§ 9-8-3 — STREET AND UTILITY IMPROVEMENT REQUIREMENTS
Mesa City Code (Supp. No. 22: codified through Ordinance No. 5996, adopted March 9, 2026) · Mesa City Code § 9-8-3
Corpus is an independent public-information project, not the official City of Mesa website. Stable reference: corpuslaw.us/code/0f2dd225-e783-48b7-8b1a-534ac29ae2ae
9-8-3: - STREET AND UTILITY IMPROVEMENT REQUIREMENTS
(A) Purpose. It is the purpose of this Section to establish in outline the minimum acceptable standards for improvement of public streets and utilities, and dedication of rights-of-way where required, to define the responsibility of the developer in the planning, constructing, and financing of public improvements and to establish procedures for review and approval of engineering plans. (1095, 3105, 4570) All improvements required in streets, alleys, or easements which are required as a condition of site plan approval shall be the responsibility of the developer. (1095) The City Engineer is authorized to develop and apply such engineering standards, specifications, and procedures for the design and construction of improvements as are consistent with the objectives of this section and necessary or appropriate to protect the public health, safety, and welfare. (4570) (B) Applicability. The standards and requirements of this Section shall apply to all commercial, industrial, and multiple-residential developments, and single residential developments where no subdivision of land is required, as follows: (3105, 4570) 1. Any new construction on undeveloped or vacant parcels; or (3105) 2. Total removal and reconstruction of existing buildings and structures; or (3105) 3. A one hundred percent (100%) or more increase in the total aggregate area of existing building and structures. (3105, 4570) 4. Buildings and structures existing at the time of annexation by the City. (4834) (C) Responsibility for Improvements — New Development. All requirements required under Section 9-8-3(B)1 shall be the responsibility of the developer. (4570) (D) Responsibility for Improvements — Existing Development. The requirements of Section 9-8-3(B)2 and 3 apply to parcels and shall be the responsibility of the developer as follows: 1. For parcels that have not previously provided R-O-W improvements in accordance with the standards at the time of development or annexation, or paid in-lieu fees for such improvements, the developer is responsible for all improvements. (4570, 4834) 2. For parcels fronting on other than arterial streets, that have previously provided R-O-W improvements in accordance with the standards at the time of development or annexation, or paid in-lieu fees for such improvements, the developer is not responsible for additional improvement requirements. (4570, 4834) 3. For parcels fronting on arterial streets, that have previously provided R-O-W improvements in accordance with the standards at the time of development or annexation, or paid in-lieu fees for such improvements, the developer is not responsible for arterial street widening improvements when such improvements are not identified on the City's currently adopted Transportation Plan. (4570, 4834) 4. For parcels fronting on arterial streets, that have previously provided R-O-W improvements in accordance with the standards at the time of development or annexation, or paid in-lieu fees for such improvements, the developer is responsible for fifty percent (50%) of the costs of the arterial street widening requirements calculated in accordance with City policy as approved by the City Engineer when such street widening improvements are identified on the City's currently adopted Transportation Plan but are not a part of the City's five (5) year Capital Improvement Plan. (4570, 4834) 5. For parcels fronting arterial streets, that have previously provided R-O-W improvements in accordance with the standards at the time of development or annexation, or paid in-lieu fees for such improvements, the developer is responsible for all of the costs of the arterial street widening requirements calculated in accordance with City policy as approved by the City Engineer when such street widening improvements are identified on the City's currently adopted Transportation Plan and are a part of the City's five (5) year Capital Improvement Plan. (4570, 4834) The developer's responsibility for right-of-way improvements as determined in this section may be fulfilled by constructing the required right-of-way improvements in accordance with all City requirements and standards or by paying an in-lieu payment in accordance with Section 9-8-4(C), as approved by the City Engineer. (4570) (E) Engineering Plans. (1095, 3105, 4570) 1. It shall be the responsibility of the developer to have prepared by a civil engineer, registered in the State of Arizona, a complete set of engineering plans, satisfactory to the City Engineer, for construction