For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Positive Train Control Systems

49 C.F.R. Part 236, Subpart I
in effect

49 C.F.R. § 236.1001 Purpose and scope.

49 C.F.R. § 236.1003 Definitions.

49 C.F.R. § 236.1005 Requirements for Positive Train Control systems.

49 C.F.R. § 236.1006 Equipping locomotives operating in PTC territory.

49 C.F.R. § 236.1007 Additional requirements for high-speed service.

49 C.F.R. § 236.1009 Procedural requirements.

49 C.F.R. § 236.1011 PTC Implementation Plan content requirements.

49 C.F.R. § 236.1013 PTC Development Plan and Notice of Product Intent content requirements and Type Approval.

49 C.F.R. § 236.1015 PTC Safety Plan content requirements and PTC System Certification.

49 C.F.R. § 236.1017 Independent third party Verification and Validation.

49 C.F.R. § 236.1019 Main line track exceptions.

49 C.F.R. § 236.1021 Discontinuances, material modifications, and amendments.

49 C.F.R. § 236.1023 Errors and malfunctions.

49 C.F.R. § 236.1027 PTC system exclusions.

49 C.F.R. § 236.1029 PTC system use and failures.

49 C.F.R. § 236.1031 Previously approved PTC systems.

49 C.F.R. § 236.1033 Communications and security requirements.

49 C.F.R. § 236.1035 Field testing requirements.

49 C.F.R. § 236.1037 Records retention.

49 C.F.R. § 236.1039 Operations and Maintenance Manual.

49 C.F.R. § 236.1041 Training and qualification program, general.

49 C.F.R. § 236.1043 Task analysis and basic requirements.

49 C.F.R. § 236.1045 Training specific to office control personnel.

49 C.F.R. § 236.1047 Training specific to locomotive engineers and other operating personnel.

49 C.F.R. § 236.1049 Training specific to roadway workers.