Sec. 49-35. - Detailed specifications.
The sidewalk, curb and gutter to be laid in the streets, alleys and public places of the city and all such construction hereafter put in, shall in all things conform to the following specifications: (1) General. The work shall in every respect be executed in a thorough and workmanlike manner and in the fulfillment of the intent and purpose of these specifications and in accordance to the plans, profiles and ordinances governing such work. All work and material shall be subject at all times to the inspection of the director of engineering and physical development, whose decision shall be final. The contractor will be required to preserve all stakes set by the director of engineering and physical development until authorized to remove the same and any expense of replacing stakes shall be paid for by the contractor. The contractor shall erect barriers and display lights and danger signals wherever and whenever necessary to properly guard the public from any danger due to his operations and he will be held responsible for all accidents and damages to life or property resulting from any neglect on his part to take the necessary precautions to guard openings and obstructions so as to make them safe at all times. At no time shall the contractor occupy more than one half (½) the width of any street or roadway with his material or equipment and he shall refrain from obstructing in any way reasonable access to any fire hydrant. (2) Control of work. Work shall be carried on in such a manner and sequence of operations as may be directed by the director of engineering and physical development and at all times the director of engineering and physical development shall have the authority to stop work when in his judgment the contractor is violating any of the provisions of these specifications or otherwise proceeding contrary to the intent thereof, or for any reason is failing to produce satisfactory results. (3) Skilled laborer. All labor employed in sidewalk and curb construction shall be thoroughly competent and highly skilled in the various operations in which they are engaged. The foreman shall have intimate knowledge of the proper methods of concrete mixing and construction and be able to interpret plans, lay out work from stakes and instruction sheets and carry out the work properly in the absence of the contractor. Cement finishers shall be experienced men in their craft and laborers must be able to understand and follow out orders given them as to handling, mixing, preparing, placing and tampering concrete. No intoxicated workman or man under the influence of liquor shall be tolerated upon the work. (4) Material platforms. When concrete work is being carried on contiguous to paved streets, all sand and crushed stone may be dumped on the cleaned pavement. Where adjacent natural roadway surfaces are hard and compact and free from mud, dirt and litter, the roadway surface may be trimmed, leveled and swept broom clean and the sand and crushed stone deposited thereon; in all other cases, however, the contractor shall provide a wooden or metal platform upon which to receive materials and care shall be taken to keep such material free from street dirt and mud prior to its use in making concrete. (5) Meter boxes, poles and obstructions. Contractors shall see to it that all meter boxes, water boxes, gratings and covers to openings of all kinds are set flush with the top of the finished walks, and shall refuse to lay walks until such fixtures are properly located and set. Contractors shall give due notice to all public utility companies having poles or guy-wires along the streets upon which curbing is to be constructed to move their poles so that they will come just inside of the curblines, before the curbing is built. Contractors shall refuse to construct all driveway approaches between curbing and sidewalks unless the gutters have been constructed or grades for them have been determined. Contractors shall also refuse to construct any steps or retaining walls adjoining sidewalks which project beyond the street lines. All such steps or walls shall be wholly upon private property. (6) Lines and grades. All lines and grades for sidewalk and curb construction shall be obtained from the director of engineering and physical development and requests for the same shall be made at least three (3) days in advance of the time the contractor expects to start work. Stakes set by the director of engineering and physical development shall be carefully preserved and the written instruction sheets concerning them shall be carefully followed and then returned to the office upon the completion of the work. The contractor shall keep a careful watch on his men to see that the curb and sidewalk forms are laid out properly so that the work upon completion will accurately conform to the lines and grades given by the director of engineering and physical development. The contractor shall at no time make any changes in the