18.44.200 - Engineering controls for grading.

The requirement for grading permits may differ due to local conditions of land use, proposed site development, drainage patterns, topography, soil conditions and other items. The requirements in this section have been developed as an aid for operations covered by the grading ordinance. Engineering judgment, experience and competence shall be used to verify applicability of the requirements for the site. Any deviation from the requirements in this section shall be reviewed by and must receive the approval of the permit official. The permit official shall impose the following requirements as part of the issuance of the grading permit. A. Grading design requirements: 1. Shall maintain on-site balance of earthwork (within ten percent cut or fill) except where doing so would disturb existing natural drainage paths to be preserved. No materials shall be brought to or taken from the site, unless a borrow or waste permit is obtained. 2. Transporting of processed material from one site shall be allowed to a noncontiguous site when: a. Both sites are under the same ownership or the permittee has obtained written permission from the owner of such other site not belonging to the permit applicant and is provided with the permit application. b. The processed material is transported from a site with a grading/waste/borrow permit to a site with a grading/waste/borrow permit unless the other site is outside the city limits. c. The permit official approves the route for transporting processed material from one site to another, and the acceptable wheel-axle loads. 3. Sites shall be graded and maintained to prevent the erosion of soil and to prevent the accumulation of stagnant water thereon, or within any structure located on the site. 4. Construction, grading, or paving on any site shall not increase the damage potential to upstream, downstream, or adjacent properties or public right-of-way, property and/or facilities. 5. Shall include sediment basins that discharge into city streets or natural drainage paths. Desilting basins shall provide sufficient settlement time for setting of solids in the basin before discharging onto city streets and natural drainage paths. Hydraulic and soil type documentation shall be provided to demonstrate or establish that adequate sedimentation occurs before leaving the sediment basin. Sediment basins shall be designed in accordance with the Drainage Design Manual. 6. No grading operation shall excavate or fill so as to cause falling rocks, soil, or debris in any form to fall, slide, or flow onto adjoining properties. 7. Compaction requirements. a. The compaction requirements for load bearing fills upon which buildings, structures, streets, alleys or public facilities are to be located shall be determined by an engineer as part of the design for the fill and shall fully meet the requirements of the geotechnical investigation as approved by the permit official. b. Fills shall be placed and compacted to produce a structurally stabilized slope in accordance with the construction design standards and geotechnical investigation. 8. Slope design requirements. Excavations shall be constructed and/or protected so that they are stable and do not endanger life or property. The provisions of this chapter are not intended to prevent the use of any alternate method of slope design provided that the alternate is designed by an engineer as determined by the soils investigation report and the permit official finds that the alternate design is equivalent to that prescribed in this chapter. a. Embankments and slopes supporting occupied buildings, streets and roadways shall have a factor of safety of not less than 1.5. b. Slopes located above occupied buildings and whose toe is located within twenty feet or half of the embankment height from the exterior walls of any occupied building, whichever controls, shall have a factor of safety of not less than 1.5. c. All other slopes and embankments shall have a minimum factor of safety of 1.3. d. Drainage facilities shall be provided to protect slope faces from erosion. e. Construction of berms and swales on the brow or top of the slope shall provide protection from runoff. Erosion protection shall be provided for the berms that will encounter concentrated flows. Swale inverts may be required to be lined in accordance with flow velocities per the Drainage Design Manual. Swales shall be sloped (minimum one percent for pervious and 0.5 percent for impervious) to lined down drains in order to safely discharge flows. Adequate erosion protection shall be provided at all discharge locations. f. The slope of cut and fill surfaces shall not be steeper than 3 horizontal to 1 vertical. Permittee must also demonstrate that the slope will not become destabilized and not undergo excessive erosion (vegetation alone will not meet the stabilization requirements and additional measures will be necessary). Soil analysis describing engineering properties and suitability of the existing soils to support the proposed slope must be included in the geotechnical investigation. The permit official may require