2:22b. - Water capital recovery charges, meter charges, and service stub installation charges due at time of connection.

A property newly connecting directly or indirectly to the city water supply system is required to pay water capital recovery charges, as calculated in this section. Premises on which a larger connection or additional connection(s) are installed shall be considered newly connected to the city water supply system. Water capital recovery charges not paid in full at the time of connection shall be levied against the property as a single lot assessment in accordance with Chapters 12, 13, and 27. In addition to the charges provided in Chapter 27, every premises newly connected to the city water supply system, including premises on which a larger connection or additional connection(s) are installed, also are required to pay sanitary sewer charges pursuant to Chapter 28, provided that sewer charges will not be required when no sanitary sewer is available for the premises to connect to. (1) Water capital recovery charges consist of a charge for capacity generating asset capital costs, which varies by meter size, and a charge for non-capacity generating asset capital costs, which is uniform. Water capital recovery charges are calculated as follows: Meter Size | Capacity Generating Assets Charge | Non-Capacity Generating Assets Charge | Total Water Capital Recovery Charge Displacement Meters 0.62 | $5,054.00 | $220.00 | $5,274.00 0.75 | $5,054.00 | $220.00 | $5,274.00 1.00 | $8,424.00 | $220.00 | $8,644.00 1.50 | $16,848.00 | $220.00 | $17,068.00 2.00 | $26,957.00 | $220.00 | $27,177.00 Magmeters 0.75 | $9,266.00 | $220.00 | $9,486.00 1.50 | $22,745.00 | $220.00 | $22,965.00 2.00 | $37,065.00 | $220.00 | $37,285.00 2.50 | $84,239.00 | $220.00 | $84,459.00 3.00 | $126,359.00 | $220.00 | $126,579.00 4.00 | $210,598.00 | $220.00 | $210,818.00 6.00 | $471,740.00 | $220.00 | $471,960.00 8.00 | $614,947.00 | $220.00 | $615,167.00 10.00 | $985,599.00 | $220.00 | $985,819.00 12.00 | $1,482,611.00 | $220.00 | $1,482,831.00 (2) The capacity generating assets charge component is reduced by a credit of 51% for the following categories of properties: A. A parcel that is part of a development project for which the owner or developer constructed and dedicated to the city pursuant to an agreement with the city, an addition or enhancement to that portion of the city water supply system that serves the development and to which the parcel connects. B. A parcel that was part of the city before 2004, or whose parent parcel was part of the city before 2004, and connects to an existing water main built before 2004. C. A parcel that connects to a water main first constructed by the city after December 31, 2014. Parcels in this category also will pay an extension charge component as provided in subsection (3). Water capital recovery charges with the credit applied to reduce the capacity generating assets charge component are calculated as follows: Meter Size | Capacity Generating Assets Charge with Credit | Non-Capacity Generating Assets Charge | Total Water Capital Recovery Charge with Credit Displacement Meters 0.62 | $2,476.00 | $220.00 | $2,696.00 0.75 | $2,476.00 | $220.00 | $2,696.00 1.00 | $4,128.00 | $220.00 | $4,348.00 1.50 | $8,255.00 | $220.00 | $8,475.00 2.00 | $13,208.00 | $220.00 | $13,428.00 Magmeters 0.75 | $4,540.00 | $220.00 | $4,760.00 1.50 | $11,145.00 | $220.00 | $11,365.00 2.00 | $18,162.00 | $220.00 | $18,382.00 2.50 | $41,277.00 | $220.00 | $41,497.00 3.00 | $61,915.00 | $220.00 | $62,135.00 4.00 | $103,193.00 | $220.00 | $103,413.00 6.00 | $231,152.00 | $220.00 | $231,372.00 8.00 | $301,323.00 | $220.00 | $301,543.00 10.00 | $482,943.00 | $220.00 | $483,163.00 12.00 | $726,479.00 | $220.00 | $726,699.00 When a property increases the size of an existing connection to the city water supply system or replaces an existing connection with a larger connection, defined by the meter sizes, the new water capital recovery charge shall be the difference between the charge shown above for the existing meter size and the charge shown above for the new meter size. When a property decreases the size of an existing connection to the city water supply system or