Limitation on expenditures.
R.I. Gen. Laws § 46-15.5-6.1
in effect46-15.5-6.1. Limitation on expenditures.
The Bristol County water authority shall pay fifty percent (50%) of costs of planning,
design, permitting and construction of the additional and emergency connections authorized
by this chapter until the total cost thereof shall equal $29.6 million ($29,600,000).
All costs in excess of $29.6 million ($29,600,000) will be paid by the Bristol County
water authority. In the event that the total expenditures by the Bristol County water
authority for the planning, design, permitting and construction of the additional
and emergency connections authorized hereby shall be less than $14.8 million ($14,800,000),
the Bristol County water authority shall expend the differences for the planning,
design, permitting and construction of the existing systems enhancements, with the
first priority being given to the completion of a new raw water transmission line
to the existing Bristol County reservoirs.
P.L. 1993, ch. 243, § 2.