For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-74 — Construction requirements for public sewers and drains

Code of Ordinances of the City of Providence, Rhode Island (Supp. No. 8: codified through Ordinance No. 2026-10, enacted March 5, 2026) · Providence Code of Ordinances § 25-74

Corpus is an independent public-information project, not the official City of Providence website. Stable reference: corpuslaw.us/code/139dd72f-489a-475f-9ecf-d9d70cdd01d5

Sec. 25-74. - Construction requirements for public sewers and drains.

(a) Building sewer or drain connection required. The director is hereby authorized in all cases where there is a public sewer or drain in any street of the city or easement held by the city, to cause every owner of land adjoining such street, or easement, his agent, or tenant to provide, subject to the provisions of this article, a sufficient building sewer or drain from his house, yard or lot, to and into such public sewer or drain, whenever in the opinion of the director the same shall be necessary for the protection of the public health, and shall, thereupon, give such owner, agent or tenant notice in writing, specifying the time within which such building sewer or drain shall be constructed. The director shall prohibit the maintenance of any privy or cesspool on any premises connected with a public sewer or drain. Any person who neglects to construct a building sewer or drain under the provisions of this article within the time specified in such notice to do so, or maintains a privy in violation of such prohibition, shall forfeit and pay a penalty of two hundred dollars ($200.00) for each violation per day. Said penalty may be waived at the discretion of the director and/or city solicitor. (b) Installation of sanitary facilities; connection to public sewer; exceptions. The owner of any house, building or property used for human occupancy, employment, recreation or other purpose, situated within the city and abutting on any street, alley or right-of-way in which there is now located or in the future may be located a public sanitary sewer of the city, is hereby required at his expense to install suitable sanitary facilities therein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this article, within ninety (90) days after the date of official notice to do so, provided that said public sewer is determined to be accessible and available by the director and located within one hundred (100) feet to the property line. Extensions greater than ninety (90) days may be granted by the director to individual property owners upon appeal. Said extension shall be granted only when it can be demonstrated that the connection to the public sewer system would create an undue financial hardship upon the owner and an agreement between the owner and the director shall be enacted. Said agreement shall be conditioned on the following: (1) That the waste water from the subject property not be discharged directly or indirectly through groundwater to receiving waters; (2) That the property is served by an acceptable subsurface disposal system, as determined by the director; (3) That the agreement is nontransferable; that is, a new owner must connect up to the sewer system within ninety (90) days of the passing of papers; (4) That the owner agrees to pay the city sewer assessment charge as determined by the city's cost recovery program. (c) Procedure for laying out or constructing new public sewers and drains by the city. Whenever the laying out or construction of a new public sewer or drain by the city is wanted, application therefor shall be made by petition in writing to the mayor or city council signed by not less than six (6) adjacent property owners within six hundred (600) feet of the construction or by the city planning director or by the city engineer. Upon filing of said petition, the mayor or city council may refer the petition to the department of public works for investigation, hearing and report thereon. Before holding any hearing on said petition, the department of public works shall give all parties notice in the same manner as required by the zoning ordinance of the City of Providence. After hearing all interested parties in the same manner as provided in the said zoning ordinance, the department of public works shall report to the mayor or city council whether in the director's opinion, the public convenience or the public health require the laying out of construction of a new public sewer or drain by the city. (d) Preconstruction report, hearing requirements. (1) No new public sewer or drain shall be constructed by the city unless the question of such construction or making shall first be referred to the department of public works, who shall report to the mayor or city council an estimate of its cost, the materials of which and the manner in which the same should be constructed or made, and an estimate of the damage likely to be occasioned by construction, taking land, or encroachment of watercourses; and if the sewer or drain or any portion thereof shall be outside the limits of the streets, it shall not be constructed or made otherwise than by the consent of all persons interested, without the same proceedings being followed as are required for laying out streets. (2) In addition to the aforementioned procedure, the department of public works shall conduct a hearing for all interested parties in accordance with the notification procedure set forth in the said zoning ordinance, after the estimate for damages and estimate of assessments is complete, but before final enactment by the city council. (e) Drawings to be on file. Whenever any public drain or sewer is to be built, the director shall make or cause to be made a plan of the same, showing the form, mode of construction, depth below the surface, relation of the sewer invert elevations to the city base, the alignment and general direction of the drain or sewer relative to the street lines or neighboring property, and the sill elevations of all houses to be served, which plan shall be kept on file in his office. This plan shall be the basis of the elevation and report by the director required under subsection (d) above. (f) Construction requirements—Location, materials. All public sewers which shall be ordered by mayor and city council in any street or highway shall, whenever practical, be laid out in such a way as to not hinder traffic and utilities in such street or highway, and shall be constructed of such materials and of such dimensions as the director shall direct. (g) Same—Other pipes not to interfere. Whenever any street shall be opened for the laying of pipes for water, gas or other purposes, or for the performance of any works of construction or repairs, such laying of pipes and repairs and work connected therewith, or such work of construction shall be executed so as not to obstruct the course, capacity or construction of a public sewer or drain, and whenever pipes for any purpose or any work of construction shall hereafter be found to exist at such depth or in such location as to interfere with any existing sewer or with the building of any public sewer of the required size, and at the proper depth and grades, the person maintaining the same shall, upon notice thereof, at once remove, change and alter such pipes or other works in such manner as the director may direct. If such person neglects to immediately remove, change or alter such pipes in accordance with the terms of notification, then the director may make such removal, change or alteration, and the cost thereof shall be paid by such person.

(Ord. 1979, ch. 79-37, Art. IV, §§ 1—7, 9-28-79)

Ask a question about Providence law

Corpus searches the Providence sections it holds and shows the ones that match, with their citations. Free, no sign-in.