§ 12-36-5 — Design regulations—Review procedure
Memphis Code of Ordinances (Supp. No. 33: codified through Ordinance No. 5959, enacted May 12, 2026) · Memphis Code of Ordinances § 12-36-5
Corpus is an independent public-information project, not the official City of Memphis website. Stable reference: corpuslaw.us/code/0b771af4-2aeb-437f-97da-f07dba1f875f
Sec. 12-36-5. - Design regulations—Review procedure.
The design review board shall implement the sign code for the central business improvement district set forth in this chapter as follows: A. Pre-design conference. Before an application for review can be submitted to the DRB, a pre-design conference must be scheduled with the CCC staff to help accelerate the approval process by acquainting applicants with design standards, submittal requirements and application procedures. B. Application. After the pre-design conference, an application for formal review and all information regarding the project must be submitted to the center city commission director of planning. The following materials must be submitted for all sign applications: 1. Photo(s) of the building(s) in question; 2. 13 copies of drawings that are to scale (not to exceed 11 inches by 17 inches in size) of the proposed sign(s) with size and dimensions. The drawings should show the front and side views of the sign and may require additional drawings if the proposal is not adequately illustrated in those drawings; 3. A description of letter style and size to be used on the sign; 4. A drawing or photo indicating where the sign(s) will be located on the building/site along with dimensions/measurements that are descriptive of the building or sign location; 5. A description of the type of sign, colors, installation/mounting and materials of the proposed sign, including any proposed lighting. The CCC staff shall have the right to waive the requirement that any of such material shall be submitted. C. Review of applications. At each monthly meeting of the design review board, the CCC staff will present all applications that have been received by the director of planning no later than two weeks prior to the meeting. All meetings of the design review board are open to the public. Applicants or their representative should attend the meeting to answer any questions the design review board may have regarding the application. After reviewing each case, the design review board shall vote on the proposal. D. Post-review. For approved applications, the CCC staff shall mail a letter stating the conditions of the approval to the applicant and to the city construction code enforcement division. For denied application, the CCC staff may make recommendations to the applicant about changes that could be made to the application to warrant approval. Amendments to the application shall be considered at a future meeting of the DRB. E. Appeal. Appeals must be made in writing to the chairperson of the center city commission within five business days of the date of the meeting at which the application was denied. Applicants may present the appeal at the regular CCC monthly board meeting. A representative of the design review board may be present and the CCC may outline the reasons for the denial. A final appeal may be made to the Memphis City Council after a decision has been issued by the center city commission.
(Code 1985, § 7-53(c); Ord. No. 4750, § 1, 3-7-2000)
Ask a question about Memphis law
Corpus searches the Memphis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
