12.12.190 - Traffic calming projects.
A. The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) shall maintain a program for traffic calming that meets the following criteria: 1. The program shall focus on traffic calming projects that lower vehicle speed and improve street safety for all users. 2. NDOT shall coordinate with other departments including the planning department, fire department, the police department, metropolitan Nashville public schools, and the department of parks and recreation. 3. The program allows for neighborhood organizations to submit applications to identify, prioritize, and help mitigate the undesirable effects of traffic in residential neighborhoods. 4. NDOT shall select areas for traffic calming projects based on applications submitted pursuant to the traffic calming program at least once per year and/or as funding allows. 5. Applications shall be evaluated by NDOT using criteria established by NDOT and published on the metropolitan government website. 6. NDOT shall maintain a record of all applications for traffic calming projects and the neighborhoods selected for traffic calming projects. This record must be made available to the public on the metropolitan government website. B. NDOT may authorize private construction or funding of a traffic calming project by private organizations or entities, which may include but are not limited to neighborhood organizations, homeowner associations, merchant associations, and educational or cultural institutions, provided that: 1. The private organization or entity secures private funding for the proposed traffic calming project. This private funding must comprise the entire project cost, including engineering studies, design, permitting and construction/installation. Installation must conform to NDOT standard details and minimum specifications along with the criteria laid out in this section. 2. The private organization or entity must notify NDOT in writing of its intent to fund or install a traffic calming project. This letter of intent must include contact information, the street(s) in question, and the limits of installation. 3. Upon receiving the letter of intent, NDOT engineers will conduct initial assessments to ensure traffic calming program standards, as set by the department, are met. If the traffic calming proposal is found ineligible, NDOT will provide written notification of this determination and its reasons. 4. Provided that the traffic calming program standards are met, the applicant will be required to produce the following documents prior to permitting: a. A location map that clearly shows the neighborhood and street(s) proposed for traffic calming infrastructure. b. A design plan set stamped by a registered engineer conforming to NDOT traffic calming infrastructure requirements. c. A preliminary support petition containing at least ten signatures from property owners within the project scope that support installation of the traffic calming infrastructure. The petition must include a final signature block for the council member to sign in support of traffic infrastructure. The applicant must use a petition template provided by NDOT. d. A list of all names and addresses of property owners within the project scope and evidence that these individuals and/or entities have been contacted and provided copies of the traffic calming design plans. e. A list of materials, specifications, manufacturer, manufacturer recommendations for installation, and their respective quantities. All materials used must meet NDOT's minimum specifications and/or correspond to an item number included in a current metro contract. 5. Upon approval of all required documentation, NDOT may administer a neighborhood ballot process according to the traffic calming program standards established by the department. 6. Once documents have been approved by NDOT engineers and the ballot process, if applicable, is successful, the applicant may apply for a right-of-way permit to install the traffic calming infrastructure. 7. NDOT will assume maintenance and replacement responsibilities once the traffic calming infrastructure has passed inspection. 8. This Subsection B shall apply only to private construction of traffic calming infrastructure initiated by private organizations or entities and shall not apply to private funding of traffic calming through any other means, including as part of on-site or off-site traffic calming improvements required or recommended by NDOT. C. NDOT may authorize the private construction or funding of a traffic calming project by other means provided that: 1. One or more of the following has occurred: a. NDOT requires on-site or off-site traffic calming improvement(s) on adjacent streets or on existing or new street connections as part of permitting for a project that is being reviewed under existing entitlements; b. A traffic impact study recommends the on-site or off-site traffic calming improvement(s) as part of a rezoning or lot subdivision for residential developments pursuant to Section 17.20.140; c. NDOT recommends to the planning commission or planning department conditions for traffic calming improvement(s) within projects or on existing or new street connections for lot subdivisions that do not require a traffic impact study pursuant to Section 17.20.140; or d. NDOT recommends that the planning commission and/or the metropolitan council condition the provision of on-site or off-site traffic calming improvement(s) as part of a zone change or PUD revision approval. 2. Upon notification of one of the events listed in Subsection C.1, NDOT engineers will conduct initial assessments to ensure that traffic calming program standards as set by the department are met. If the traffic calming proposal is found ineligible, NDOT will provide written notification of this determination and its reasons. 3. Provided that the traffic calming program standards are met, the applicant will be required to produce the following documents prior to permitting: a. A location map that clearly shows the neighborhood and street(s) proposed for traffic calming infrastructure. b. A design plan set stamped by a registered engineer conforming to NDOT traffic calming infrastructure requirements. c. A list of materials, specifications, manufacturer, manufacturer recommendations for installation, and their respective quantities. Materials must meet NDOT's minimum specifications and/or correspond to an item number included in a current metro contract. 4. Once the proposed project has been approved by NDOT engineers, the applicant may apply for a right-of-way permit to install the traffic calming infrastructure. 5. NDOT will assume maintenance and replacement responsibilities once the traffic calming infrastructure has passed inspection. D. By August 1 of each year, NDOT shall submit a report to the metropolitan council of the applications received for the traffic calming program, the ranking of each application, and the metrics used to determine the ranking of the applications. This report should also include the status of projects currently in process and completed projects, the date of application for these projects, the date of completion, total cost, and any other projects implemented pursuant to subsections B and C above.
(Ord. BL2022-1572 § 1, 2023; Amdt. 1 with Ord. BL2004-374 § 1, 2004)
Ask a question about Metropolitan Government of Nashville and Davidson County law
Corpus searches the Metropolitan Government of Nashville and Davidson County sections it holds and shows the ones that match, with their citations. Free, no sign-in.