For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 601.045 — Floodplain development permit

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 601.045

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/13741d86-c9c8-4a45-93a0-b482a5123e01

Sec. 601.045. - Floodplain development permit.

(a) Applicability. A development permit shall be obtained before construction or development begins within any area horizontally within the SFHA established in SRC 601.030(a) or within an interim flood hazard area established in SRC 601.030(c). The development permit shall be required for all structures, including manufactured dwellings, and for all other development, as defined in SRC 601.005, including fill and other development activities. (b) Classes. (1) Class 1 floodplain development permit. A Class 1 floodplain development permit is required for any development within the SFHA which does not require a mitigation assessment per SRC 601.100. (2) Class 2 floodplain development permit. A Class 2 floodplain development permit is required for any development within the SFHA which requires a mitigation assessment per SRC 601.100. (c) Procedure type. (1) A Class 1 floodplain development permit is processed as a Type I procedure under SRC Chapter 300. (2) A Class 2 floodplain development permit is processed as a Type II procedure under SRC Chapter 300. (d) Submittal requirements for Class 1 floodplain development permit. In lieu of the application submittal requirements under SRC Chapter 300, an application for a Class 1 floodplain development permit shall include the following: (1) A completed application form; (2) Plans, of a size and form and in the number of copies meeting the standards established by the Floodplain Administrator, showing: (A) The nature, location, dimensions, and elevations of the area subject to the development application; and (B) The location of existing and proposed structures, fill, storage of materials, and drainage facilities; (3) In riverine flood zones, the proposed elevation (in relation to mean sea level) of the lowest floor (including basement) and all attendant utilities of all new and substantially improved structures, in accordance with the requirements of SRC 601.040(b); (4) The proposed elevation in relation to mean sea level to which any non-residential structure will be floodproofed; (5) A certification by a registered professional engineer or architected licensed in the State of Oregon that the floodproofing methods proposed for any non-residential structure meet the floodproofing criteria for non-residential structures in SRC 601.075(c)(3); (6) A description of the extent to which any watercourse will be altered or relocated; (7) Base Flood Elevation data for subdivision proposals or other development when required pursuant to SRC 601.040(a) and SRC 601.070(b); (8) A substantial improvement calculation for any improvement, addition, reconstruction, renovation, or rehabilitation of an existing structure; and (9) The amount and location of any fill or excavation activities proposed. (e) Submittal requirements for Class 2 floodplain development permit. In lieu of the application submittal requirements under SRC Chapter 300, an application for a Class 2 floodplain development permit shall include the following: (1) All of the submittal requirements for a Class 1 floodplain development permit under subsection (d) of this section; and (2) A floodplain mitigation assessment and mitigation plan in accordance with the requirements or SRC 601.100. (f) Criteria. (1) Class 1 floodplain development permit. A Class 1 floodplain development permit shall be granted if the proposed development meets all applicable standards of this chapter. (2) Class 2 floodplain development permit. A Class 2 floodplain development permit shall be granted if: (A) The proposed development meets all applicable standards of this chapter; and (B) The application includes a mitigation assessment and mitigation plan which has been prepared in accordance with SRC 601.100 that demonstrates no-net loss of the natural and beneficial functions of floodplains in the SFHA, including floodplain storage; water quality; and riparian vegetation. (g) Scope of work authorized by permit. The issuance of a floodplain development permit under the provisions of this chapter shall be held to authorize work only in accordance with the provisions of this chapter, the approved plans, and work necessarily implied therefrom. The issuance of such permit shall not be construed to be a permit for or approval of any violation of the provisions of this chapter or any other applicable law or ordinance. The issuance of a flood plain development permit based on submitted plans shall not thereafter prevent the Director from requiring the correction of errors or apparent violations contained therein, or from preventing operations being carried on thereunder when in violation of any applicable law or ordinance. (h) Expiration. Transfer of floodplain development permit. Floodplain development permits shall expire as provided in SRC 300.850. (i) Plan review and permit fees. (1) An application for a floodplain development permit shall be accompanied by the plan review and permit fees as prescribed by resolution of the Council. (2) Fees set by resolution are fixed and nonrefundable, and are required to support plans review, permit issuance, and inspection services. (3) Work being done under contract with the City of Salem shall be exempt from the permit fees required under this section. (4) Where work for which a permit is required by this chapter is commenced or proceeds prior to obtaining the permit, the fees specified in subsection (1) of this section shall be doubled, but the payment of such double fees shall not relieve any person from fully complying with the requirements of this chapter in the execution of the work nor from any other penalties prescribed herein.

(Ord. No. 17-19, § 2(Exh. A), 10-14-2019; Ord. No. 6-25, § 1(Exh. A), 6-9-2025)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.