§ 25-124 — Significant noncompliance or SNC
Code of Ordinances, City of Meridian, Mississippi (Supp. No. 55: codified through Ordinance No. 4604, enacted October 21, 2025) · Meridian Code of Ordinances § 25-124
Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/13e00fb2-f11b-4550-b11b-41fffa4e0e2c
Sec. 25-124. - Significant noncompliance or SNC.
An industrial pretreatment or fats oils and great permit holder shall be in significant noncompliance when one (1) or more of the following criteria are met. Enforcement guidelines shall be consistent with the city's enforcement response guide. (a) Violations of wastewater discharge limits. (1) Chronic violations of waste water discharge limits, defined here as those in which sixty-six (66) per cent or more of all the measurements taken for the same pollutant parameter (not including flow) during a six-month period exceed by any magnitude a numeric pretreatment standard or requirement including instantaneous limits, as defined by 40 CFR Part 403.3(1). (2) Technical Review Criteria (TRC) violations, defined here as those in which thirty-three (33) percent or more of all the measurements taken for the same pollutant parameter during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by 40 CFR Part 403.3(1) multiplied by the applicable TRC; (TRC = 1.4 for BOD, TSS, fats, oils, and grease): 1.2 for all other pollutants (except flow and pH). (3) Any other violation of a pretreatment standard or requirement as defined by 40 CFR 403.3(1) (daily maximum, long-term average, instantaneous limit, or narrative standard) that the control authority and/or city engineer determines has caused, alone or in combination with other discharges, interference or pass through; or endangered the health of the sewage treatment plant personnel or the public. (4) Any discharge of a pollutant or waste water that has caused imminent endangerment to human health, welfare, or to the environment or has resulted in either the control authority's or the POTW's, if different from the control authority's, exercise of its emergency authority to halt or prevent such a discharge. (b) Violations of compliance schedule milestones, contained in a pretreatment permit or enforcement order, for starting construction, completing construction, and attaining final compliance by ninety (90) days or more after the schedule date. (c) Failure to provide reports for compliance schedule, self-monitoring data, baseline monitoring reports, ninety-day compliance reports, and periodic compliance reports within thirty (30) days from the due date. (d) Failure to accurately report noncompliance. (e) Any other violation or group of violations that the public works director or city engineer determines will adversely affect the operation or implementation of the local pretreatment program.
(Ord. No. 4575, 6-20-23)
Ask a question about Meridian law
Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.
