For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 29.07 — APPLICATION FOR PERMIT, PLANS AND SPECIFICATIONS

Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 29.07

Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/0ec1251d-0731-41f6-b434-451bf97112a4

29.07 - APPLICATION FOR PERMIT, PLANS AND SPECIFICATIONS.

(1) No person shall erect or construct any building or structure whatever, or add to, enlarge, move, improve, alter, convert, extend or demolish any building or structure, or cause the same to be done, or commence any work covered by this code on any structure without first obtaining a building permit therefor from the Director of the Building Inspection Division; provided, however, that the Director of the Building Inspection Division may authorize minor improvements not involving structural alterations, change in use and which do not exceed a cost of five hundred dollars ($500) without requiring a building permit to be issued. Such permit shall be issued in the name of the owner. (2) Applications for building permits shall be filed with the Director of the Building Inspection Division in writing on a blank form to be furnished for that purpose. Such application shall describe the land upon which the proposed building or work is to be done, either by lot, block or tract, or similar general description which will readily identify and definitely locate the proposed building or work and shall show the use or occupancy of all parts of the building and such other pertinent information as may be required by the Director of the Building Inspection Division. The Director of the Building Inspection Division or any inspector of the Building Inspection Division of the Department of Planning and Community and Economic Development shall as a condition of the granting of a building permit, have the right to enter the premises for which said permit was issued, at any reasonable time during the course of the work and until final inspection and approval thereof has been given, for the purpose of inspecting said premises and its compliance as to construction or use with all statutory and ordinance regulations in reference to the construction, repair, use, and location of buildings. (3) Plans and specifications and a lot plan showing the location of the proposed building thereon and of every existing building thereon, shall accompany every application for a permit, and shall be filed in duplicate with the Director of the Building Inspection Division; provided, however, that the Director of the Building Inspection Division may authorize the issuance of a permit without plans or specifications for small or unimportant work. (a) Plans submitted shall be drawn to scale on substantial paper or prepared cloth, such scale to be not less than one-eighth (⅛) to one (1) foot. They shall be of sufficient clarity to indicate the nature and character of the work proposed and to show that the regulations which apply will be complied with. They shall be prepared in accordance with the provisions of this code, and shall bear the name of the architect, professional engineer or other person who prepared them. (b) Specifications shall be in detail. Any specifications in which general expressions are used to the effect that "work shall be done in accordance with the Building Code" or "to the satisfaction of the Director of the Building Inspection Division" shall be deemed imperfect and incomplete and every reference to the Building Code shall be to the section or subsection applicable to the material to be used or to the method of construction proposed. (4) The following data shall be a part of, or shall accompany, all plans submitted for approval: (a) The location of streets, alleys, lot lines and any other buildings on the same lot or property. (b) Name of owner. (c) Intended use or uses of all rooms. (d) Show floor area of each room. (e) Show window size for meeting the eight percent (8%) floor area requirements for light and ventilation. (f) Computations, stress diagrams and other data necessary to show the correctness of the plans, shall accompany the plans and specifications when required by the Director of the Building Inspection Division. (5) All persons applying for permits shall, at their initial application, provide the names and addresses of all subcontractors who will require supplemental permits over the course of the project. The Director of the Building Inspection Division shall mail the required supplemental permit to the subcontractor, who shall return the completed permit to the Director of the Building Inspection Division within seven (7) days of the postmark date of the supplemental permit. Failure to return the supplemental permit prior to commencing work shall be deemed to be working without a permit and shall be punishable in accordance with Sections 29.09(3) and 29.20 of these ordinances.

(Rpld. and Recreated by ORD-21-00024, 3-26-21)

Ask a question about Madison law

Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.