For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.258.070 — Nonconforming Development

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.258.070

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/129c6ab9-419f-44e4-88e8-e8c9ea96a9a7

33.258.070 Nonconforming Development

A. Purpose. This section is primarily aimed at upgrading nonconforming development elements that affect the appearance and impacts of a site. It is not intended to require extensive changes that would be extremely impractical such as moving or lowering buildings. B. Continued operation. Nonconforming developments may continue unless specifically limited by Subsection D. below or other regulations in this Title. C. Changes. 1. Changes to the site that do not alter the nonconforming development are allowed. 2. Changes to the nonconforming development are allowed as follows: a. Changes that bring the nonconforming development closer to conformance are allowed; and b. Changes to the nonconforming development that do not move it closer to conformance are subject to the adjustment process unless prohibited. D. Development that must be brought into conformance. The regulations of this subsection are divided into two types of situations, depending upon whether the use is also nonconforming or not. These regulations apply except where superseded by more specific regulations in the code. 1. Nonconforming development with a new nonconforming use or new non-conforming residential density. When there is a change to a different non-conforming use, or a change from a nonconforming nonresidential use to a non-conforming residential density, the following nonconforming development must be brought into compliance with the development standards that apply to the site (base, overlay, plan district, special use, tree density standards in Title 11): a. Landscaping and trees required for the following areas: • Exterior display, storage, and work activity areas; • Setbacks for surface parking and exterior development areas; • Interior parking lot landscaping; • Existing building setbacks; • Minimum landscaped areas (where land is not used for structures, parking, or exterior improvements); and • On-site tree density standards of Subsection 11.50.050.C. b. Pedestrian circulation systems, as set out in the pedestrian standards that apply to the site; c. Bicycle parking by upgrading existing bicycle parking and providing additional spaces in order to comply with 33.266.200 and 33.266.210; d. Screening; and e. Paving of surface parking and exterior storage and display areas. 2. Nonconforming development with an existing nonconforming use, allowed use, limited use, or conditional use. The requirements of this Paragraph do not apply until January 1, 2029. On and after January 1, 2029, nonconforming development associated with an existing nonconforming use, an allowed use, a limited use, or a conditional use, must meet the requirements stated below. When alterations are made that are over the threshold of Subparagraph D.2.a., the site must be brought into conformance with the development standards listed in Subparagraph D.2.b. The value of the alterations is based on the entire project, not individual building permits. a. Thresholds triggering compliance. The standards of Subparagraph D.2.b., below, must be met when the value of the proposed alterations on the site, as determined by PP&D, is more than $366,300. The following alterations and improvements do not count toward the threshold: (1) Replace a manufactured dwelling in a manufactured dwelling park; (2) Alterations required by approved fire/life safety agreements; (3) Alterations related to the removal of existing architectural barriers, as required by the Americans with Disabilities Act, or as specified in Section 1113 of the Oregon Structural Specialty Code; (4) Alterations required by Chapter 24.85, Interim Seismic Design Requirements for Existing Buildings; (5) Improvements to on-site stormwater management facilities in conformance with Chapter 17.38, Drainage and Water Quality, and the Stormwater Management Manual; and (6) Improvements made to sites in order to comply with Chapter 21.35, Wellfield Protection Program, requirements. (7) Energy efficiency or renewable energy improvements that meet the Public Purpose Administrator incentive criteria whether or not the project applies for and receives the incentive; (8) Landscaping required by 33.475.220; (9) Removal or remediation of hazardous substances conducted under ORS 465.200-545 & 900; and (10) The installation of electric bike and electric vehicle chargers and accessory equipment. b. Standards which must be met. Development not complying with the development standards listed below must be brought into conformance or receive an adjustment. (1) Landscaping and trees required for the following areas: • Exterior display, storage, and work activity areas; • Setbacks for surface parking and exterior development areas; • Interior parking lot landscaping; • Existing building setbacks; • Minimum landscaped areas (where land is not used for structures, parking, or exterior improvements); and • On-site tree density standards of Subsection 11.50.050.C. (2) Pedestrian circulation systems, as set out in the pedestrian standards that apply to the site; (3) Bicycle parking by upgrading existing racks and providing additional spaces in order to comply with 33.266.200, Bicycle Parking as follows: • Major remodeling projects must meet the standards for all bicycle parking; • Sites with accessory surface parking must meet the standards for all bicycle parking; • In all other situations, the amounts and standards for short-term bicycle parking must be met. (4) Screening; and (5) Required paving of surface parking and exterior storage and display areas. c. Area of required improvements. (1) Generally. Except as provided in D.2.c(2), below, required improvements must be made for the entire site. (2) Exception for sites with ground leases or permanent utility easements. Required improvements may be limited to a smaller area if there is a ground lease or permanent utility easement for the portion of the site where the alterations are proposed. If all of the following are met, the area of the ground lease or permanent utility easement will be considered as a separate site for purposes of required improvements. The applicant must meet the following: • The signed ground lease, utility easement – or excerpts from the lease document or utility easement – must be submitted to PP&D. The portions of the lease or utility easement must include the following: − The term of the lease or utility easement. There must be at least one year remaining on the ground lease or utility easement; and − A legal description of the boundaries of the lease or utility easement. • The boundaries of the ground lease or utility easement must be shown on the site plan submitted with the building permit application; • The area of the lease or utility easement must include all existing and any proposed development that is required for, or is used exclusively by, uses within the area of the lease or easement; and • Screening is not required along the boundaries of ground leases or utility easement that are interior to the site. d. Timing and cost of required improvements. The applicant may choose one of the following options for making the required improvements: (1) Option 1. Under Option 1, required improvements must be made as part of the alteration that triggers the required improvements. However, the cost of required improvements is limited to 10 percent of the value of the proposed alterations. It is the responsibility of the applicant to document the value of the required improvements. When all required improvements are not being made, the applicant may choose which of the improvements listed in Subparagraph D.2.b to make. If improvements to nonconforming development are also required by regulations in a plan district or overlay zone, those improvements must be made before those listed in Subparagraph D.2.b. (2) Option 2. Under Option 2, the required improvements may be made over several years, based on the compliance period identified in Table 258-1. However, by the end of the compliance period, the site must be brought fully into compliance with the standards listed in Subparagraph D.2.b. When this option is chosen, the following applies: • Before a building permit is issued, the applicant must submit the following to PP&D: − Application. An application, including a Nonconforming Development Assessment, which identifies in writing and on a site plan, all development that does not meet the standards listed in subparagraph D.2.b. − Covenant. The City-approved covenant, which is available in the Development Services Center, is required. The covenant identifies development on the site that does not meet the standards listed in subparagraph D.2.b, and requires the owner to bring that development fully into compliance with this Title. The covenant also specifies the date by which the owner will bring the nonconforming development into full compliance. The date must be within the compliance periods set out in Table 258-1. The covenant must be recorded as specified in Subsection 33.700.060.B. • The nonconforming development identified in the Nonconforming Development Assessment must be brought into full conformance with the requirements of this Title that are in effect on the date when the permit application is submitted. The compliance period begins when a building permit is issued for alterations to the site of more than $366,300. The compliance periods are based on the size of the site. The compliance periods are identified in Table 258-1. • By the end of the compliance period, the applicant or owner must request that the site be certified by PP&D as in compliance with the standards listed in Subparagraph D.2.b. on the date when the permit application was submitted. A permit documenting full conformance with these standards is required and must receive final inspection approval prior to PP&D certification. • If certification is requested by the end of the compliance period and PP&D certifies the site as in compliance, a two-year grace period begins. The grace period begins at the end of the compliance period, even if PP&D certifies the site before the end of the compliance period. During the grace period, no upgrades to nonconforming development are required. • If certification is not requested, or if the site is not fully in conformance by the end of the compliance period, no additional building permits will be issued until the site is certified. • If the regulations referred to by Subparagraph D.2.b, or in D.2.b itself, are amended after the Nonconforming Development Assessment is received by PP&D, and those amendments result in development on the site that was not addressed by the Assessment becoming nonconforming, the applicant must, at the end of the grace period, address the new nonconforming development using Option 1 or Option 2. If the applicant chooses Option 2, a separate Nonconforming Development Assessment, covenant, and compliance period will be required for the new nonconforming development. Table 258-1 Compliance Periods for Option 2

