Sec. 16-142. - Tapping fee sewers.

(1) Generally. Should the city council pursuant to section 16-85 of the city code elect to extend or alter or otherwise construct nonassessment sanitary sewers, mains, or interceptors, etc., including pump stations and related appurtenances, it may determine by resolution to recover the cost thereof from those electing to benefit from its service as herein defined by designating the same pursuant to the provisions hereof as a tapping fee sewer which will automatically, pursuant to the terms hereof, establish that each dwelling unit or premises electing to connect to such sewer shall pay a tapping fee. (2) Findings. On October 21, 1991, the City Council of the City of Tuscaloosa enacted Ordinance No. 3317 which established a mechanism whereby the city would construct sanitary sewers and related facilities, and endeavor to recoup the cost thereof from those electing to access the same. During the decade since the enactment of Ordinance No. 3317, ten (10) tapping fee sewers were constructed by the city at a cost in excess of twenty-four million dollars ($24,000,000.00). The policy of calculating and linking tapping fees only to the respective cost of the applicable sewer resulted in a different fee for each sewer, multiple tapping fees for interconnecting sewers, and variances in tapping fees, even in the same area. These circumstances may have contributed to general confusion and misunderstandings by homeowners and created the misimpression that tapping fees were not being imposed consistently. The situation also placed a substantial burden upon the city departments to insure that the fees were properly calculated and assigned to the correct addresses, that fees were paid for multiple accesses and were properly allocated to the sewers to which they applied and to make certain that all the financial calculations and reports were made to accurately track each payment to the sewers to which they were attributable. This system became so cumbersome as to be an unacceptable administrative burden and drain upon the city's resources. The most viable alternative to alleviate the situation and enable the city to continue to make sanitary sewers available to those that would otherwise not have access to public sewers was to combine the construction costs of all tapping fee sewers into one construction cost figure (combined cost) then determine the average cost recovery factor per connection in dollars per gallon per day from the preceding decade of tapping fee sewers and utilize that factor as a relative constant to calculate all tapping fees. This results in all persons of the same usage electing to connect to any city tapping fee sewer paying the same tapping fee (uniform tapping fee), with the fees being deducted from the combined cost (combined net cost). It is the city's belief that such a system will simplify administration, be uniform and consistent, treating all persons similarly situated equally while leveling fees to stimulate development and simultaneously allowing the city the financial ability to recoup its sewer construction cost. (3) Cost considerations peculiar to tapping fee sewers. Tapping fee sewers are utilized to provide sewer service to potential establishments that may not otherwise have sewer service available. There are financial risks inherent with tapping fee sewers which do not necessarily exist in regard to other types of sewer projects. Such risks include, but are not limited to, the fact that should the anticipated number and classification of new connections not materialize, the city will not recoup the cost it incurred. Also, the calculation of all project-related expenses (including future expenses directly or indirectly related to the tapping fee sewer) and the estimate of anticipated revenues from tapping fees (which depends on the number and classification of connections) are best judgment decisions of the city based upon factors available at the time. Factors such as economic conditions, the inability to place liens on property, the inability to mandate connection, the proportion of preexisting development not requiring sewers, and inaccurate estimates of the density and type of development, etc., may adversely affect the anticipated quantity or rate of connection. Should the anticipated rate of connections or classifications not materialize or should the total amount of connected flow be less than the design flow, the city may fail to recover its investment. (4) Calculation of construction cost as combined cost and net combined cost. If the city council has enacted a resolution declaring that the cost of a sewer is to be recovered by a tapping fee then upon completion of a tapping fee sewer, if not already completed, the city engineer shall calculate the construction costs thereof, and shall include all costs and expenses related, either directly or indirectly, to the same including, but not limited to, design, right-of-way or easement acquisition, legal expenses and fees, construction, engineering services, cost of equipment and facilities, construction administration, claims, damages, interest, finance costs and all other related costs. The construction cost shall also include the costs of facilities associated with or downstream of the tapping fee sewer regardless of whether or not such facilities are constructed at the time of the tapping