For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 74-503 — Definitions

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-503

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/07ea0476-b7fc-436d-b1ce-ccaa088f9129

Sec. 74-503. - Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings defined in this section, except where the context clearly indicates a different meaning: Alternative compliance process means the process set out in section 74-524. Applicant means a person submitting an application for a permit and includes a person that undertakes new development or redevelopment. Application for sewer service capacity means an application submitted to the department, in a form approved by the commissioner, requesting certification that the combined sewer system or the separated sewer system, as the case may be, has adequate capacity to convey the wastewater generated by the new development or redevelopment. BMP means both structural devices to store or treat runoff and non-structural programs or practices which are designed to prevent or reduce the pollution of the waters of the state. Channel means a natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water. City means the City of Atlanta, a municipal corporation of the State of Georgia. Code means the Atlanta City Code. Combined sewer system means the city's system of pipes, tunnels, combined sewer control facilities, and other infrastructure that are designed to collect runoff, domestic sewage, and industrial wastewater in the same pipe. The boundaries of the combined sewer system are as shown generally in, but is not limited to, the Department's GIS system. Commissioner means the commissioner of the department or his/her designee. Conservation easement means an agreement between a land owner and the City of Atlanta, other government agency, or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership. Construction sequencing plan means a plan that identifies Infiltration zones and BMP locations, as well as a description of the sequence of construction and staged installation of permanent post-development BMPs that will protect infiltration zones and ensure suitable site conditions in areas designated for BMPs. Demolition means removal of an existing building, structure, or other impervious surface. Department means the city's department of watershed management. Determination of infeasibility means a determination made by the commissioner in accordance with section 74-523. Development means land disturbing activity, the installation of impervious surface, structural development (construction, installation or expansion of a building or other structure) that requires a permit, or linear transportation projects. Erosion and sedimentation control plan means a plan, in accordance with Chapter 74 Article II of the Code, the Georgia Erosion and Sedimentation Control Act, and any NPDES Permit for construction activities, that is designed to minimize the accelerated erosion and sediment runoff at a site during construction of a development. Extended detention means the temporary storage of runoff in a stormwater management facility to control the peak discharge of runoff for an extended period of time. Extreme flood protection means measures taken to prevent adverse impacts from large low- frequency storm events with a return frequency of 100 years or more. Flooding means a volume of water that is too great to be confined within the banks or walls of a conveyance or stream channel and overflows onto adjacent lands. Georgia Stormwater Management Manual means the latest edition of the Georgia Stormwater Management Manual, Volume 2: Technical Handbook, and its Appendices. Green infrastructure means an interconnected natural system and/or engineered system that strengthens and mimics natural hydrologic functions and processes through the use of plants and soil to slow, filter, evapotranspirate, and infiltrate runoff close to its source; or the capture and reuse of runoff. High risk operation means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater as consistent with facilities operating under a Standard Industrial Code or requiring coverage under the Georgia General NPDES Permit for Stormwater Discharges associated with industrial activities or as identified as a highly visible pollutant source per the City's Stormwater Management Plan developed in accordance with the requirements of the MS4 Permit. Hotspot means development on a site that has the potential to produce pollutant loads in runoff that are higher than normally found in runoff. Impervious surface means a surface composed of any material that significantly impedes or prevents infiltration, which includes, but is not limited to, rooftops, buildings, streets and roads, and standard concrete or asphalt surface. Infiltration means the process of absorption of runoff into the subsoil. Land Development Code means Part III of the Code. Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into waters of the state or onto lands within the state, including but not limited to clearing, dredging, grading, excavating, and filling of land. Landscape architect means a person who possesses a current license issued by the Georgia Board of Landscape Architects. Linear transportation project feasibility policy means the feasibility policy adopted by the commissioner, in accordance with section 74-516 which sets reasonable criteria for determining when it is infeasible to implement the stormwater management standards for linear transportation projects. Linear transportation projects means construction projects for the purpose of road, air, or pedestrian transportation, on public or private rights-of-way, including but not limited to roads, sidewalks, multi-use paths and trails, and airport runways and taxiways. Linear transportation projects do not include resurfacing, or construction of driveways used to access development. MS4 permit means the NPDES permit issued to the city for discharges from the Municipal Separate Storm Sewer System. Municipal Separate Storm Sewer System means a conveyance or system of conveyances including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels or storm drains, owned or operated by the city, designed or used for collecting or conveying Runoff and is not a combined sewer or part of a publicly owned treatment works. New development means development on a previously undeveloped site. Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a wastewater treatment facility or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials, and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal, and urban runoff. Nonstructural stormwater management measure means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels. NPDES permit means a national pollutant discharge elimination system permit issued by the Georgia Environmental Protection Division and in effect at the time of an application for a permit to which this article applies. Off-site facility means a stormwater management facility located outside the boundaries of the site. Operation and maintenance agreement means a written agreement in accordance with section 74-517. Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain). Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person in control of the site and includes their agent. Permit means the permit issued by the city to the applicant which is required for undertaking any development. Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity. Post-development means the conditions anticipated to exist on-site immediately after completion of the development on a site. Pre-development means the conditions that exist, on a site immediately before the implementation of a development. Where phased development or plan approval occurs, which includes but is not limited to demolition, preliminary grading, roads and utilities, the existing conditions at the time before issuance of the first development-related approval or permit shall represent pre-developed conditions, in accordance with section 74-513(d). Pre-development hydrology means (a) for new development, the runoff curve number determined using natural conditions hydrologic analysis based on the natural, undisturbed condition of the site as described in section 74-513(d) immediately before implementation of the proposed development; and (b) for redevelopment, the existing conditions hydrograph may take into account the existing development when defining the runoff curve number and calculating existing runoff, unless the existing development causes a negative impact on downstream property. Professional engineer means a person who possesses a current certificate of registration as a professional engineer issued by the Georgia State Board of Registration for Professional Engineers and Land Surveyors. Redevelopment means development of a site that is not an undeveloped site. Regional stormwater management facility means stormwater management facilities designed to control runoff from multiple properties, and the requirement for site-specific on-site controls may be either eliminated or reduced. Resurfacing means road repair activities that consists of mill and overlay projects, pavement rehabilitation or pot-hole repair projects that do not alter soil material beneath the pavement or impervious surface. Runoff means the flow of surface water resulting from precipitation. Runoff reduction means the interception, evapotranspiration, infiltration, or capture and reuse of runoff. Runoff reduction feasibility policy means the feasibility policy adopted by the commissioner in accordance with section 74-516, which sets reasonable criteria for determining when it is infeasible to implement the stormwater management standards for development other than linear transportation projects. Single-family residence means a building that contains one or two dwellings only. Single-family residential development has the meaning set out in section 74-504(b). Site means an area of land where development is planned, which may include all or portions of one or more parcels of land. For subdivisions and other common plans of development, the site includes all areas of land covered under an applicable permit. Stormwater better site design means nonstructural site design approaches, practices and techniques, especially those described in Sections 2.3 and 2.4 of the Georgia Stormwater Management Manual, that reduce a site's impact on the watershed by preserving natural resources and drainage features, effectively laying out elements of development to prevent or reduce environmental impacts, reduce the area and connectivity of impervious surfaces, and conserve trees and natural features on the site for the purpose of stormwater management. Stormwater consultation meeting certification means the certification issued under section 74-510. Stormwater management means the collection, retention, detention, conveyance, storage, treatment, and disposal of runoff in a manner intended to prevent increased flooding, streambank channel erosion, habitat degradation, water quality degradation, and to enhance and promote the public health, safety, and general welfare. Stormwater management facility means any infrastructure that controls or conveys runoff. Stormwater management measure means any structural stormwater control or nonstructural stormwater management measure. Stormwater management plan means the plan required by section 74-511 or 74-515, as applicable. Stormwater management standards means those standards set out in section 74-513. Stormwater management system means all the structural stormwater controls and nonstructural stormwater management measures that are used to capture, convey, and control the quantity and quality of the runoff from a site. Stormwater planting plan means the plan required by section 74-511. Structural stormwater control means a structural stormwater management facility or device that controls runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release, or the velocity of flow of such runoff. Examples include, but are not limited to, dry detention basins, stormwater ponds, and underground vaults. Subdivision means the division of an existing parcel into two or more new parcels, or the consolidation of two or more existing parcels into a single parcel, or the consolidation of two or more existing parcels and their simultaneous redivision, along new boundaries, into two or more new parcels, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway. Undeveloped site means a site that has not been altered by development. Vegetated green infrastructure means green infrastructure that uses trees, shrubs, grasses, or other vegetation along with amended or engineered soils to intercept, retain, infiltrate, and evapotranspire runoff. Examples include, but are not limited to, green roofs, bioretention, bioswales, and stormwater planters.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.