IBC BUILDING CODE AMENDMENT, APPENDIX J GRADING, ADD SECTION J105.3, FINAL REPORTS
Boise City Code § 9-1A-97
in effect9-1A-97: IBC BUILDING CODE AMENDMENT, APPENDIX J GRADING, ADD SECTION J105.3, FINAL REPORTS:
J105.3 Final Reports. Upon completion of the rough grading work and at the final completion of the work, the following reports and drawings and supplements thereto are required for engineered grading or when professional inspection is performed for regular grading, as applicable.
1. An as-built grading plan prepared by the registered design professional retained to provide such services showing original ground surface elevations, as-graded ground surface elevations, lot drainage patterns, and the locations and elevations of surface drainage facilities and of the outlets of subsurface drains. As-constructed locations, elevations, and details of subsurface drains shall be shown as reported by the registered design professional. Registered design professionals shall state that to the best of their knowledge the work within their area of responsibility was done in accordance with the final approved grading plan.
2. A report prepared by the registered design professional retained to provide such services, including locations and elevations of field density tests, summaries of field and laboratory tests, other substantiating data, and comments on any changes made during final grading and their effect on the recommendations made in the approved soils engineering investigation report. Registered design professionals shall submit a statement that, to the best of their knowledge, the work within their area of responsibilities is in accordance with the approved soils engineering report and applicable provisions of this appendix Chapter.
3. A report prepared by the registered design professional retained to provide such services, including a final description of the geology of the site and any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. Registered design professionals shall submit a statement that, to the best of their knowledge, the work within their area of responsibility is in accordance with the approved engineering geology report and applicable provisions of this appendix Chapter.
4. The grading contractor shall submit in a form prescribed by the building official a statement of conformance with the as-built plan and the specifications.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
Source: Boise City, Idaho, City Code and City Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/boise_id/latest/boise/0-0-0-37089Fetched: 11/1/2026
