33.430.170 Standards for Resource Enhancement Projects
The following standards apply to resource enhancement projects in the environmental zones. The applicant for projects that will take place within the area shown on Map 430-10 may choose to meet all of the standards of subsection A, all of the standards of subsection B, or all of the standards of subsection C, or all of the standards in subsection D. Applicants for projects that will take place outside the area shown on Map 430-10 must meet all of the standards in subsection C or subsection D. A. Bank reconfiguration. The following standards apply to bank reconfiguration projects that take place in the Bank Reconfiguration and Basking Features Area shown on Map 430-10. Slough and drainageway banks, which are the area between the ordinary high water mark and the top of bank, may be regraded when all of the following are met: 1. The activity is conducted or authorized by the Urban Flood Safety and Water Quality District; 2. The final slope above ordinary high water after grading is 33 percent or less (33 percent slope represents a rise to run ratio equal to 1:3); 3. Rock armoring may not be used except surrounding outfalls, inlets, culverts and bridge crossings, the rock armoring cannot exceed a distance of 5 feet from those features, and must be planted with live stakes of native plant stock, one half inch in diameter. Stakes must be used at a density of 2 to 3 stakes per 9 square feet. If the armoring is located on a levee, live stakes are not required; 4. The placement of large wood on the bank is allowed to improve bank stabilization if installed above the Base Flood Elevation (BFE), as defined on the Federal Emergency Management Agency Flood Insurance Rate Maps; 5. Trees or snags, 6 inches or greater in diameter, that are removed landward of the new top-of-bank must be replaced and meet the following: a. Each tree or snag, 6 inches or greater in diameter, removed must be replaced as specified in Table 430-3, Option A or Option B; b. Replacement trees and shrubs must be native and selected from the Portland Plant List; c. Replacement shrubs must be in at least a 2-gallon container or the equivalent in ball or burlap; d. Replacement trees must: (1) Be at least one-half inch in diameter and have a maximum height-at- maturity that will not project above the height limit of the h overlay zone; and (2) Be planted within a transition area or resource area on a property owned by the applicant; or for which the applicant possesses a legal instrument that is approved by the City (such as an easement or deed restriction) sufficient to carry out and ensure success of the mitigation; or can demonstrate legal authority to acquire the site through eminent domain; e. If the replacement trees are planted within 100 feet of the Columbia Slough main channels or secondary drainageways, the trees must be planted above the Base Flood Elevation (BFE), as defined on the Federal Emergency Management Agency Flood Insurance Rate Maps. 6. The area between the ordinary high water mark and the new top of bank must be revegetated as specified in Figure 430-3 and Table 430-7, Bank Revegetation. Figure 430-3 Bank Revegetation


Table 430-7 Bank Revegetation

7. Disturbance areas related to structure removal must be replanted with native plants to achieve a 90 percent vegetative cover within one year. Disturbance area that is related to the removal of structures from the water is exempt from this standard; 8. No structures are proposed except for public viewing areas developed as part of the project. The public viewing areas must meet the following: a. The viewing area contains no more than 500 square feet of permanent disturbance area; b. The viewing area is at least 30 feet from the top of bank of a stream, drainageway, wetland, or other water body; c. The viewing area is not in the floodway; d. Outside the combined flood hazard area: (1) Native trees more than 10 inches in diameter are not removed; and (2) Each 6 to 10-inch diameter native tree removed is replaced at a rate of three trees for each one removed. The replacement trees must be a minimum one-half inch diameter or 3 to 5-gallon conifers and be native trees listed on the Portland Plant List. All trees must be planted on the site; e. Within the combined flood hazard area: (1) Native and non-native non-nuisance trees more than 10 inches in diameter are not removed; and (2) Each 6 to 10‐inch diameter native or non-native non-nuisance tree removed is replaced at a rate of three trees for each one removed. The replacement trees must be a minimum one‐half inch diameter or 3 to 5‐gallon conifers and be native trees listed on the Portland Plant List. All trees must be planted on the site. 9. Temporary disturbance areas may be seeded with non-native seed that is sterile and is certified as 100 percent weed-free for erosion control purposes until replanting occurs. B. Basking features. The following standards apply to the placement of large wood or large rocks as basking features for wildlife in the Bank Reconfiguration and Basking Features Area shown on Map 430-10. The placement of large wood or large rocks as basking features for wildlife within the Columbia Slough, Whitaker Slough, Buffalo