fee sewer itself. Such improvements can include, but are by no means limited to, paralleling or replacement of existing or proposed sewers; expansion, rehabilitation, upgrading or replacement of pumping stations; sewer system rehabilitation to remove existing or anticipated infiltration or inflow; and other facilities required to provide adequate collection and treatment of wastewaters. The city engineer shall notify the director of the water and sewer department, the chief building official and the finance director of the amount of the construction cost of the tapping fee sewer. The chief building official shall maintain financial and accounting records reflecting the combined cost and the net combined cost. He shall add the amount provided by the city engineer to the current net combined cost which amount shall then constitute the net combined cost. The chief building official shall then notify the city engineer, director of finance, and the director of the water and sewer department of the new net combined cost. (5) Average cost recovery factor. To calculate the uniform tapping fee, the average cost recovery factor for tapping fee sanitary sewers is hereby initially established to be five dollars and sixty-seven cents ($5.67) per gallon per day (gpd) being the average cost recovery factor in dollars per gallon per day. (6) Minimum flow per access. The minimum flow per connection shall be calculated by the city engineer in accordance with the flow rates shown in Exhibit A, "Minimum flow allowances for domestic wastewater*," a copy of which is on file with the city engineer). These figures shall be considered as minimum values and may be adjusted upward if deemed appropriate. For other types of development not listed in Exhibit A, the flow estimate shall be determined by the city engineer in accordance with accepted engineering practice. Provided, however, that the provision of sufficient safety factors shall be made to accommodate actual flow within the flow allowance. (7) Uniform tapping fee. (a) There is hereby established a uniform tapping fee as herein defined as follows: Tapping fees shall no longer be calculated, assessed or collected in relation to a specific tapping fee sewer or sewers, but instead, the cost per connection to take the form of a uniform tapping fee as herein defined shall be calculated by the city engineer by multiplying the average cost recovery factor by the minimum flow per access as determined above. From and after the effective date of the ordinance adopting this section, all tapping fees shall be the uniform tapping fees to be calculated pursuant to the provisions hereof. (b) The chief building official shall administer and enforce the provisions for the collection of uniform tapping fees as herein established. All uniform tapping fees shall be deducted from the net combined cost when paid. At such time as all net combined costs have been recouped by the procedure herein established so that there are no remaining net combined costs, the imposition and collection of uniform tapping fees shall terminate. While certain uniform tapping fees for access to tapping fee sewers are waived, pursuant to the provisions of section 16-143(b), the amount that would otherwise have been charged for access in accordance with the terms of this section shall likewise be deducted by the chief building official from the net combined cost. The chief building official shall periodically remit all uniform tapping fees collected to the finance department which shall account for such funds in such a manner as to utilize the same solely for debt service, maintenance and operational cost of the city water and sewer department. (c) The city reserves the right to monitor water usage, wastewater flow, and other factors relevant to tapping fees and to adjust the minimum flow allowance, average cost recovery factor or uniform tapping fees based on the actual water usage, or wastewater flow where the water usage or wastewater flow is higher than the amount utilized in calculating the tapping fee or any factor indicating that fees are inadequate to retire the city's financial commitments within a reasonable period of time. If any change in the use of an establishment or potential establishment would alter its classification, then it will be required to pay any increase in tapping fee cost. Further, should there occur any change in the establishment or potential establishment subsequent to the calculation or payment of a tapping fee, including, but not limited to, remodeling, construction, enlargement or improvement of the same, to such an extent that the tapping fee would be increased had such change existed at the time of original calculation or payment, then it will be required to pay any such increase in tapping fee. (8) [Effective dates.] The provisions of this division shall take effect for the "Old Greensboro Road and Hillcrest School Road" tapping fee sewer, the "Englewood" tapping fee sewer and the "Black Warrior Parkway Phase I" tapping fee sewer, on and after August 12, 2002, and for all other tapping fee sewers, on and after January 1, 2003, and shall apply to all access or connections to tapping fee sewers in accordance with the terms and conditions of the division and other applicable provisions of the City Code.

(Code 1962, § 33-75; Ord. No. 6331, §§ 1, 2, 5-2-02; Ord. No. 6355, 8-8-02)