§142.0146 Erosion, Sedimentation, and Water Pollution Control
(a) All grading work shall incorporate erosion and siltation control measures in accordance with Chapter 14, Article 2, Division 4 (Landscape Regulations) and the standards established in the Land Development Manual.
(b) All development shall be conducted to prevent erosion and stop sediment and pollutants from leaving the work site. The property owner is responsible to implement and maintain temporary and permanent erosion, sedimentation, and water pollution control measures to the satisfaction of the City Manager, whether or not such measures are a part of approved plans. The property owner shall install, monitor, maintain, and revise these measures, as appropriate, to ensure their effectiveness. Controls shall include measures outlined in Chapter 14, Article 2, Division 2 Storm Water Runoff Control and Drainage Regulations) that address the development’s potential erosion and sedimentation impacts.
(c) Grading of properties within the Coastal Overlay Zone that drain into Los Penasquitos Lagoon or San Dieguito Lagoon shall comply with the Erosion Control Measures for North City Areas Draining to Los Penasquitos or San Dieguito Lagoons, on file in the office of the City Clerk as Document No. OO-17068.
(Retitled from “Erosion and Siltation Control” and amended 9-10-2001 by O-18976 N.S.; effective 10-10-2001 outside the Coastal Overlay Zone; effective 11-16-2001 within the Coastal Overlay Zone.)