Requirements.
Hattiesburg Code of Ordinances § 46-37
in effectSec. 46-37. - Requirements.
The city will implement the complete streets principles as follows:
(1) Every transportation improvement project shall incorporate complete streets infrastructure including both bicycle and pedestrian ways sufficient to enable reasonably safe travel along and across the right-of-way for each category of users; unless one or more of these conditions exists and is documented:
a. Bicyclists or pedestrians are prohibited by law from using the roadway. In this instance, a greater effort may be necessary to accommodate bicyclists and pedestrians elsewhere within the right-of-way or within the same transportation corridor.
b. The cost of establishing bikeways or walkways would be excessively disproportionate to the total cost of the transportation project. The term "excessively disproportionate" means exceeding 20 percent of the total cost.
c. Severe existing topographic, natural resource, or right-of-way constraints exist that preclude construction of bicycle or pedestrian ways without incurring excessive costs.
d. Bicycle ways will not be required on local Streets where the speed limit is 25 miles per hour or less.
e. Bicycle ways will not be required if a parallel bicycle way exists within a 400-foot distance.
f. Pedestrian ways will not be required in areas of very low population density.
g. The city council issues a documented exception concluding that application of complete streets principles to a location is inappropriate because it would be contrary to public benefit and safety.
(2) Sidewalks, shared-use paths, street crossings (including over and under passes), pedestrian signals, signs, street furniture, transit stops, and other facilities, shall be designed, constructed, operated, and maintained so that all pedestrians, including people with disabilities, can travel safely and independently.
(3) As feasible, the city shall incorporate complete streets infrastructure into existing streets to improve the safety and convenience of users, and construct and enhance the transportation network for each category of users.
(4) If the safety and convenience of users can be improved within the scope of pavement resurfacing, restriping, or signalization operations on streets, such projects shall implement complete streets infrastructure where feasible.
(5) The department of engineering and department of urban development shall review and develop proposed revisions to all appropriate zoning and subdivision codes, procedures, regulations, guidelines, and design standards to integrate, accommodate, and balance the needs of all users in all transportation improvement projects.
(Ord. No. 3068, § 3, 7-5-2011)
Source: City of Hattiesburg, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/hattiesburg/codes/code_of_ordinances?nodeId=COOR_CH46STSIOTPUPL_ARTIICOSTPO_S46-37REFetched: 11/1/2026