15.01.340 - Required building inspections.
Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed without first obtaining the approval of the building official. Upon receipt of a proper inspection request, the building official shall perform the following inspections: A. Foundation inspection. A foundation inspection shall be performed after excavations for footings are complete and any required reinforcing steel, structural embeds, grounding electrodes, piping and other equipment required by the construction documents or technical codes are in place and before concrete is placed. When required, a pad certification prepared by a licensed civil engineer shall be submitted to the building official prior to the performance of a foundation inspection. B. Framing inspection. A framing inspection shall be performed after all structural and non-structural components are in place as follows: 1. Wood and light gauge metal construction. Framing inspection of wood and light gauge metal construction shall be performed after the roof sheathing, all framing, fire blocking, shear panels and bracing are in place and all pipes, chimneys, vents and rough electrical, plumbing and mechanical system components are in place. 2. Concrete, steel and masonry construction. Framing inspection of concrete, steel and masonry construction shall be performed after all structural elements required by the approved construction documents and technical codes are in place, including reinforcing steel, structural steel, concrete, masonry, grout and mortar and all structural connections are complete. C. Insulation inspection. An insulation inspection shall be performed after all insulation is installed and fastened in place pursuant to the manufacturer's installation instructions, all caulking and sealing is installed, and all exterior openings are properly flashed. Exception: Commercial and residential insulation inspections are not required when insulation inspections are completed by an approved third party agency and a report is issued to the building official indicating such inspection was satisfactory completed based upon the current adopted energy codes. D. Lath and/or wallboard inspection. Lath and/or wallboard inspection shall be performed after all lathing and wall and ceiling board (interior and exterior) is in place and before any plastering is applied or before wallboard joints and fasteners are taped and finished. E. Exterior plaster. Brown coat inspections of three coat exterior plastering systems are not required. Exception: When completed in conjunction with residential re-pipe or other repairs. F. Final inspection. A final inspection and approval of all work, including final grading, shall be performed when the building or structure is completed and ready for occupancy and use but prior to any occupancy or use unless specific prior approval for occupancy or use has been granted by the building official. Exception. Freestanding walls and fences six feet or less in height. This exemption applies to existing walls constructed under permits issued prior to the effective date of this chapter.
(Ord. No. 3141, § 1, 4-1-2014; Ord. 2736, § 1 (part), 2008)
Ask a question about Henderson law
Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.