![Table 258-1 Compliance Periods for Option 2](https://figures.74-208-44-221.nip.io/portland/20261114/257fb7f80f904e79a1b7b9b84f3cf084022746ea0aa1b5cdea09ef52a083f9d5.png)

E. Loss of nonconforming development status. 1. Discontinuance. If a nonconforming exterior development, such as an exterior storage area, is unused for 3 continuous years, the nonconforming rights are lost and a nonconforming exterior development may not be re-established. If the exterior development is unused for less than 3 continuous years, a nonconforming exterior development may be re-established, unless stated otherwise in Subsection D. above. 2. Destruction. When a structure or other development that has nonconforming elements is removed or intentionally destroyed, replacement structures and other development must comply with the development standards of the base zone, overlay zone and plan district. When a structure that has non-conforming elements is partially or totally damaged by fire or other causes beyond the control of the owner, the structure may be rebuilt using the same structure footprint. An adjustment is required to allow the replacement structure to be more out of compliance with the development standards than the previous structure. However, detached garages in residential zones are subject to the provisions for accessory structures of 33.110.250 and 33.120.280 (Single-Dwelling and Multi-Dwelling chapters, respectively). F. Sites that are nonconforming in parking spaces. If changes to a use or building are made on a site that is nonconforming in the number of maximum allowed parking spaces, existing parking spaces that are in excess of the maximum may be retained if none of the dimensions of the parking area increase. Within the existing parking area, the layout of the parking spaces may be redesigned and the parking area re-striped if all requirements for setbacks, landscaping, and parking space and aisle dimensions in Chapter 33.266, Parking, Loading, and Transportation and Parking Demand Management are met. G. Nonconforming signs. The regulations for nonconforming signs are stated in Title 32, Signs and Related Regulations.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.