a flatter slope than 3 horizontal to 1 vertical (3H: 1V) if soils/geologic information submitted shows that flatter slopes are necessary for stability, stabilization measures effectiveness or maintenance. i. The slope of cut surfaces which are five feet in height or less and are in competent bedrock shall be no steeper than 2H: 1V. g. Areas adjacent to slopes shall not drain over onto the slope face if the off-site drainage width (measured in the direction of the slope) is greater than thirty feet. For areas greater than thirty feet, a swale or berm shall be provided to ensure the water does not erode the face of the slope in accordance with the GSP. i. Slopes having a ratio of 3 horizontal to 1 vertical or steeper shall not exceed twenty feet in vertical height, without a five feet horizontal bench being placed mid height of slope and at every twenty feet in vertical height thereafter (the bench shall have a cross slope away from the brow [the top] of the slope). The bench shall be constructed with a swale to collect stormwater. Swale inverts may be required to be lined in accordance with flow velocities per the Drainage Design Manual and to prevent percolation into the slope. Swales shall be sloped (minimum one percent) to lined down drains in order to safely discharge flows. Adequate erosion protection shall be provided at all discharge locations. ii. Cut slopes shall be blended into the existing terrain to produce a contoured transition from cut face to natural ground. h. No stormwater storage structure shall be at or adjacent to the top (brow) of a slope. Water harvesting at the top of slope will be considered and approved on a per project basis. i. Cut and fills shall be set back a minimum of five feet from walls, buildings or structures to allow sufficient access to the top of the slope for maintenance purposes and to assure the stability of the slope and the security of the foundations of the buildings and structures. j. Subsurface drainage facilities shall be provided where needed to intercept seepage that would affect slope stability, building and structure foundations or create undesirable wetness. k. Excavations shall not be made close to property lines as to endanger adjoining property without providing support and protection to prevent damage due to erosion, sliding, settlement or falling hazard. l. Fills. i. Fill materials shall be free of materials detrimental to the construction of stable fills as required by the geotechnical investigation. ii. Fills shall not be placed where they will slide or wash onto the property of others nor shall they be placed where they will cause encroachment upon natural drainage paths or other natural drainage ways without providing facilities to assure the capacity of the drainage way as approved by the permit official and in compliance with other state and federal guidelines. iii. Fills that toe out on natural slopes or grades steeper than three horizontal to one vertical shall not be made. iv. Fills placed above the top of an existing or proposed surface with a slope steeper than three horizontal to one vertical shall be set back from the top of the slope face at least five feet or as determined by the soils investigation report, unless slopes are stabilized to the top of slope face. v. Prior to placing fills on existing surfaces (condition before grading), all organic materials, vegetation, noncomplying fill, topsoil and other unsuitable materials shall be removed and the existing surface shall be scarified to a depth of six inches or as directed by the geotechnical investigation, whichever is greater. vi. Fill slopes shall not be constructed by pushing soil over the top of slope. vii. Fills used to support the foundations of any building or structure shall comply with the requirements of a geotechnical investigation. 9. Rainwater (precipitation) harvesting. Grading plans may be designed to encourage harvesting and use of rainwater within the project site, to reduce surface runoff discharged from project site. 10. Retaining walls. Retaining walls shall be engineered and shall be faced with stone or constructed with other earth colored material as approved by the permit official. If a series of retaining walls is required, the horizontal distance between walls shall be a minimum of four feet. Retaining walls in excess of four feet in height shall be constructed in accordance with the design prepared by an engineer. The design may require consultation with a geotechnical engineer, shall consider such factors as expansive soils, steep slopes and vehicles or structures near the walls and shall include the following: a. Construction plans indicating how the proposed wall height will vary along its length. b. Details with elevations showing top and bottom of wall for critical points along the wall length shall include a profile. c. Supporting calculations that demonstrate a factor of safety in accordance with the Chapter 18.08.240 for bearing capacity, overturning, sliding, and internal stability, including surcharge loads due to sloping backfill, adjacent vehicles and structures. 