Sec. 7-72. - Same—Amendments.
The code adopted by this article is amended as follows:
Section 1302, Building Sewer, is amended to add a new subsection 1302.6 to read as follows:
"a. No person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer, building sewer or appurtenance thereof, or use a power machine for cleaning, rodding, rooting or unclogging a building sewer without first obtaining a written permit from the building official.
"b. There shall be two (2) classes of sewer permits:
(1) For connecting building sewers to sewer mains; and
(2) For maintenance or repair of a building sewer requiring a connection with or opening into or alteration of the sewer line or the use of a power machine for cleaning, rodding, rooting or unclogging a building sewer.
In either case, the owner or his agent shall make application on a special form furnished by the city. Permits under (a) above will be issued and charges made as provided under section 7-74 of the Code of Ordinances of the City of Meridian, Mississippi.
"c. All costs and expenses incident to the installation, connection, maintenance and repair of the building sewer shall be borne by the owner. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation and maintenance of the building sewer.
"d. Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the building official, to meet all requirements of this article. A permit as set out under paragraph (b) above shall be obtained for connecting new buildings to existing building sewers.
"e. The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Society for Testing and Materials (ASTM) and the Water Pollution Control Federation (WPCF) Manual of Practice No. 9 shall apply. The building sewer shall be Clay Sewer Pipe, ASTM C-700 with ASTM C-425 Couplings or PVC pipe, ASTM D-3034 (SDR 35) or cast iron soil pipe with preformed neoprene joints, ANSI 112.5.1 or ductile iron pipe, ANSI A21.51, with rubber gasket or mechanical joints, ANSI A21.10 or 11.
"f. Connections of building sewer to sewer main shall be made within existing wyes or tees, or in the absence of a wye or tee, with a machine tap and tapping saddle of a design approved by the building official, or by cutting a section from the sewer main, inserting a wye or tee of material similar to the mains, and connecting to sewer main with full circle clamp couplings of a design approved by the building official. All connections in the sewer main and in the building sewer shall be made airtight and watertight.
"g. Where an opening is made into a building sewer for maintenance or repair, the opening shall be repaired by cutting a section from the building sewer, inserting a section of sewer pipe of approved material for building sewers, and connecting to existing building sewer with full circle clamp couplings of a design approved by the building official, or by inserting a cleanout connected with full circle clamp couplings as above. All connections in the building sewer shall be made airtight and watertight.
"h. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of surface run-off or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer.
"i. The connection of the building sewer into the public sewer or repairs and alterations to building sewers shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. All such connections shall be made airtight and watertight. Any deviation from the prescribed procedures and materials must be approved by the building official before installation.
"j. The applicant for the building sewer connection and maintenance repair permits shall notify the building official when the work is ready for inspection. The connection to the public sewer shall be made under the supervision of the building official or his representative. Work shall be tested for airtightness where practical.
"k. All excavations for building sewer installations and maintenance or repair shall be adequately guarded with barricades and lights so as to prevent the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city."
(Code 1962, § 8-21; Ord. No. 3619, § 1, 9-16-81)