§ 1204 — Wastewater discharge permit issuance process
Tulsa Revised Ordinances (Supp. No. 3, Update 2: codified through Ordinance No. 25794, passed May 13, 2026) · Tulsa Revised Ordinances tit. 11-C, § 1204
Corpus is an independent public-information project, not the official City of Tulsa website. Stable reference: corpuslaw.us/code/16fd319a-1202-45b0-80fd-f79464cf93e5
Section 1204. - Wastewater discharge permit issuance process.
A. Wastewater Discharge Permit Duration. A wastewater discharge permit shall be issued for a specified time period, not to exceed five (5) years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five (5) years, at the discretion of the Director. A wastewater discharge permit will remain in effect until the issuance of a new wastewater discharge permit, or a decision is made by the Director not to issue a permit. B. Wastewater Discharge Permit Contents. A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the Director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, ensure worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW, 1. Wastewater discharge permits contain: a. A statement that indicates wastewater discharge permit issuance date, expiration date and effective date; b. A statement that the wastewater discharge permit is nontransferable without prior notification to the City in accordance with Subsection 1204.D of this chapter, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Wastewater discharge limits, including Best Management Practices, based on applicable Pretreatment Standards; d. Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of Pollutants (or Best Management Practice) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and e. A statement of applicable civil and criminal penalties for violation of Pretreatment Standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. f. Requirement for the development and impletation of a spill control plan as required by Subsection 1202.C of this chapter. g. Requirement for the user to notify the Director of any changes at the facility affecting its potential for a slug discharge. 2. Wastewater discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Requirements for the installation of Pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of Pollutants into the POTW; c. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; d. Requirements for installation and maintenance of inspection and sampling facilities and equipment including flow measurement devices; e. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state Pretreatment Standards, including those which become effective during the term of the wastewater discharge permit; f. A requirement for the User to meter the facility's water service independently of any other use; and g. Other conditions as deemed appropriate by the Director to ensure compliance with this chapter, and state and federal laws, rules, and regulations. C. Wastewater Discharge Permit Modifications. The Director may modify a wastewater discharge permit for good cause, including but not limited to the following reasons: 1. To incorporate any new or revised federal, state, or local Pretreatment Standards or requirements; 2. To address significant alterations or additions to the User's operation, processes, or Wastewater volume or character since the time of wastewater discharge permit issuance; 3. To require either a temporary or permanent reduction or elimination of the authorized discharge, due to a change in the POTW; 4. Information indicating that the permitted discharge poses a threat to the POTW, City personnel, or the receiving waters; 5. Violation of any terms or conditions of the wastewater discharge permit; 6. Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; 7. Revision of or a grant of variance from Categorical Pretreatment Standards pursuant to 40 C.F.R. § 403.13; 8. To correct typographical or other errors in the wastewater discharge permit; or 9. To reflect a transfer of the facility ownership or operation to a new owner or operator. D. Wastewater Discharge Permit Transfer. Wastewater discharge permits shall be issued to a User for a designated facility or facilities. A wastewater discharge permit shall not be reassigned, transferred, or sold to a new owner or new User, nor may it be used on different premises or for new or changed operations, unless the Director specifically gives approval. E. Wastewater Discharge Permit Revocation. The Director may revoke a wastewater discharge permit for good cause, including but not limited to the following reasons: 1. Failure to provide prior notification to the Director of changed conditions pursuant to Subsection 1205.E of this chapter; 2. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; 3. Falsifying self-monitoring reports; 4. Tampering with monitoring equipment; 5. Refusing to allow the Director timely access to the facility premises and records; 6. Failure to meet effluent limitations; 7. Failure to pay fines; 8. Failure to pay sewer charges; 9. Failure to meet compliance schedules; 10. Failure to complete a Wastewater survey or the wastewater discharge permit application; 11. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or 12. Violation of any Pretreatment Standard or requirement, or any terms of the wastewater discharge permit or this chapter. Wastewater discharge permits shall be voidable upon cessation of operations or transfer of business ownership. All wastewater discharge permits issued to a particular User are void upon the issuance of a new wastewater discharge permit to that User. F. Wastewater Discharge Permit Renewal. A User with an expiring wastewater discharge permit shall apply for a wastewater discharge permit renewal by submitting a complete permit application, in accordance with Subsection 1203.C of this chapter, prior to the expiration of the User's existing wastewater discharge permit. G. Wastewater Discharge Permit Appeal. Persons desiring to dispute the conditions of a wastewater discharge permit issued hereunder must file a written request for the Director to reconsider the action taken within fifteen (15) days of permit receipt. Where a request has merit, the Director may convene a hearing on the matter. In the event the User's appeal is successful, the Director may withdraw or modify the permit. If the Director fails to act within thirty (30) days of notice of an appeal, a request for reconsideration shall be deemed to be denied. The Director's decisions whether to withdraw or modify the disputed permit shall be considered final, unless a written notice for an appeal to the applicable Utility Authority is filed with the City Clerk's office within fifteen (15) days after service on the petitioner of the Director's decision. Within fifteen (15) days following the Utility Authority's action, any party desiring to dispute the Utility Authority's action may appeal to the City Council by filing a notice of appeal in the office of the City Clerk and providing notice to the other party (if applicable) and the Director. The appeal shall be heard by the City Council at its next available meeting after the filing of the notice of appeal. Permits issued by the Director shall remain in full effect throughout the appeal process.
(Ord. Nos. 17419, 19991; Ord. No. 22851, § 1, 3-28-2013)
Ask a question about Tulsa law
Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