of required improvements. Such plans shall be prepared and submitted to the City of Mesa Building Safety Director together with the on-site construction plans. (1095, 4570) 2. Engineering plans shall be approved by the City Engineer prior to the issuance of a building permit by the City Building Safety Director. (1095, 4570) (F) Dedication of Rights-of-Way. The dedication of rights-of-way in accordance with Section 9-6-2 and the table contained in this Section shall be made prior to the issuance of a building permit, or rights-of-way permit, or pursuant to the recording of a subdivision plat or land split document. (1095, 3105, 4570) RIGHTS-OF-WAY DEDICATION TABLE Street Classification | Local | Collector | Major Collector | Local Industrial | Arterial R/W Dedication | 50' Full Street | 80' Full Street | 110' Full Street | 80' Full Street | *130' Full Street 25' Half Street | 40' Half Street | 55' Half Street | 40' Half Street | *65' Half Street * Footnote: Additional right-of-way width required at arterial-to-arterial intersections. See Section 11-13-2 (J). Refer to Sections 9-8-4 and 9-8-5 for modifications and appeals to these requirements. (G) Construction and Inspection. (1095, 3105, 4570) 1. All improvements in the public right-of-way shall be constructed under the inspection and approval of the City Engineer. Construction shall not be commenced until a permit has been issued for such construction, and if work has been discontinued for any reason, it shall not be restarted prior to notifying the City Engineer. (1095, 4570) 2. All underground utilities to be installed in streets and alleys shall be constructed prior to the surfacing of such streets and alleys. Service stubs for underground utilities shall be placed in such length and size as not to necessitate disturbance of street improvements when service connections are made. (1095) (H) Required Right-of-Way Improvements. (1095, 3105, 4570, 5395) 1. Streets. All streets contiguous to the developing land shall be paved and concrete curbs and gutters installed to lines, grades, and dimensions approved by the City Engineer and in conformance with City standards. The streets shall be improved to the centerline thereof. When improvement of a major collector or arterial street is required, the City will pay for such extra width paving as may be deemed appropriate by the City. (1095) 2. Alleys. All alleys adjacent to the developing land shall be surfaced with granite or ABC to grades and dimensions approved by the City Engineer and in conformance with City standards, except that alleys to be used for primary vehicular access as defined under Section 9-5-1 of the City Code shall be improved as required by Section 9-5-1 of the City Code. Alleys to be used for delivery of goods and materials to commercial and industrial buildings shall be considered to be used for primary vehicular access. (1095) 3. Sidewalks. Concrete sidewalks shall be constructed along the entire length of the street adjacent to the land under development to a width and to lines and grades approved by the City Engineer and in conformance with City standards. (1095) 4. Water and Sewer Lines. Water and sewer lines shall be installed in all streets adjacent to the land under development to lines and grades and of such sizes as approved by the City Engineer and in conformance with City standards. Water and sewer service lines of sizes and at locations approved by the City Engineer and in conformance with City standards shall be installed prior to paving the streets and improving the alleys. Where it is necessary to extend a water or sewer main from an existing main of adequate size to the development, the developer will be required to pay the full cost of the line extension. If requested, the City may participate in the oversize improvement cost in a "City-share" agreement where applicable, and may also enter into a private line agreement with the developer to provide for equitable and proportionate recovery of the actual extension costs in excess of any City-share and those costs attributable to the developer's property. If the City enters into a private line agreement, subsequent developers must pay a proportionate and equitable share of the cost, by frontage or acreage, of the line extension at such time as they develop benefitted property, whether or not the benefitted property takes service from the line extension. The City is authorized to adopt policies, procedures, and methods for City-share and cost share, and all City-share and private line agreements shall be subject to compliance therewith. 