11. Pond grading requirements. Pond slopes shall be stabilized per the grading stabilization plan. Slope design requirements will be applicable to the side slopes of the ponds. 12. Any drainage improvements that are installed, as a result of land disturbance activities shall be designed to compliment and blend with the natural topography of the land. B. Preservation of existing natural drainage paths and terrain: Undeveloped areas in the City of El Paso contain significant natural terrain, drainage paths and vegetation. As a result, special design requirements are necessary to mitigate potential erosion hazards, minimize adverse ecological, physical and visual impacts and conserve natural scenic beauty so as to leave existing conditions undisturbed as much as practicable. 1. Natural drainage paths. The natural drainage paths as provided in the natural drainage path map shall be delineated in the grading plan. It is encouraged that the identified natural drainage paths remain in their natural state, including riparian vegetation, boulders and rock outcroppings. If the proposed grading is within the natural drainage paths, the following design requirements shall apply: a. Shall meet the requirements of the Drainage Design Manual. i. All modified existing natural drainage paths shall be designed to achieve a restored natural appearance. The natural appearance shall be achieved using grading and landscape techniques that replicate a natural drainage path by using natural or earth colored materials native to El Paso, vegetation, boulders and contouring. The design plans shall be in conjunction with the overall landscape theme for a natural drainage path by a landscape architect and be sealed by an engineer. These improvements shall be detailed in the grading plan and GSP. ii. An erosion/scour analysis must be completed and submitted to the permit official for approval. Water velocity shall be reduced to provide room for floodwater to spread safely and allow for native materials to be used for channel armoring. iii. A continuous trapezoidal and/or rectangular channel section shall be utilized only if no other hydraulic alternative is feasible. b. Disturbance for public access trails, roadway crossing and underground utilities required for the development shall be kept to a minimum and must be designed to meet the landscape requirements listed in the preceding section B.1.i. c. Fences, walls and similar structures shall not be constructed in the undisturbed or modified natural drainage paths. d. Where drainage structures enter natural drainage paths, the structure must be blended into the natural terrain and lined with natural or earth colored materials, revegetation or other alternative material as approved by the permit official. e. Natural drainage path fencing is required for all channels with slopes higher than four feet high and slopes steeper than three feet horizontal and one foot vertical shall have fencing of two feet high along the abutting street and four feet high along residential land uses. Fencing shall be masonry, wrought iron, rock, concrete, or combination thereof. f. Provide a maintenance access route to be determined based on site conditions and to be approved by the permit official. The access route may be a public street when immediately adjacent to the natural drainage path. g. Existing natural vegetation on the property shall be retained in its natural state, except where necessary for the construction or to replace or improve undesirable vegetation. Areas to remain undisturbed shall be fenced off prior to the use of any heavy machinery on site and shall remain fenced during the entire construction process. Fencing material may include plastic fence or other similar materials. To protect the root zone of said vegetation, fencing shall be placed five feet to the outside of the dripline of such vegetation and shall be a minimum of three feet in height. h. Revegetation shall be required on all disturbed areas. For purposes of this requirement, appearance shall conform to the overall landscape architect design. The existing top soil (twelve inches) shall be stockpiled and reused in areas where revegetation will occur. 2. Natural terrain. Where grading is proposed on any parcel having an average natural slope of ten percent or greater, grading shall be limited to the minimal amount possible under standard engineering practices. Special requirements shall be considered by the engineer including the intensity of land disturbance and natural characteristics of the terrain, such as steepness of slope, vegetation, landforms, soil type and rock stability. a. The overall shape, height or grade of any cut or fill slopes shall be developed utilizing contour grading in concert with existing natural contours and the scale of the natural terrain of the site with seamless blending to the natural terrain at the edges of the disturbance. b. Where two cut or fill slopes intersect and/or intersect the natural grade, the intersection shall be horizontally and vertically contoured and blended to match existing terrain. c. The area of a site proposed to be graded shall be that which fits into the natural terrain and which allows for a minimal amount of grading. The ungraded area must be left in its natural form for the remainder of the site and native vegetation shall not be removed. C. Construction activity requirements. The following operational guidelines must be followed during the grading of the site. They are required to be included as "general notes" on the approved grading plan. 1. No on-site processing of material for commercial or retail sales shall be allowed. On-site processing of materials to be used for preparation or construction of improvements within the site covered by the grading permit shall be allowed. 