For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.566.200 — PIR Master Plan

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.566.200

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/1209eb52-7b22-476e-a1e5-08083f53985c

33.566.200 PIR Master Plan

A. Purpose. This section describes the required elements for a PIR Master Plan, and the procedures and criteria for approving and amending such a plan. The development of a PIR Master Plan will provide the surrounding neighborhoods and the City with information about, and an opportunity to participate in, plans for the future development of the site. An approved PIR Master Plan will ensure that the site can develop in a manner consistent with the purpose and character of this plan district. B. Components of a PIR Master Plan. The applicant must submit a PIR Master Plan with all of the following components: 1. Boundaries of the property. The boundaries of the property to be included in the PIR Master Plan. 2. Overall scheme. An overall scheme, which includes both written and graphic elements, that describes and ties together existing, proposed, and possible development plans, each phase of development, estimated timelines, interim uses of property awaiting development, review procedures for each phase, and what standards, guidelines, and approval criteria will be used to evaluate each phase. 3. Site plan. A site plan, showing the location, size and dimensions of existing and proposed buildings and other structures, the pedestrian, bicycle, and vehicle circulation system, vehicle and bicycle parking areas, and open areas. This information must cover the following: a. Existing development and improvements, including those that will be removed and those that will remain after development of any proposed new facilities; b. Proposed development and improvements; c. Conceptual plans for possible future development and improvements; d. Existing and proposed pedestrian, bicycle, and transit facilities including pedestrian and bicycle circulation between: (1) Major buildings, activity areas, and transit stops within the boundaries and adjacent streets and adjacent transit stops; and (2) Development adjacent to the plan district and the proposed development; e. Infrastructure improvements. Schematic drawings showing proposed infrastructure improvements, including facilities for water, sewer, stormwater management, and electrical facilities; f. Existing and proposed drainage patterns; g. Existing and proposed wetlands and water features; A grading and erosion control plan; h. i. Location of swales or created wetlands to treat runoff from the racetrack, parking lots, and other impervious surfaces;. j. Location and description of wildlife habitat areas; k. Landscaping. A conceptual landscape plan, including proposed tree plantings, fencing, screening and other existing and proposed landscape features; and l. Any proposed temporary uses or locations of uses during construction periods. 4. Environmental requirements. Environmental requirements must be met as part of the review of the PIR Master Plan. The PIR Master Plan must include information as to how the proposed and possible development will meet the requirements of Chapter 33.430, Environmental Overlay Zones, and the requirements of the Natural Resources Management Plan for Peninsula Drainage District No. 1; 5. Operations. a. A description of the existing, proposed, and possible uses and activities in the plan district; b. Expected hours of operation of each activity or use existing or proposed in the plan district; c. Expected number of employees; d. Information on how operations will limit wildlife disturbance year-round, with extra limits during breeding season (mid-February to the end of May); and e. Information on on-going activities in the plan district, including maintenance and repair of facilities. 6. Development standards. Any proposed standards that will control development in the plan district, where those standards are in addition to or instead of development standards in other chapters of the Zoning Code. Standards that are less restrictive than those of the Zoning Code require adjustments. 7. Design standards or guidelines that will be used to evaluate development in the plan district. 8. Subdistricts. A description and a map showing the boundaries of subdistricts within the plan district. 9. An integrated sign program that addresses both temporary and permanent signs, including the size, number, visibility from outside the plan district, visibility from natural areas within the plan district, and, for temporary signs and banners, the length of time they will be used and a method for tracking these time periods. 10. Transportation. a. Information on impacts. Information on the projected transportation impacts of the existing and proposed activities and improvements. These include the expected number of trips (peak and daily), an analysis of the impact of those trips on the adjacent street system, and an analysis of the impact of those trips on the surrounding neighborhoods; b. A Traffic Management Plan, including mitigation measures. The Traffic Management Plan should be designed to meet the approval criteria in Section 33.566.220, Approval Criteria for a PIR Master Plan. Mitigation measures may include specific programs to reduce traffic impacts such as encouraging the use of public transit, carpools, vanpools, shuttle buses, and other alternatives to single occupancy vehicles or improvements to the street system; and c. Information on how the PIR Master Plan complies with the Transportation Element of the Portland Comprehensive Plan. C. Review Procedure and Notice. Review procedure. A PIR Master Plan is processed through a Type III procedure. 1. 2. Additional Notice. In addition to other notification required for the Type III procedure, notice must be sent to all recognized organizations within one mile of the plan district boundaries. D. Amendments to the PIR Master Plan 1. Amendment required. An amendment to the PIR Master Plan is required for the following, unless it is allowed by the PIR Master Plan: a. Changes in operation that will increase frequency of events; b. Changes in operation or use that will increase the amount of traffic coming to the site; c. Increases in floor area of any use or structure, or the overall floor area on the site; d. Increases or decreases in the amount of parking; e. Proposed changes to the PIR Master Plan boundaries; f. Changes to the uses allowed in the plan district, or any change to the text of the PIR Master Plan; and g. Proposed development, operations, or activities which were reviewed, but were denied because they were found not to be in conformance with the PIR Master Plan. 2. Review procedures. The review procedures specified in this Paragraph apply to amendments to the PIR Master Plan, unless the PIR Master Plan specifies another review procedure. a. Changes D.1.a through D.1.d. (1) Changes of more than 10 percent to the elements listed in D.1.a through D.1.d are reviewed through a Type III procedure; (2) Changes of 10 percent or less to the elements listed in D.1.a through D.1.d are reviewed through a Type II procedure; b. Changes D.1.e through D.1.g. The changes listed in D.1.e through D.1.g are reviewed through a Type III procedure. c. Additional notice. In addition to other notification required for the Type II and III procedures, notice must be sent to all recognized organizations within one mile of the plan district boundaries. 3. Approval criteria. The approval criteria for an amendment to the PIR Master Plan are the same as the approval criteria for the adoption of a new PIR Master Plan.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.