5. Fire Hydrants. Fire hydrants shall be installed along adjacent streets at locations and to lines and grades approved by the City Engineer and in conformance with City standards. (1095) 6. Irrigation Lines and Ditches. All S.R.P. and R.W.C.D. irrigation ditches located in the streets, alleys, or public easements adjacent to the land being developed shall be piped or abandoned in accordance with plans and specifications prepared by the respective irrigation district and as approved by the City Engineer. All private irrigation ditches in the streets, alleys, or public easements adjacent to the land being developed shall be piped or abandoned to lines and grades as approved by the City Engineer and in conformance with City standards. (1095, 4570) 7. Storm Drainage. (1095, 1896) (a) The developer shall make provisions to retain within the boundaries of his development the runoff generated by development of the site in accordance with plans approved by the City Engineer and in conformance with City standards. The plans shall show the method, location, and capacity of retention to be provided. The plans shall also show the runoff calculations, surface, grades, and methods of draining the retention facility. A one hundred- (100-) year, two- (2-) hour storm will be used as a minimum basis for the design of drainage facilities. (1095, 1896, 2776) (b) In lieu of retaining runoff within the boundaries of the development, a common retention facility may be established for two (2) or more developments. This shall be done in accordance with plans approved by the City Engineer and in conformance with City standards. (1095, 1896) (c) Retention facilities shall be of the type and size approved by the City Engineer. (Multiple, small retention areas shall not normally be acceptable.) (1896) (d) At the time of completion of development, the developer's engineer shall provide as-built certification to the City Engineer that the drainage and retention facilities were constructed in accordance with the approved plans and conform to City standards. Said certification shall be signed by the engineer and stamped with his professional seal. (1896) (e) Once constructed and approved by the City, the drainage and retention facilities may not be modified unless modification is approved by the City Engineer. (1896) 8. Streetlights. Streetlights shall be installed in accordance with Section 9-6-4(D)10. of City Code and per City Engineering and Design Standards. (1095, 1647, 1772, 3766) 9. Traffic Control Devices. Traffic control devices shall be provided or existing control devices shall be modified in conjunction with the development in accordance with designs approved by the Development Services Department, where required in accordance with the Mesa Transportation Division. The Transportation Division may defer the installation of required traffic control devices. (4570) When the installation of required traffic control devices is deferred, the owner/developer shall pay the City a payment in-lieu of causing the actual design, installation, and/or construction of the devices. This in-lieu payment shall be based upon a cost estimate prepared by a professionally registered civil engineer and approved by the City of Mesa. The in-lieu payment cost estimate shall include all design costs, labor and materials costs, plus twenty percent (20%) for future contingency costs. All in-lieu payments shall be remitted to the City of Mesa as a condition of and in conjunction with the issuance of any on-site construction permits and/or off-site rights-of-way permits associated with the development project. (4570) 10. Street Name Signs. Street name signs shall be placed in all street intersections. The developer shall install signposts and signs per Mesa Standard Details with designs approved by the City Traffic Engineer. (1095, 4570, 5395) 11. Survey Monuments. Survey monuments conforming to City standards shall be installed at all corners, angle-points, points of curves, and at all street intersections adjacent to the land under development and at such other locations as may be required by the City Engineer. After all improvements have been installed, a registered land surveyor or registered civil engineer shall check the locations of the monuments and mark the brass cap. (1095, 4570, 5395) (I) Oversize of Required Public Improvements. The developer may be required to oversize certain public street and utility improvements for the purpose of ensuring that the City of Mesa's public improvement standards for transportation, utility service, and infrastructure are maintained. The City of Mesa may participate in the increased costs of oversize improvements when approved by the Development Services Manager. The City's commitment to participate in these increased costs may be formalized in a development agreement limited to those improvements specifically identified as oversize and executed by the developer and the Development Services Manager. (2907, 3105, 3766, 4570)
(Ord. No. 5538, § 12, 12-2-19; Ord. No. 5826, § 2, 12-4-23)
Ask a question about Mesa law
Corpus searches the Mesa sections it holds and shows the ones that match, with their citations. Free, no sign-in.