Reconstruction of public sanitary sewers.
Tulsa Revised Ordinances tit. 11-C, § 520
in effectSection 520. - Reconstruction of public sanitary sewers.
No building, structure, wall or other above-ground obstruction, including additional fill material, shall be placed, erected, installed or permitted directly over any public sanitary sewer. In the event any such obstructions are to occupy the ground immediately above a public sanitary sewer, it shall be necessary to first re-route the public sanitary sewer at the property owner's expense in order to comply with this provision; provided, however, that if there is not sufficient grade available to perform the re-routing, the property owner shall present a proposed plan to the Director for his approval, setting forth the necessary construction to safeguard the public sanitary sewer. Either the re-routing of the sanitary sewer or the reconstruction, as approved by the Director, shall be carried out through proper contracts and bonds with the City of Tulsa.
Source: City of Tulsa, Revised Ordinances and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/ok/tulsa/codes/code_of_ordinances?nodeId=COOR_TIT11-CWASE_CH5REUSSASESY_S520REPUSASEFetched: 10/28/2026
