For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1003 — Municipal sewer/wastewater systems—State permit exemption

Tulsa Revised Ordinances (Supp. No. 3, Update 2: codified through Ordinance No. 25794, passed May 13, 2026) · Tulsa Revised Ordinances tit. 11-C, § 1003

Corpus is an independent public-information project, not the official City of Tulsa website. Stable reference: corpuslaw.us/code/14b956b6-dac7-4390-8fc2-d21a4a0907e4

Section 1003. - Municipal sewer/wastewater systems—State permit exemption.

A. Purpose. The purpose of this section is to qualify for exemptions from the Department of Environmental Quality construction permit requirement for wastewater collection systems, pursuant to Chapter 655 of the Oklahoma Administrative Code, entitled "Water Pollution Control Construction Standards," adopted by the Board of Environmental Quality on November 24, 1993. Gravity sewage construction lines not larger than twelve (12) inches in diameter are the only systems eligible for the exemption from the requirements of issuance of state construction permits, provided all systems which are constructed in whole or in part with funds from the United States EPA and/or with funds administered by the DEQ shall not be exempt from the requirement of obtaining a state construction permit. B. System and connection requirement. All municipal sewer/wastewater systems and any connection thereto shall be constructed in compliance with the applicable regulations, rules and requirements of the DEQ or the applicable regulations, rules and requirements of the City, whichever standard is more stringent. C. Approval required. All sewer line extensions to sewage treatment plants, lift stations and interceptor lines shall be approved by the Director prior to actual construction. D. Approval withheld. Approval shall be withheld if the sewage treatment plant, lift station or interceptor line to which the sewer line extension is to attach has reached or, with the addition of the proposed sewer line extension, would reach treatment or hydraulic capacities. Further, approval shall also be withheld if the sewer line extension does not meet or exceed the standards of the DEQ and the City, or may be withheld for any other reason. E. Review and approval of plans and specifications for sewage collection systems. Prior to construction, plans and specifications for sewage collection systems shall be reviewed, approved and signed by a professional engineer licensed by the State of Oklahoma and designated by the Director as being the responsible professional engineer in charge of connections to the sewage collection systems for the municipality. All approved plans and specifications shall be signed by the designated professional engineer indicating approval to proceed with construction in accordance with the approved plans and specifications. No sewage collection system construction shall proceed until plans and specifications have been reviewed and approved in this manner. F. Listing of projects. The Director or his designated representative shall supply DEQ with one (1) copy of all such approved plans and specifications together with a listing of all approved projects monthly, on or before the fifteenth of each month following approval of the plans and specifications for each project. The listing shall include the name, location and date of approval of each such project. G. Inspection. The Director or his designated representative shall inspect each approved project and shall prohibit commencement of any sewage collection system construction or connection prior to approval of plans and specifications in accordance with this chapter. H. System operation. The City shall operate its sewer/wastewater systems in compliance with the applicable rules of DEQ. I. System capacity exception. Should any proposed City sewer line extension bring a connected lift station, interceptor line or sewage treatment plant to its design capacity, the construction or connection of the proposed sewer line extension may still be allowed, to the extent approved by DEQ, under the following circumstances: 1. The City shall apply in writing to the DEQ for a variance allowing the specified construction to proceed within the area; 2. The application shall detail what the City will do to ensure that the construction or connection will not worsen any problems or treatment capacity, flow or bypassing of sewage; 3. The application shall include timetables for correcting any stated problems, prior to the connection of any additional loadings or flows, as a result of the construction for which approval is sought; 4. The application, if approved, shall become a condition of any permit issued for such construction by the DEQ; 5. Approval of construction in an area at design capacity which has not received such a variance from the DEQ may result in revocation of the City's overall sewer line permit exemption status, as provided by the rules and regulations of DEQ.

(Ord. No. 20781)

Ask a question about Tulsa law

Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.