2. Work shall be conducted in a manner that preserves and does not obstruct, impede or interfere with the flow of stormwater in natural drainage ways, unimproved channels or watercourses, or improved ditches, channels or canals in such a manner as to cause flooding where it would not otherwise occur. 3. Construction equipment and fencing shall be kept out of watercourses except when necessary to perform work on the approved plans. Adequate by-bass measures shall be installed where temporary drainage blockages will occur. Where work within a channel is designated on approved plans, precautions shall be taken to stabilize the work area during construction to minimize erosion as shown on the plans. The channel, including bed and banks, shall always be restored/restabilized immediately after work in the channel is completed; 4. Where a drainage way will be crossed by construction vehicles regularly during construction, a temporary crossing shall be constructed as required in the approved grading plans. 5. Material stockpiling shall not be allowed when grading operations are idle for more than seven consecutive calendar days. Stockpiling shall be limited to ten feet high when grading operations are being conducted. 6. A traffic control permit shall be required if the grading operation will impact traffic. 7. Any use of vibratory equipment shall not be allowed, unless approved in writing by the permit official in advance of such use. 8. The permit official must be notified no later than 4:00 pm the day in advance of any grading work. Additional activity requirements/restrictions may be specified by the design engineer of record. D. Grading stabilization plan design requirements: The applicant shall meet the following requirements in developing the GSP for the stabilization of the site/slopes after the grading operation is complete (post construction) or if the site becomes idle for more than one hundred eighty consecutive calendar days. These requirements are in addition to meeting the requirements of Chapter 15 which govern construction activities and erosion control BMPs. The requirements for soil erosion control measures depend largely upon the extent of the destructive and nuisance potentials due to erosion that may develop from the work to be performed. Thus, the need for erosion control measures is largely determined by prevailing winds, drainage patterns, soils characteristics, residences, businesses, thoroughfares and other facilities. Analysis must be completed to verify and account for drainage patterns, soil characteristics and proximity to downstream development where erosion may occur and/or may cause hazards or damage to public or private property. The following are design guidelines for completing and complying with the GSP. 1. The GSP shall be prepared and designed to meet the following goals: a. Development plans for any project site shall be as effectively fitted to existing topography and soils as practical so as to create the least erosion potential possible. b. Sediment caused by excessive erosion shall be removed from runoff water before leaving the site. c. All disturbed areas, sites and slopes shall be stabilized through the implementation of a stabilization measure to prevent excessive erosion by wind or water. d. Ensure that the stabilization measures are implemented properly and maintenance activities, both short and long term, are specified to ensure effectiveness of the stabilization measures. e. Cut and fill slopes shall be stabilized through the implementation of a stabilization measure and surface water damage to cut and fill slopes shall be prevented. 2. Implementation of the GSP shall be applied to disturbed areas and soil stockpiles after the grading operation is complete or at such time the land becomes idle for more than one hundred eighty consecutive calendar days. 3. Scheduling requirements — The maintenance activities shall continue for the warranty period. a. At any one time in the development of the site, the smallest practical project area should be physically disturbed. Final structures, paving, facilities and effective drainage control measures shall be completed in each project area as soon as possible. b. Project areas physically disturbed during development shall be exposed to erosion producing influences for the shortest period of time practicable. c. Critical areas such as slopes of three (horizontal) to one (vertical) or steeper and drainage ways shall be stabilized immediately after the completion of the