Sec. 49-81. - Permit.
(a) Permit application. A network provider must submit an application for a permit prior to installing a network node, node support pole, or transport facility in the public rights-of-way and prior to any excavating or closing sidewalks or vehicular lanes in a public right-of-way in association with any routine maintenance, replacement, repair, or upgrading work. An application will not be deemed complete unless it includes: (1) Detailed drawings, with calculations to show strict conformity to the size limitations as set forth in Ch. 284, including, but not limited to Ch. 284 § 284.002, size of a micro-network node, § 284.003, size of network nodes, and § 284.103, maximum pole height, and with the requirements of this article, the rights-of-way maintenance ordinance, and the pole attachment specifications; (2) An analysis showing that the proposed wireless facility(ies) will not cause any interference with city public safety radio systems, utility supervisory control and data acquisition systems (SCADA), electric automation systems, metering networks, traffic signal light systems, or other city utility or safety communications components in accordance with Ch. 284 § 284.304, or interfere with motorists' sight distance at an intersection as defined by the American Association of State Highway and Transportation Officials (AASHTO) in the "A Policy on Geometric Design of Highways and Streets"; (3) A proposal to camouflage or conceal the network node consistent with the requirements of this article; (4) Disclose whether the location is any of the following: a. Within a municipal park; b. Within an area zoned for residential use; c. Within a design district utilizing decorative poles or in an area of the city zoned or otherwise designated as a historic overlay district, development concept and special overlay districts or other similar districts as set forth in the city's Unified Development Code and Code of Ordinances; d. Within an area that has undergrounding requirements as set forth in the city's Unified Development Code (UDC) and Code of Ordinances; e. Within three hundred (300) feet of a historic site or structure or historic landmark recognized by the city, state or federal government (see, for example, and not limited to V.T.C.A., Government Code § 442.001(3), and 16 U.S.C. 470), as of the date of the submission of the permit. (5) City's acceptance of the submitted design documents does not relieve network provider and its engineer of full responsibility and liability for any errors and/or omissions in the engineering analysis; (6) Network providers shall provide evidence of such permission to attach or use non-city-owned property and right-of-way. If the project lies within a highway, the applicant must provide evidence of an authorization from the state or federal government, as applicable. (b) Timeline. (1) The city will evaluate a network node or node support pole application for completeness within thirty (30) days of submission. The city will evaluate a transport facility application for completeness within ten (10) days of submission. (2) The city must approve or deny a complete application under this title in the following timeframes: a. An application for a node support pole not later than the one hundred fiftieth day after the date the municipality receives the complete application. b. An application for a network node not later than the sixtieth day after the date the municipality receives the complete application. c. An application for a transport facility not later than the twenty-first day after the date the municipality receives a complete application. d. An application for a permit for a node support pole, network node, or transport facility shall be deemed approved if the application is not approved or denied on or before the applicable date for approval or denial prescribed in this subsection. (3) A network provider that wants to install or collocate multiple network nodes inside the city is entitled to file a consolidated permit application for not more than thirty (30) network nodes and receive permits for the installation or collocation of those network nodes. (c) Application fee. (1) Five hundred dollars ($500.00) per application, up to five (5) network nodes per application; (2) Five hundred dollars ($500.00) per application for the first five (5) network nodes, then an additional two hundred fifty dollars ($250.00) for each additional network node per application; and (3) One thousand dollars ($1,000.00) per application for each pole.
(Ord. No. 031523, § 1, 8-28-2018)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.