Sec. 10-541. General Performance Criteria for Stormwater Management
Unless judged by the City of Tyler to be exempt or granted a waiver, the following performance criteria shall be addressed for stormwater management at all sites: a. Site designs should establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. b. All stormwater runoff generated from new development shall be treated to the maximum extent practicable by minimum best management practices (BMPs) before discharging directly into a jurisdictional wetland or local water body. Where such discharges are proposed, the impact of the proposal on wetland functional values shall be assessed using a method acceptable to the City of Tyler. In no case shall the impact on functional values be any less than allowed by the Army Corp of Engineers (ACE) or the appropriate State Agency responsible for natural resources. c. Groundwater recharge shall be encouraged, by promoting infiltration through the use of structural and non-structural methods. d. To protect stream channels from degradation, a specific channel protection criteria shall be provided as prescribed in the current stormwater design manual. e. Stormwater discharges to critical areas with sensitive resources (i.e., cold water fisheries, swimming beaches, recharge areas, water supply reservoirs) may be subject to additional performance criteria, or may need to utilize or restrict certain stormwater management practices. f. Certain industrial sites, as defined in the Texas Pollutant Discharge Elimination System (TPDES) general permit, are required to prepare and implement a stormwater pollution prevention plan, and shall file a notice of intent (NOI) under the provisions of the TPDES general permit. The stormwater pollution prevention plan requirement applies to both existing and new industrial sites. g. Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as “hotspots”, may require the use of specific structural STPs and pollution prevention practices. h. Prior to design, applicants are required to consult with the City of Tyler to determine if they are subject to additional stormwater design requirements. i. The calculations for determining peak flows as found in the Subdivision Design Guidelines shall be used for sizing all stormwater management practices. (Ord. No. 0-2011-45; 6/8/2011)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.