§ 3369.03 — Required performance standards and conditions
Columbus City Codes; partial (Supp. No. 86: codified through Ordinance No. 2063-2026, enacted July 2, 2026) · Columbus City Codes § 3369.03
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/094cb74f-6663-41b5-b2e3-4b63f9075d78
3369.03 - Required performance standards and conditions.
In addition to the requirements of the performance standards of C.C. Section 3311.16, the following performance standards and conditions shall be complied with in the excavation of gravel or sand or the quarrying of stone in the EQ district: (a) All equipment used in these operations shall be constructed, maintained and operated in such a manner as to eliminate as far as practicable, noise, vibration or dust which would injure or annoy persons living in the vicinity, and accessways or roads within the premises shall be maintained in a dust-free condition through surfacing or such other treatment as may be necessary. (b) No quarrying or gravel or sand extraction shall be permitted nearer than 50 feet to the boundary of the EQ district. (c) In order to insure adequate lateral support, all sand and gravel excavations shall be located at least 100 feet and backfilled to at least 150 feet and all quarrying or blasting shall be located at least 50 feet from the right-of-way line of any existing or platted street, road, highway or railway, except that such excavation or quarrying may be permitted within these limits to the point of reducing the ground elevation to the grade of the existing or platted street, road or highway where officially approved by the director of public service and/or their designee. (d) No excavation of gravel or sand shall be made from the banks or beds of the Scioto and Olentangy Rivers, or the Big Walnut, Little Walnut, Big Darby, Little Darby, Rocky Ford, Blacklick or Alum Creeks unless approved by the director of public service and/or their designee with the finding that such excavation will not impair the lateral support needed for permanent stream levees. (e) All excavations of gravel or sand shall either be made to a water-producing depth, plus five feet or graded or backfilled with non-noxious and nonflammable solids to assure (1) that the excavated area will not collect and retain stagnant water or (2) that the graded or backfilled surface will create a gently rolling topography to minimize erosion by wind and rain and substantially conform with the contours of the surrounding area. The banks of all excavations not backfilled shall be sloped to the water line at a grade of not less than two feet horizontal to one foot vertical and such banks shall be sodded or surfaced with at least six inches of suitable soil and seeded with grass. Spoil banks shall be graded to a level suiting the existing terrain and planted with trees, shrubs, legumes or grasses where re-vegetation is possible. Where flood water exists, spoil banks shall be high enough to prevent overflow of water in the gravel pits and shall be sloped, graded and seeded as prescribed herein. (f) Whenever the floor of a quarry is more than five feet below the average grade of the street, road, highway or land adjacent thereto, the property containing such quarry shall be completely enclosed by a barrier consisting of not less than a six-foot mound of earth planted with suitable dense planting or other suitable material sufficient in either case to prevent persons from trespassing thereon or passing through. Such mound shall be located at least 25 feet from any street, road, highway or the boundary of the EQ district. (g) No quarrying shall be permitted closer than 200 feet to either bank of the Scioto River unless approved by the director of public service and/or their designee with the finding that adequate lateral support will be provided for permanent river levees. (h) All quarrying, blasting or drilling shall be carried out in compliance with the requirements of C.C. Section 3311.16 on performance standards, provided, however, that until such time as adequate equipment, staff, and facilities or outside technical assistance is available to conduct the measurements, test and analyses required for enforcement of such performance standards, the building inspector may require the quarry operator to submit other satisfactory proof that all quarrying, blasting and drilling will be conducted in such a manner and on such scale as to minimize dust, noise and vibration and to prevent adversely affecting the surrounding neighborhood. (i) When any quarrying has been completed, such excavated area shall either be left as a permanent spring-fed lake or the bottom or floor thereof shall be leveled to prevent the collection and stagnation of water to provide proper drainage without excessive soil erosion, and said floor shall be covered with soil of adequate thickness for the growing of turf or other ground cover. The edge of such excavation shall be further protected by construction of a barrier consisting of not less than a six-foot mound of earth planted with a double row of multiflora rose bushes or other equally effective planting.
(Ord. No. 0128-2009, § 1, 2-9-2009)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.