stakes, grades or lines without first consulting the director of engineering and physical development and if at any time there should appear to be any discrepancy or error or any question as to the proper alignment or grade, it shall be the duty of the contractor to immediately refer the matter to the director of engineering and physical development for advice as to how to proceed. (7) Grading. All excavation or filling necessary to bring the foundation level to a proper elevation and subgrade shall be made by the contractor. Where excavation is required, it shall be carried to such a depth that after thorough tamping, the subgrade will be at an elevation permitting the full depth of concrete required. If soft spongy spots are encountered for the subgrade, they shall be dug out and refilled with gravel, cinders, shell or other suitable material, which will form a hard foundation. Where filling is required, it shall be applied in layers not more than six (6) inches in thickness, each layer to be moistened and thoroughly tamped, and made sufficiently wide in the embankment to allow a berm at the sidewalk or curb level of one (1) foot on each side of the concrete with a slope of one and one half (1½) feet to every foot of rise. The contractor will be held responsible for all settlements of embankments, sidewalk or curbing and shall use the utmost precaution to make them solid, stable and unyielding. The city reserves the right to all surplus earth from excavations, which shall be delivered by the contractor to the city at such points (not to exceed two thousand five hundred (2,500) feet away) as the city may desire. (8) Description. These specifications shall govern the materials for and the construction of concrete sidewalks and of concrete curb and gutter in accordance with details shown on the plans and in conformity with the lines and grades established by the director of engineering and physical development. (9) Concrete. The concrete shall be composed of Portland cement, fine aggregate, coarse aggregate and water, proportioned and mixed as provided in these specifications. (10) Cement. Cement shall be either Type I or Type III of a standard brand of Portland cement, which shall conform to A.A.S.H.O. Standard Specification M85. (11) Water. Water for concrete shall be clean and free from injurious amounts of oil, acid, alkali, organic matter or other deleterious substances. When subjected to the mortar strength test, the strength at twenty-eight (28) days of mortar specimens made with the water under examination and normal Portland cement, shall be at least ninety (90) per cent of the strength of similar specimens made with the same cement and with water of known satisfactory quality. (12) Fine aggregate. Fine aggregate shall consist of natural sand, or sand prepared from the product obtained by crushing stone or gravel. When tested by approved methods, the fine aggregate shall conform to the following grading requirements: Retained on ⅜″ screen ..... | 0% Retained on ¼″ screen ..... | 0 to 5% Retained on 20 mesh sieve ..... | 15 to 50% Retained on 100 mesh sieve ..... | 85 to 100% Deleterious substances shall not be present in excess of the following per centages by weight: Material removed by decantation ..... | 3.0% Clay lumps ..... | 0.5% Other substances such as coal, shale and friable particles ..... | 2.0% The fine aggregate when tested in accordance with the method of test for organic impurities shall show a color not darker than the standard color. Mortar specimens made with the fine aggregate when tested in accordance with the mortar strength test shall have an average compressive strength of at least ninety (90) per cent of the strength of similar specimens made with the same cement and Ottawa sand graded as specified in A.S.T.M. Tentative Method of Test for Compressive Strength of Portland Cement Mortars (A.S.T.M. Designation: C109-37T) when tested at an age of not less than seven (7) days when normal Portland cement is used and not less than three (3) days when high early strength cement is used. (13) Coarse aggregate. Coarse aggregate shall consist of crushed stone or gravel and shall have a wear of not more than forty (40) per cent when tested according to A.A.S.H.O. Method T-96. Coarse aggregate shall conform to the following grading requirements: Retained on 2″ screen ..... | 0% Retained on 1½″ screen ..... | 0 to 5% Retained on ¾″ screen ..... | 25 to 60% Retained on ¼″ screen ..... | 95 to 100% Deleterious substances shall not be present in excess of the following per centages by weight: Material removed by decantation ..... | 1.0% Shale or slate ..... | 1.0% Clay lumps ..... | 0.25% Soft fragments ..... | 3.0% The sum of all deleterious ingredients, exclusive of material removed by decantation, shall not exceed four (4) per cent by weight. (14) Reinforcing steel. All bar reinforcement shall be open hearth or Basic Bessemer process new billet steel of structural, intermediate, hard grade or rail steel concrete