Identification of eligible sites.
R.I. Gen. Laws § 42-140.5-3
in effect42-140.5-3. Identification of eligible sites.
(a) The office, in coordination with the department, shall prepare a list of locations
that meet the following criteria:
(1) Is a current or former contaminated site as determined by the department;
(2) Is property or a facility owned and/or managed by the state;
(3) Is a rooftop of a public, municipal, or state-owned building;
(4) Is state property adjacent to a highway or major road; or
(5) Is owned by the electric distribution company and subject to the environmental response
fund.
(b) The list shall exclude properties where the owner has begun the process of permitting
or developing a renewable energy generation project or any other development.
(c) The list shall:
(1) Include a reasonable estimate of the renewable energy production capacity of the locations;
(2) Identify the current owner of the property and provide their contact information,
if available;
(3) Include a reasonable estimate of any utility interconnection costs that would be required
to connect the project to the existing electricity transmission and distribution system;
provided that:
(i) Any available impact study shall be conclusive evidence of estimated costs;
(ii) Any variables that the office or department relied upon in the creation of the estimate
shall be included and described;
(iii) The electric distribution company shall provide estimated interconnection costs to
the office as sites are identified;
(iv) The cost of an interconnection study shall not be included in the estimation of interconnection
costs; and
(4) Prioritize locations based upon surrounding infrastructure that can support the development
of distributed generation resources.
P.L. 2024, ch. 314, § 1, effective June 25, 2024; P.L. 2024, ch. 315, § 1, effective
June 25, 2024.
Source: State of Rhode Island General Assembly (rilegislature.gov)URL: https://webserver.rilegislature.gov/Statutes/TITLE42/42-140.5/42-140.5-3.htmFetched: 10/20/2026