grading. d. Permanent storm drainage facilities, paving and other related facilities shall be constructed as soon as practicable to reduce water erosion problems. e. The GSP must include a description of site work schedule and sequencing, specifically stating whether any portion of the land will remain graded and idle for more than one hundred eighty consecutive calendar days. 4. Erosion control—Waterways. Disturbed areas and slopes must be stabilized using one or more of the following stabilization measures. Stabilization measures are detailed in the design standards for construction: a. Velocity dissipation devices. b. Slope drains. c. Streambank stabilization. d. Earth dikes and drainage swales. e. Sediment basin. f. Check dams. g. Others as proposed by the applicant and approved by the permit official. 5. Erosion control—Disturbed areas. Disturbed areas and slopes must be stabilized using one or more of the following stabilization measures. Stabilization measures are detailed in the design standards for construction. a. Wind erosion - After completion of site grading the project area shall be watered as required to control wind erosion. b. Palliative soil stabilizers (e.g. polyacrylamide, guar-based compounds, polyvinyl acetate, liquid polymers). Detail information for polymers shall include the type of palliative, mix ratio and application rate specific to the soil type, climatic conditions, and stabilization design life. Oil-based palliatives are not allowed. c. Seeding methods such as hydro seeding, drilling, seeding and raking in, or other seeding method to provide long-term erosion control. Existing top soil shall be stockpiled and reused; soil roughening shall be implemented before seeding. Seed mixtures shall be provided with the GSP. Mixtures shall utilize native and adapted grasses that require no irrigation after the establishment period. Seeding alone is not erosion control until vegetation is established. Seeding shall be combined with applicable erosion control structural stabilization measure until vegetation is established. d. Bonded fiber matrix. Detail information provided for bonded fiber matrix shall include the type of binder, mix ratio and application rate specific to the soil type, climatic conditions, and stabilization design life. e. Crimped straw mulch - Use of mulch shall be limited to providing erosion control for six months or less, except when applied with a binding agent or netting to secure the mulch. f. Geotextiles and mats. g. Wood mulching. h. Revegetation/landscaping - Revegetation shall include a weed-free seed mixture or live transplanted plants. Existing topsoil shall be stockpiled and reused in the revegetation areas. i. Rock cover. j. Others as proposed by the applicant and approved by the permit official. 6. Each stabilization measure shall be detailed on the plan. The GSP shall include the period of time for which the stabilization measure is intended to be effective and design details to document its ability to perform for that time period. The plan shall list all required maintenance activities and frequency of maintenance. The maintenance requirements must continue for the warranty period to ensure that graded sites are stabilized. Where specified as part of the stabilization measure, temporary irrigation shall be maintained for the time required to ensure vegetation survival. a. Site monitoring shall be performed by the permittee responsible for the GSP. The city may also monitor the site compliance at any time and require access to the updated site GSP and records of all inspections made. b. All stabilization measures identified in the GSP shall continue to be maintained. The permittee shall remain in charge of the site during the warranty period. c. The city shall be notified in writing by the permittee/owner that a portion of the construction site is or will become idle. The permittee responsible for the GSP shall inspect the construction site to verify that the site is adequately protected. The city may conduct an inspection of the site. d. Additional protection measures may be required by the permit official. Any construction site found idle for more than one hundred eighty consecutive calendar days without the installation of appropriate protection measures and notification that the construction project is idle shall be considered in violation of this chapter. e. A monitoring and inspection program shall be implemented until a stabilized site is achieved or building resumes. Inactive/idle sites shall be inspected and maintained on one of the following schedules: i. At least once every fourteen calendar days and within twenty-four hours following a wind event (as determined by the permit official) and/or rainstorm event of 0.5 inches or greater; or ii. At least once every seven calendar days, on a specifically defined day each week, regardless of whether there has been a rainstorm event since the last inspection. 7. The GSP shall be updated in accordance with the actual construction sequence, and the stabilization measures are implemented according to actual construction progress.

(Ord. No. 17516, § 1, 3-29-2011)