§ 33.110.202 — When Primary Structures are Allowed
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.110.202
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/135679a8-b4f7-48c6-8134-32ce50fe5c30
33.110.202 When Primary Structures are Allowed
A. Purpose. The regulations of this section allow for development of primary structures on lots and lots of record that are an adequate size, but do not legitimize plots that were divided after subdivision and partitioning regulations were established. The regulations ensure that development on a site will in most cases be able to comply with all site development standards. The regulations also allow development of primary structures on lots that were large enough in the past, but were reduced by condemnation or required dedications for right-of-way. B. Adjustments. Except as allowed by C.4.a and C.5, adjustments to this section are prohibited. C. Primary structures allowed. Development of a primary structure is allowed as follows: 1. On a lot created on or after July 26, 1979; 2. On a lot created through the Planned Development or Planned Unit Development process; 3. On a lot, lot of record, lot remnant, or combinations thereof that did not abut a lot, lot of record, or lot remnant under the same ownership on July 26, 1979, and has not abutted a lot, lot of record, or lot remnant under the same ownership since July 26, 1979; 4. On a lot or adjusted lot or combination thereof that either: a. Meets the minimum lot size requirements stated in Table 110-3. Until January 2, 2032, adjustments to reduce the minimum lot size requirements by up to 10 percent may be requested. Beginning January 2, 2032, adjustments are prohibited; or b. Does not meet the minimum lot size requirements stated in Table 110-3 but meets all of the following: (1) No portion of the lot, adjusted lot or combination is in an Environmental, River Environmental, or Pleasant Valley Natural Resources overlay zone; (2) No portion of the lot, adjusted lot or combination is in the combined flood hazard area; and (3) The lot, adjusted lot or combination has an average slope of less than 25 percent. 5. On a lot of record or lot remnant or combination thereof that meets the minimum lot size requirements of Table 110-3. Until January 2, 2032, adjustments to reduce the minimum lot size requirements by up to 10 percent may be requested. Beginning January 2, 2032, adjustments are prohibited. D. Plots. Development is prohibited on plots that are not lots, adjusted lots, lots of record, lot remnants, or tracts. Table 110-3 Minimum Lot Size Requirements

Notes: [1] A primary structure is allowed on a lot or lot of record that did meet the requirements of Table 110-3 in the past but was reduced below the requirements solely because of condemnation or required dedication by a public agency for right-of-way. [2] In the R5 zone, the minimum size requirements for adjusted lots and lot remnants approved through a property line adjustment under 33.677.300.A.4. or 33.677.300.C. are 36 ft. wide and 1,600 sq. ft. [3] In the R20 zone, a primary structure is allowed on a lot, lot of record, adjusted lot, lot remnant, or combination thereof that did meet the requirements of Table 110-3 in the past but no longer meets the requirements solely due to a zone change effective on May 24, 2018. [4] A primary structure is allowed on a lot, lot of record, adjusted lot, lot remnant, or combination thereof that was separated from abutting lots through a lot confirmation that was finalized before September 11, 2020. [5] Lot width for a flag lot is measured at the midpoint of the flag portion of the lot.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
