For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Construction

49 C.F.R. Part 195, Subpart D
in effect

49 C.F.R. § 195.200 Scope.

49 C.F.R. § 195.202 Compliance with specifications or standards.

49 C.F.R. § 195.204 Inspection—general.

49 C.F.R. § 195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.

49 C.F.R. § 195.206 Material inspection.

49 C.F.R. § 195.207 Transportation of pipe.

49 C.F.R. § 195.208 Welding of supports and braces.

49 C.F.R. § 195.210 Pipeline location.

49 C.F.R. § 195.212 Bending of pipe.

49 C.F.R. § 195.214 Welding procedures.

49 C.F.R. § 195.216 Welding: Miter joints.

49 C.F.R. § 195.222 Welders and welding operators: Qualification of welders and welding operators.

49 C.F.R. § 195.224 Welding: Weather.

49 C.F.R. § 195.226 Welding: Arc burns.

49 C.F.R. § 195.228 Welds and welding inspection: Standards of acceptability.

49 C.F.R. § 195.230 Welds: Repair or removal of defects.

49 C.F.R. § 195.234 Welds: Nondestructive testing.

49 C.F.R. § 195.246 Installation of pipe in a ditch.

49 C.F.R. § 195.248 Cover over buried pipeline.

49 C.F.R. § 195.250 Clearance between pipe and underground structures.

49 C.F.R. § 195.252 Backfilling.

49 C.F.R. § 195.254 Above ground components.

49 C.F.R. § 195.256 Crossing of railroads and highways.

49 C.F.R. § 195.258 Valves: General.

49 C.F.R. § 195.260 Valves: Location.

49 C.F.R. § 195.262 Pumping equipment.

49 C.F.R. § 195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.

49 C.F.R. § 195.266 Construction records.