replaces an existing connection with a smaller connection, defined by the meter sizes, the city will not refund any prior improvement or connection charge. (3) The water capital recovery charge for a property newly connecting directly or indirectly to a water main first constructed by the city after December 31, 2014, shall also include an extension charge component, which will be uniform. Water capital recovery charges with the extension charge component and with the credit applied to reduce the capacity generating assets charge component are calculated as follows: Meter Size | Capacity Generating Assets Charge with Credit | Non-Capacity Generating Assets Charge | Extension Charge | Total Water Capital Recovery Charge with Credit Displacement Meters 0.62 | $2,476.00 | $220.00 | $18,275.00 | $20,971.00 0.75 | $2,476.00 | $220.00 | $18,275.00 | $20,971.00 1.00 | $4,128.00 | $220.00 | $18,275.00 | $22,623.00 1.50 | $8,255.00 | $220.00 | $18,275.00 | $26,750.00 2.00 | $13,208.00 | $220.00 | $18,275.00 | $31,703.00 Magmeters 0.75 | $4,540.00 | $220.00 | $18,275.00 | $23,035.00 1.50 | $11,145.00 | $220.00 | $18,275.00 | $29,640.00 2.00 | $18,162.00 | $220.00 | $18,275.00 | $36,657.00 2.50 | $41,277.00 | $220.00 | $18,275.00 | $59,772.00 3.00 | $61,915.00 | $220.00 | $18,275.00 | $80,410.00 4.00 | $103,193.00 | $220.00 | $18,275.00 | $121,688.00 6.00 | $231,152.00 | $220.00 | $18,275.00 | $249,647.00 8.00 | $301,323.00 | $220.00 | $18,275.00 | $319,818.00 10.00 | $482,943.00 | $220.00 | $18,275.00 | $501,438.00 12.00 | $726,479.00 | $220.00 | $18,275.00 | $744,974.00 (4) If a property connects to the city water supply system on or after July 1, 2015, and before April 1, 2016, and has paid or been assessed water main improvement charges and/or connection charges at the time of that connection, the property owner shall be entitled to a refund of the difference between the sum of those charges and the applicable water capital recovery charge calculated in accordance with this section if it is less. Provided, that if the property also connected to the city water supply system for fire service and/or to the city sanitary sewer system on or after July 1, 2015, and before April 1, 2016, the property owner must make the same choice of charges under this subsection 2:22b(4) for the connection to the city water supply system for domestic service, under subsection 2:22c(4) for the connection to the city water supply system for fire service, and under subsection 2:42.4(5) for the connection to the city sanitary sewer system. If the property owner is paying installments, the installment payments will be adjusted accordingly. (5) Water meters shall be sized according to the rules and regulations of the public services area to serve the premises adequately. Premises newly connected to the city water system shall pay an appropriate meter charge based on meter size. Meter charges shall be fixed by the public services area in accordance with regulations approved by the City Council and shall be not less than the cost of materials, equipment, labor and overhead attributable to such installation. Existing meters improperly sized according to the above regulations shall be replaced by the public services area and the appropriated meter charge shall be levied. Existing fire service lines that do not have a detector check meter installed shall have a detector check meter installed by and remain the property of the city. (6) The installation costs that are required to be paid for installation of water service stubs shall be fixed by the public services area in accordance with regulations approved by the City Council and shall be not less than the cost of materials, equipment, labor and overhead attributable to such installation. (7) Collection of payments, including interest and penalties, shall be in accordance with subsections 1:295(2) and 1:299(2) of Chapter 13.

(Ord. No. 15-59, 5-4-59; Ord. No. 24-69, 5-19-69; Ord. No. 46-73, 11-26-73; Ord. No. 48-77, 1-9-78; Ord. No. 30-79, 5-24-79; Ord. No. 25-85, 7-15-85; Ord. No. 33-92, § 1, 6-1-92; Ord. No. 49-03, § 2, 1-5-04; Ord. No. 43-04, § 10, 1-3-05; Ord. No. 19-07, § 2, 6-18-07; Ord. No. 08-36, § 1, 11-6-08; Ord. No. 16-03, § 3, 3-21-16)