reinforcement bars. Steel shall conform to the requirements of the Standard Specifications for Concrete Reinforcement Bars, A.S.T.M. Designation A-15-39 or A.S.T.M. Designation A-16. Unless otherwise shown on the plans, all reinforcing bars shall be deformed bars. Twisted bars are not considered as deformed and shall not be used. The form of deformed bars shall be such as to provide a net sectional area at all points equivalent to that of plain square or round bars of equal nominal size. Wire for fabric reinforcement shall be cold-drawn from rods hot-rolled from open hearth billets. Wire shall conform to the requirements of the Standard Specifications for Cold-Drawn Wire for Concrete Reinforcement, A.S.T.M. Designation A-82-34. (15) Expansion joint filler. Expansion joint filler shall be redwood board or premolded bituminous type. Redwood board filler shall be sound hardwood, free from sapwood, knots, clustered birdseye, checks and splits. Premoulded bituminous type expansion joint filler shall conform to the requirements of A.S.T.M. Specification D-994, latest edition. (16) Sampling and testing. Methods of sampling Portland cement and high early strength Portland cement shall be in accordance with A.S.T.M. Standard Methods of Sampling and Physical Testing of Portland Cement (A.S.T.M. Designation C77-39) Methods of sampling aggregates shall be in accordance with A.S.T.M. Tentative Methods of Sampling Stone, Slag, Gravel, Sand and Stone Block for Use as Highway Materials Including Some Material Survey Methods (A.S.T.M. Designation D75-39T). Portland cement and high early strength Portland cement shall be tested in accordance with A.S.T.M. Standard Methods of Sampling and Physical Testing of Portland Cement (A.S.T.M. Designation C77-39). Fine and coarse aggregate shall be tested in accordance with the following: (a) Grading. A.S.T.M. Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregate (A.S.T.M. Designation C136-39). (b) Uniformity of grading; fineness modulus. The fineness modulus of the aggregate shall be determined by adding the total per centages retained on the following U.S. standard sieves and dividing by 100: 3-in., 1½-in., ¾-in., No. 4, No. 8, No. 16, No. 30, No. 50 and No. 100. (c) Organic impurities. A.S.T.M. Standard Method of Test for Organic Impurities in Sands for Concrete (A.S.T.M. Designation C40-33). (d) Coal and lignite. A.S.T.M. Standard Method of Test for Coal and lignite in Sand (A.S.T.M. Designation C123-39). (e) Fineness. A.S.T.M. Standard Method of Test for Amount of Material Finer than No. 200 Sieve in Aggregates (A.S.T.M. Designation C117-37). (f) Clay lumps. The per centages of clay lumps shall be determined by examining the various fractions which remain after the test for grading. Any particles that can be broken up with the fingers shall be classified as clay lumps and the total per centages by weight of all clay lumps shall be determined on the basis of the total original weight of the sample. (g) Mortar strength. A.S.T.M. Standard Method of Test for Structural Strength of Fine Aggregate Using Constant Water-Cement-Ratio Mortar (A.S.T.M. Designation C87-39). (17) Concrete proportioning. It is the intent of this specification to secure, for every part of the work, concrete of homogeneous structure which, when hardened, will have the required strength and resistance to weathering. To this end, the limiting strengths and water contents shown in Table A are specified. The values given in Table A are based on the use of normal Portland cement aggregates, and water which meets the requirements of this specification. TABLE A Minimum Allowable Strength Compressive at 28 Days p.s.i | Maximum Allowable Net Water Content Per Sack Content Per Sack of Cement;Gallons | Minimum Cement Content Sacks Per Cubic Yard 2500 | 6.75 | 4½ The maximum allowable net water content will be the amount added at the mixer, plus the free water in the aggregate and minus the absorption of the aggregate based on a thirty-minute absorption period. No allowance will be made for evaporation of water after batching. The proportions of cement, aggregates and water necessary to produce concrete conforming to the requirements of Table A shall be determined by means of laboratory tests of concrete made with the cement and aggregates to be used on the work. The director of engineering and physical development shall have the right to make check tests of concrete and to order such changes as may be necessary to meet the requirements of the specifications. In the event that the contractor furnishes reliable test records of concrete made with materials from the same sources and of the same quality in connection with current work, all or a part of the strength tests specified hereinbefore may be waived by the director of engineering and physical development. The concrete shall be of such consistency and composition that it can be worked readily into the corners and angles of the forms and around the reinforcement without permitting the materials