of the public rights-of-way as may have been disturbed by the utility company. Upon receipt of an invoice from the city, the utility company shall reimburse the city for the costs so incurred within 30 calendar days from the date of the invoice. The city may, for good cause, extend the ten-business-day period. (g) Notwithstanding the foregoing in subsection (f) of this section, if the director determines that the failure of the utility company to properly repair or restore the public rights-of-way constitutes a safety hazard to the public, the city may undertake emergency repairs and restoration efforts, after emergency notice has been provided, to the extent reasonable under the circumstances, and the utility company failed to respond within a reasonable time specified by the city. Upon receipt of an invoice from the city, the utility company shall reimburse the city for all costs incurred by the city within 30 calendar days from the date of the city invoice.

(Ord. No. G-07-09-12-10E1, § I(10.907), 8-9-2007)

Ask a question about Round Rock law

Corpus searches the Round Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.