For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 530.020 — Fairview plan

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 530.020

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/170b1137-8fa3-4478-83fe-a3452fcb91a9

Sec. 530.020. - Fairview plan.

The Fairview plan is a master plan that identifies the goals and policies for development within the FMU zone. (a) Applicability. An approved Fairview plan shall be required prior to the approval of any refinement plan. (b) Procedure type. An application for the Fairview plan is processed as a Type III procedure under SRC chapter 300. (c) Submittal requirements. In addition to the submittal requirements for a Type III application under SRC chapter 300, an application for the Fairview plan shall include the following in the form of map(s), text, or both, as applicable: (1) A description of the purpose, main concepts, goals, policies, and general development guidelines for development within the FMU zone in light of the purpose of this chapter. (2) A conceptual open space plan for the entire FMU zone identifying an integrated network of open spaces for the purpose of preserving and enhancing identified natural drainage patterns, significant trees and vegetation, and wetlands; responding to significant topographical features; and providing opportunities for active and passive recreation. (3) A conceptual transportation and mobility plan for the entire FMU zone addressing the integration of pedestrian, transit, and vehicular use on the site and providing safe and efficient pedestrian, bicycle, and other non-single occupancy vehicle (SOV) mobility; promoting transit; and reducing SOV trips. (4) A transportation impact analysis (TIA) of the major transportation and circulation elements intended to serve the FMU zone. (5) A site analysis, which shall include the following: (A) Identification of significant natural and built constraints of the site and surroundings; (B) Identification of existing and potential transit connections; (C) Identification of adjacent parcels and structures within 150 feet of the FMU zone boundary; (D) On-site open space, recreational facilities, parks, and trails; (E) Identification and delineation of existing natural resources, including, but not limited to, wetlands, as identified on the Local Wetlands Inventory, perennial and intermittent streams, and significant tree stands or groves. Proposed methods for the preservation or conservation of these resources shall be identified, with attention given to the Natural Resource Guidelines under 530.065; (F) Identification of existing structures, roads, and other development; (G) Identification of existing provisions for city infrastructure and utilities; (H) Identification of area hydrology and water resources; (I) Identification of existing topography and slope; (J) General geologic character of the site; (K) Identification of general soil types on the site; (L) Identification and visual analysis of area viewsheds; and (M) An inventory of buildings, structures, sites, objects, and known archeological sites which possess the criteria for historic resource designation under SRC chapter 230. The inventory shall identify any buildings, structures, sites, objects, or known archeological sites for which official historic resource designation will be sought. The inventory may identify any buildings, structures, or sites designated by the applicant as "historically significant" that may be adaptively reused or renovated, but for which historic resource designation will not be sought. (d) Criteria. The Fairview plan shall be approved if all of the following criteria are met: (1) The plan conforms to the applicable provisions of the Salem Area Comprehensive Plan. (2) The plan is compatible with adjoining land uses. (3) The plan is physically feasible, given consideration of existing or proposed infrastructure and public services. (4) The plan conforms to the following goals: (A) Encourage mixed-use development, improved protection of open spaces and natural features, and greater housing and transportation options; (B) Encourage the innovative integration of park and school uses; (C) Encourage the principles of sustainable development and sustainable business practices; (D) Support affordable housing options and mixed-income neighborhoods; (E) Facilitate the resourceful use of land through the efficient arrangement of land uses, buildings, circulation systems, open space and infrastructure; (F) Encourage economic opportunities that comply with and support business practices; (G) Recognize the historic significance of buildings, structures, and sites, including archaeological sites, through appropriate means, including, but not limited to, obtaining official historic resource designation; and (H) Encourage energy conservation and improved air and water quality.

(Prior Code, § 530.020; Ord. No. 31-13; Ord. No. 3-22, § 1(Exh. A), 2-28-2022)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.