§ 1.15 — Measurements
Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Land Development Code § 1.15
Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/14e6378a-e755-41df-960d-bbda5c83d706
Section 1.15. - Measurements.
A. Number of Residential Units Allowed (Density). The maximum number of residential units allowed on a site is determined by multiplying the maximum density allowed under the Comprehensive Plan by the parcel size (i.e., allowable comp plan density (x) parcel size), except: 1. When the zoning district of a parcel permits lot sizes that equate to a smaller maximum density for that parcel; or 2. When the size of the property has been decreased through a voluntary conveyance by the property owner to a condemning authority in lieu of formal eminent domain proceedings and the property owner received no compensation for the conveyance and such conveyance occurred prior to any development of the site. In such circumstance, the property owner may include the land that existed prior to the conveyance in the calculation of lot area for calculating the maximum allowable density on the site. In no event shall a property owner be eligible to include the land that existed prior to a taking when calculating the maximum allowable density on the site if the size of the property has been decreased through a formal eminent domain proceeding. B. Distance requirements. Unless otherwise provided herein, distances shall be measured in accordance with the following: 1. When the LDC requires a distance between uses or developments on different development parcels or there are LDC requirements for a development within a certain distance from another development parcel, the distance shall be measured using a straight-line measurement from the closest point of one parcel to the closest point of the parcel(s) involved. 2. When the LDC imposes requirements on a development within a certain distance of a zoning district, the distance shall be measured using a straight-line measurement from the closest point of a zoning district boundary to the closest point of the parcel(s) involved. When there is a distance requirement between a structure or building on the same development site, the distance shall be measured from the exterior of the buildings or structures, using a straight-line measurement from the closest points between the structures being measured. 3. When a portion of a parcel or development site lies within a certain distance of a zoning district or development and the LDC imposes requirements or regulations on a development or parcel within that distance, the requirements and regulations shall be applicable to the entire parcel or development site and not just to the portion within the specified distance. C. Floor area, gross. The sum of the floor areas of all floors of a building or structure from the exterior face of exterior walls, or from the centerline of a wall separating two buildings, excluding covered parking, loading areas, or parking garages. When an entire level of a building or structure is below ground as measured from floor to floor or ceiling slab to ceiling slab, the floor area of this level shall be excluded from the calculation of gross floor area. Unless otherwise specified, gross floor area for food service establishments shall also include any outdoor or patio floor area on the property used or designed for customer service. D. Floor area, net. The total floor area of all floors of a building shall be measured by excluding from the gross floor area stairwells and elevator shafts, equipment rooms, interior vehicular parking, loading, and all floors below the first or ground floor, except when such areas are used or intended to be used for human habitation or service to the public. E. Floor area ratio (FAR). The floor area ratio is measured by the net floor area of all buildings or structures on a lot, parcel, or site divided by the total lot, parcel, or site area. The maximum FAR established in the Code is based on total land area of the site in question, except when the size of the property has been decreased through a voluntary conveyance by the property owner to a condemning authority in lieu of formal eminent domain proceedings and the property owner received no compensation for the conveyance and such conveyance occurred prior to any development of the site. In such circumstance, the property owner may include the land that existed prior to the conveyance in the calculation of lot area for calculating the maximum allowable intensity on the site. In no event shall a property owner be eligible to include the land that existed prior to a taking when calculating the maximum allowable intensity on the site if the size of the property has been decreased through a formal eminent domain proceeding. F. Fractional measurements. 1. When units or measurements result in a requirement of a fraction, any such fraction equal to or greater than exactly 50% shall require the full requirement, unless otherwise provided for in these regulations. 2. Density fractional measurements. When calculating density, any fraction of a unit shall be rounded down to the nearest whole number, unless otherwise provided for in these regulations. G. Grade. 1. When used to measure habitable structures, grade shall be the highest elevation of: a. The natural elevation of the ground when compared to abutting properties. Natural elevation of the ground when compared to abutting properties, shall be derived by selecting a minimum of two elevation points on each adjoining property line and calculating the average of all the selected elevation points. This calculation will determine the reference plane for calculating the height of habitable structures only; b. The base flood elevation requirement for the lowest floor as shown on the flood insurance rate map published by the Federal Emergency Management Agency (FEMA); c. Eighteen inches above the FEMA base flood elevation requirement for the bottom of the Lowest Horizontal Structural Member (LHSM) of the lowest floor; or d. Eighteen inches above the State of Florida, Department of Environmental Protection minimum requirement for the bottom of the LHSM of the