Sec. 2.246. - Offsite Mitigation and Payment-in-lieu.
(1) The water quality treatment and channel protection performance standards focus on maintaining or restoring stable hydrology. However, potential physical constraints may limit the ability to fully meet the post-construction requirement at the project site. When physical constraints limit the feasibility of maintaining or restoring hydrology, offsite mitigation and/or payment-in-lieu may be approved by the City. Offsite mitigation will only be considered if there is a planned or constructed private mitigation bank or project immediately downstream. the City will only consider payment-in-lieu if the City has a planned or constructed water quality improvement project immediately downstream. The cost of payment-in-lieu will be considered on a case to case basis and will represent the actual cost of implementing public downstream water quality enhancements. Any request for payment-in-lieu shall be accompanied by a development agreement that clearly states a public/private partnership has been formed for the site development. Payment-in-lieu will be considered, at the discretion of the City, when reviewing a project of regional significance. (2) Consideration of either off-site mitigation or payment-in-lieu will be entirely the discretion of the City. (3) Offsite mitigation refers to BMPs implemented at a location different from the original project site. (4) Payment-in-lieu refers to the developer paying a fee to the City that is applied to a public stormwater management project. The stormwater management project may be either a new BMP or a retrofit to an existing BMP and developed in accordance with the Stormwater Standards Manual. (5) The location for offsite mitigation and payment-in-lieu projects shall be within the same watershed and Sewershed as the original project, and within the City's jurisdictional boundaries. The watershed is the area represented by the State of Michigan, EGLE, ten (10) digit Hydrologic Unit Code (HUC). The Sewershed is the area where stormwater is conveyed by an MS4 to a common outfall or point of discharge. (6) The determination to approve offsite mitigation or payment-in-lieu will be based on multiple criteria and not solely on the difficulty of cost of implanting BMPs on site. Conditions under which the option to move offsite would become available may include: (a) Limited size of the lot outside of the building footprint to create the necessary infiltration capacity even with amended soils. (b) Soil instability as documents by a thorough geotechnical analysis. (c) A site use that is inconsistent with capture and reuse of stormwater. (d) Too much shade or other physical conditions that preclude adequate use of plants. (e) The potential water quality impact from the original project site and the benefits realized at the offsite location. (7) The City may approve offsite mitigation or payment-in-lieu if the developer demonstrates that site constraints preclude sufficient treatment and restoration of hydrology onsite. At a minimum the City requires: (a) Offsite ratio. The offset ratio for the amount of stormwater not managed onsite in relation to the amount of stormwater required to be mitigated at another site, or for which in-lieu payments will be made as follows: 1. First Tier: Manage a minimum of zero point four (0.4) inches of stormwater runoff onsite and provide a one (1) to one point five (1.5) offset ratio for the remaining amount of stormwater managed offsite. 2. Second Tier: If it completely infeasible to manage the minimum onsite, provide a one to two (1:2) offset ratio for the amount of stormwater managed onsite. (b) Schedule. Offsite mitigation and payment-in-lieu projects shall be completed within twenty-four (24) months after the start of the original site construction. (c) Assurances. Offset and in-lieu projects shall be preserved and maintained in perpetuity through the procedures and tracking system administered by the City.
(Ord. No. 2022-20, § 1, 7-26-22)
Ask a question about Grand Rapids law
Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.