to segregate or free water to collect on the surface. Subject to the limiting requirements of Table A, the contractor shall adjust the proportions of cement and aggregate as may be necessary to produce a mixture which will be easily placeable at all times, due consideration being given to the methods of placing and compacting used on the work. When high frequency mechanical vibration is used for compacting concrete, the limiting consistencies in Table A may be modified, subject to the approval of the director of engineering and physical development. The proportions and consistencies, however, shall be such that with the vibratory equipment in use the full requirements of workability shall be satisfied. (18) Mixing. The mixing equipment shall be capable of combining the aggregates, cement and water within the specified time into a thoroughly mixed and uniform mass, and of discharging the mixture without segregation. Unless otherwise authorized by the director of engineering and physical development, the mixing of concrete shall be done in a batch mixer of approved type which will insure a uniform distribution of the material throughout the mass. The equipment at the mixing plant shall be so constructed that all materials (including the water) entering the drum can be accurately proportioned and be under control. The entire batch shall be discharged before recharging. The volume of the mixed material per batch shall not exceed the manufacturer's rated capacity of the mixer. Except as qualified hereinafter, mixing of each batch shall continue for the periods indicated below, during which time the drum shall rotate at a peripheral speed of about two hundred (200) feet per minute. The mixing periods shall be measured from the time when all of the solid materials are in the mixer drum; provided, that all of the mixing water shall be introduced before one-fourth (¼) of the mixing time has elapsed. Mixing time shall be as follows: (1) For mixers of a capacity of one (1) cubic yard or less, one (1) minute. (2) For mixers of capacities larger than one (1) cubic yard, the time of mixing shall be increased fifteen (15) seconds for each additional half-cubic yard capacity, or fraction thereof. Truck mixers, unless otherwise authorized by the director of engineering and physical development, shall be of the revolving drum type, watertight, and so constructed that the concrete can be mixed to insure a uniform distribution of materials throughout the mass. All solid materials for the concrete shall be accurately measured and charged into the drum at the proportioning plant. Except as subsequently provided, the truck mixer shall be equipped with a tank for carrying mixing water. Only the prescribed a mount of water shall be placed in the tank, unless the tank is equipped with a device by which the quantity of water added can be readily verified. The mixing water may be added directly to the batch, in which case a tank shall not be required. (19) Construction methods. (a) Concrete curb and gutter. When curb and gutter are to be constructed in conjunction with pavement, it shall be placed directly on the prepared pavement subgrade. In other cases the subgrade shall be excavated and shaped to line, grade and cross-section and, if directed by the director of engineering and physical development, hand tamped and sprinkled. If dry, the subgrade shall be sprinkled lightly immediately before concrete is deposited thereon. Outside forms shall be of wood or metal of a section approved by the director of engineering and physical development, straight, free of warp and of a depth equal to the depth of the curb. They shall be securely staked to line and grade and shall be maintained in a true position during the placing of the concrete. Inside curb face forms, if required, shall be of material and section approved by the director of engineering and physical development and so designed as to provide the curb section required. They shall be rigidly attached to the outside forms. Care shall be exercised to keep reinforcing steel in its proper position as shown in the typical sections. The curb and gutter shall be poured in sections of the length shown on the plans, and those sections shall be separated by premoulded expansion joint filler conforming to the cross-section specified for the curb and gutter and of the thickness shown on the plans. The curb and gutter shall be shaped by the use of a template or mule of a shape conforming to the curb and gutter details shown on the plans. Such template or mule may be made of wood or metal, but the "facing" or "shaping" face shall be of metal. Curb and gutter shall be finished with one-half (½) inch mortar topping. The mortar shall consist of one (1) part of Portland cement to two (2) parts of sand. Not longer than three (3) hours after the concrete has taken its initial set, the inside curb face form shall be removed, if used, and the topping shall be applied immediately and thoroughly troweled, then brushed to