lowest floor. For purposes of the definition of grade, the term floor shall be defined as the top of the lowest inside surface of an enclosed area in a building, including the basement. For example, the top of the slab in a concrete slab construction or the top of wood flooring in wood frame construction. The term does not include an unfurnished or flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement area. 2. When used to measure non-habitable accessory structures, grade shall be the finished ground surface at the base of the accessory structure being measured. If a retaining wall elevates the non-habitable accessory structure, grade shall be the finished ground surface at the base of the retaining wall. H. Building Height. The height of buildings shall be measured from the lowest finished floor elevation to the lowest point of the highest horizontal eave or to the highest point of the highest parapet wall, whichever is higher. Church spires and steeples, chimneys, elevator towers, and similar features necessary to the design and function of a building but not designed for human occupancy, shall not be included in the measurement of overall building height. I. Lot coverage. That portion of a lot that is covered by all principal and accessory buildings. J. Lot depth. The depth of a lot is the distance measured from the mean direction of the side lines of the lot from the midpoint of the street lot line to the midpoint of the opposite main rear line of the lot. K. Lot width. The horizontal distance between the side lines of a lot measured at the front building setback line, or at the front property line where no front setback is required. L. Setback. A setback is the minimum horizontal distance between a structure and a property line. Setbacks shall extend and be measured perpendicular and inward from the respective property lines. M. Impervious surfaces calculations. Calculations of the maximum allowable percentage of impervious surfaces in the R-1 and RML zoning districts for compliance with Table 4.1.3.B. of this Code shall be made in accordance with the following table: Table 1.15.A. Calculation of Impervious Surfaces Calculation of 60% Maximum Impervious Surfaces | | Applicability: Development in R-1 and RML Zoning Districts Only | | Procedures and Methods of Calculation | | 1 | An Impervious Surface Calculation Sheet shall be submitted to the City for review and approval. If the 40% pervious requirement is not met the Contractor shall indicate on the Calculation Sheet the proposed methods to be used to reduce the percentage of impervious surfaces. | 2 | Impervious Surfaces - The following surfaces count towards the 60% maximum impervious surface area | Building area under roof, excluding roof overhangs 2 | Impervious Surfaces - The following surfaces count towards the 60% maximum impervious surface area | Driveways, walkways, etc. 2 | Impervious Surfaces - The following surfaces count towards the 60% maximum impervious surface area | Pool Decks 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Grass, landscaping beds, etc. (i.e., Green Space) 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | The surface area of pools. 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | The surface areas of pool decks that slope away from the pool with a drain system at the base of the wall which allows immediate percolation of the pool deck runoff. 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Pervious driveway pavers with pervious subgrade (A percentage reduction may be given for specified pavers) (see #7 below). 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Walkways with pervious pavers, stone, shell, etc. with pervious subgrade 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Roof areas where the gutter and downspouts discharge into an Aboveground Infiltration System or a Subsurface Exfiltration System (see #4, #5, and #6 below). 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Site specific alternative drainage or pervious systems as approved by the City Public Works Department (see #6 and # 7 below). 3 | Pervious Surfaces - The following surfaces do not count towards the 60% maximum impervious surface area | Lots in platted subdivisions where there is an approved Master Stormwater System. 4 | Aboveground Infiltration System | An Aboveground Infiltration System (grass swale, stone, etc.) shall be designed for the stormwater runoff from a 3 inch per hour - 1-hour duration rain event before overflowing. To obtain a reduction for an impervious area, the Aboveground Infiltration System shall be designed to an assumed percolation rate of a maximum of 1 inch of runoff in one hour unless separate percolation testing is provided. The remaining 2 inches of runoff shall be stored prior to percolating. 5 | Subsurface Exfiltration System | A Subsurface Exfiltration System (perforated pipe in stone, tank system, etc.) shall be designed for the stormwater runoff from a 3 inch per hour - 1-hour duration rain event before overflowing. To obtain a reduction for an impervious area, the Subsurface Exfiltration System shall be designed to an assumed percolation rate of a maximum of 1 inch of runoff in one hour unless separate percolation testing is provided. The remaining 2 inches of runoff shall be stored prior to percolating. 6 | Contractors, developers, or owners shall provide the specifications and details for the Aboveground Infiltration Systems and Subsurface Exfiltration Systems to the City for review and approval with submittal of a building permit. Once a typical system design is approved by the City, the same design may be resubmitted with only the revised impervious area reduction calculation and the sizing requirements for the components of the system. | 7 | The contractor, developer, or owner shall provide the specifications or details for alternative pervious products to the City Public Works Department for review and approval. |
(Ord. 4-22, § 1, 2-2-2022; Ord. 49-22, § 1, 8-3-2022; Ord. 10-26, § 1, 5-6-2026)
Ask a question about Cape Coral law
Corpus searches the Cape Coral sections it holds and shows the ones that match, with their citations. Free, no sign-in.
