For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 74-304 — Stream crossing requirements

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-304

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/080234de-e703-433c-a3af-9bef01868a67

Sec. 74-304. - Stream crossing requirements.

Construction or repair of structures that cross streams, including but not limited to those exempt under section 74-305, shall be subject to the following: (a) A hydraulic analysis prepared, signed, and sealed by an engineer registered to practice in the State of Georgia is required for any proposed stream crossing. The analysis shall demonstrate that the proposed crossing will not adversely impact upstream and downstream properties during a 100-year flood; and (b) Free-span techniques shall be employed to prevent blockage or constriction of natural drainage ways; and (c) Approximately perpendicular crossing angles shall be employed; provided, however, crossings shall be aligned to minimize buffer disturbance to the maximum extent practicable; and (d) Best management practices shall be utilized, stream banks shall be properly stabilized, and buffers shall be vegetated in accordance with the City of Atlanta Buffer Revegetation Guidelines.

(Ord. No. 2001-100, § 3, 12-11-01; Ord. No. 2002-21, § 3, 3-26-02; Ord. No. 2010-13(10-O-0058), § 5, 4-27-10)

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.