remove trowel marks. The outside forms shall remain in place a minimum of twenty-four (24) hours. (b) Sidewalks. Unless otherwise shown on the plans, all sidewalks shall be four (4) feet wide and four (4) inches thick. The subgrade shall be excavated and shaped in conformity with the typical sections shown on the plans and to the lines and grades as established by the director of engineering and physical development. All soft and yielding or other unsuitable materials shall be removed and replaced with selected materials, and the subgrade shall be thoroughly compacted and finished to a firm smooth surface, all to the satisfaction of the director of engineering and physical development. Expansion joints shall be placed as shown on the plans and shall be placed at all direction changes of the walk. The maximum spacing of expansion joints throughout the length of the sidewalk shall be forty (40) feet. Where sidewalk abuts a curb or pavement or structure, an expansion joint shall be placed along the entire length of the abutting edges. Sidewalks shall be marked with an appropriate transverse marking tool at intervals not to exceed the width of the sidewalk. Sidewalks shall be reinforced with six (6) inches by six (6) inches No. 6 wire mesh. Forms for sidewalk construction, if of wood, shall be of not less than two (2) inches commercial lumber well staked and braced to maintain line and grade after concrete is deposited in the forms. Lumber shall be free of warps and defects, and the top surface of such forms shall be smooth enough to permit the use of a screed or straight edge. If steel forms are used, they shall be true to line and grade and shall be cleaned and oiled before each use. No concrete shall be placed until the subgrade and forms have been checked and approved by the director of engineering and physical development. Concrete shall be deposited on a moist subgrade. During placing, the concrete shall be thoroughly spaded next to the forms and shall be carefully tamped, using an approved tamper. Excess water, laitance or other inert materials shall be floated from the surface. After the concrete has taken its initial set and is ready to receive a finish, it shall be dusted with an approved mixture of cement and sand and troweled smooth with a steel trowel, then brushed with a broom or stiff brush to leave a semismooth finish. All edges shall be rounded with an appropriate edging tool. The application of cement to the mortar surface in order to absorb excess water or to hasten the setting will not be permitted. (20) Curing. The curb and gutter and sidewalk shall be completely covered with wet burlap or canvas as soon as the concrete has set sufficiently to prevent being marred by curing operations. The covering shall remain in place not less than four (4) days and shall be kept wet continuously while in place. Under unfavorable weather conditions, the director of engineering and physical development may extend the curing period to a maximum of six (6) days. Other curing methods may be used; provided, that they have been approved by the director of engineering and physical development prior to use. When completed, the sidewalks shall be covered with approved curing mats or two (2) thicknesses of ten (10) to twelve (12) ounce burlap and kept thoroughly wet for a period of four (4) days, at which time the covering may be removed. Other methods of curing may be used; provided, that they have been approved by the director of engineering and physical development prior to use. (21) Backfill. The area back of the curb and gutter shall be backfilled as soon as the forms have been removed and the required finishing completed. The backfill material shall be of earth satisfactory to the director of engineering and physical development, dampened if necessary and thoroughly compacted in layers not to exceed six (6) inches in depth, loose measurement, and neatly graded flush with the top of the curb or as otherwise shown on the plans or directed by the director of engineering and physical development. After the curing is completed and before the walk is open for traffic, the contractor shall remove all surplus excavation, waste concrete, wood forms and braces, and any and all surplus materials used in construction or left over from such construction. It shall be his responsibility to dispose of any such materials away from the site of the work or as directed by the director of engineering and physical development. The contractor shall dress and finish the area immediately adjacent to each side of the completed walk and leave the surface in a condition that will not impede the natural drainage of surface water toward the curb or ditches. The contractor's attention is especially directed to the fact that excavated materials must not be placed in adjacent ditches, but shall be disposed of in a manner satisfactory to the director of engineering and physical development.
(Code 1958, § 34-20)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.