Slough, Peninsula Canal, or other drainageways or identified wetlands is allowed when all of the following are met: 1. The activity is conducted or authorized by the Urban Flood Safety and Water Quality District or the City of Portland Bureau of Environmental Services; 2. No native trees are removed and no non-native non-nuisance trees are removed within the combined flood hazard area; 3. The basking feature is installed above the Base Flood Elevation (BFE), as defined on the Federal Emergency Management Agency Flood Insurance Rate Maps; 4. Disturbance areas related to structure removal must be replanted with native plants to achieve a 90 percent vegetative cover within one year. Disturbance area that is related to the removal of structures from the water is exempt from this standard; 5. No structures are proposed except for public viewing areas developed as part of the project. The public viewing areas must meet the following: a. The viewing area contains no more than 500 square feet of permanent disturbance area; b. The viewing area is at least 30 feet from the top of bank; c. The viewing area is not in the floodway; d. Outside the combined flood hazard area: (1) Native trees more than 10 inches in diameter are not removed; and (2) Each 6 to 10-inch diameter native tree removed is replaced at a rate of three trees for each one removed. The replacement trees must be a minimum one-half inch diameter or 3 to 5-gallon conifers and be native trees listed on the Portland Plant List. All trees must be planted on the site; e. Within the combined flood hazard area: (1) Native and non-native non-nuisance trees more than 10 inches in diameter are not removed; and (2) Each 6 to 10‐inch diameter native or non-native non-nuisance tree removed is replaced at a rate of three trees for each one removed. The replacement trees must be a minimum one‐half inch diameter or 3 to 5‐gallon conifers and be native trees listed on the Portland Plant List. All trees must be planted on the site; and 6. Temporary disturbance areas may be seeded with non-native seed that is sterile and is certified as 100 percent weed-free for erosion control purposes until replanting occurs. C. Tethered floating features. The following standards apply to the installation of tethered floating wetland features. Installation of these features is allowed when all of the following are met: 1. The activity is conducted by the Urban Flood Safety and Water Quality District, as defined by ORS 550, the City of Portland Bureau of Environmental Services, or the Port of Portland; 2 No native trees are removed and no non-native non-nuisance trees are removed within the combined flood hazard area; 3. Temporary disturbance areas must be replanted so that the area achieves a 90 percent vegetation cover within one year; 4. Installation of anchors or mounting hardware for tethers is conducted using hand-held equipment only; and 5. Other than the installation of anchors or mounting hardware for tethers, there is no excavation or fill; D. All other resource enhancement projects. The following standards apply to all other resource enhancement projects not addressed by subsections 170.A, B, or C. All of the following standards must be met: 1. There is no excavation or fill of, or construction activity within any wetland or water body; 2. There is no net fill, or increase in the amount of soil on the site; 3. Outside the combined flood hazard area, no native vegetation listed on the Portland Plant List is removed except as allowed by C.6. below. Non-native trees and vegetation may be removed; 4. Within the combined flood hazard area, no native trees or vegetation listed on the Portland Plant List or non-native non-nuisance trees are removed, except as allowed by C.6. below; 5. Disturbance areas related to structure removal must be replanted with native plants to achieve a 90 percent vegetative cover within one year. Disturbance area that is related to the removal of structures from the water is exempt from this standard; 6. No structures are proposed except for public viewing areas developed as part of the project. The public viewing areas must meet the following: a. The viewing area contains no more than 500 square feet of permanent disturbance area; b. The viewing area is at least 30 feet from the top of bank; c. The viewing area is not in the floodway; d. Outside the combined flood hazard area: (1) Native trees more than 12 inches in diameter are not removed; and (2) Each 6 to 12-inch diameter native tree removed is replaced as shown in Table 430-3, Option A. Replacement trees and shrubs must comply with the planting standards of Subsection 33.430.140.K; e. Within the combined flood hazard area: (1) Native and non-native non-nuisance trees more than 12 inches in diameter are not removed; and (2) Each 6 to 12‐inch diameter native and non-native non-nuisance tree removed is replaced as shown in Table 430‐3, Option A. Replacement trees and shrubs must comply with the planting standards of Subsection 33.430.140.K; and 7. Temporary disturbance areas may be seeded with non-native see that is sterile and is certified as 100 percent weed-free for erosion control purposes until replanting occurs.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.