Sec. 6-25-11. - Minimum installation and maintenance controls.
The following minimum controls shall apply to the installation, servicing and maintenance of all utility cable facilities within state freeway rights-of-way, in addition to such other requirements as the city engineer may provide as a general or special condition of the right-of-way agreement: A. Installation and maintenance plan. Before commencing any installation, servicing or maintenance of a utility system, the utility owner or utility company shall submit an installation and maintenance plan to the city engineer for review and approval, and upon approval such plan shall be made a part of the right-of-way agreement. At a minimum, the installation and maintenance plan shall specify: 1. The location and method of installing each part of the Utility Systems and facilities within the right-of-way; 2. The means by which access to and within the right-of-way shall be accomplished for the purpose of installing, servicing and maintaining each part of the utility systems and facilities, including provisions for ingress and egress, parking of vehicles and equipment, and storage of materials; 3. The means by which the utility company will provide for the control of traffic on the travelled way, if needed, in the course of installing, servicing or maintaining any part of the utility systems and facilities; 4. The schedule for completing the installation of the utility systems and facilities, or parts thereof, within the right-of-way; and 5. The procedure by which the utility company will conduct emergency maintenance operations within the right-of-way. B. Preservation of pavement structure. Open cutting or trenching of the pavement structure of a street, highway or roadway, including without limitation the traveled way and shoulders, if any, shall not be permitted. Wherever the city engineer permits a crossing of the pavement structure of a street, highway or roadway in accordance with this chapter, the crossing shall be accomplished by boring or other untrenched method as approved by the city engineer. C. Access to right-of-way for installation and maintenance. 1. As far as it is reasonably practical, all utility facilities should be designed and located in such a manner that they can be installed, serviced and maintained without direct access thereto from the traveled way. Such direct access may be permitted in special circumstances where there is no reasonably practical alternative means of access and the utility company has made adequate provisions for controlling access to the work zone, directing traffic, and protecting the safety of workers and the traveling public, as specified in the installation and maintenance plan approved by the city engineer. D. Parking of vehicles. The utility company shall not be permitted to park vehicles and equipment or to store materials on the right-of-way without express prior approval by the city engineer. In no case shall the utility company be permitted to park vehicles and equipment or store materials within the clear zone of the right-of-way, except as may be required during actual installation operations within the clear zone and while all required traffic control is present and in place. E. Traffic control. 1. All traffic control signs or other traffic control devices that the utility company may use in the course of any installation, servicing or maintenance of a utility facility shall comply with the procedures used by the city engineer regarding traffic control devices. 2. In addition, the utility company shall arrange for law enforcement officers having appropriate enforcement authority to be present to ensure the safe flow of traffic whenever any installation, servicing or maintenance of a utility facility occurs within the clear zone of the freeway or as may be required in the installation and maintenance plan approved by the city engineer where access to the work zone has been permitted from the traveled way, shoulders or access ramps of the freeway. The utility company may not conduct any such work within the right-of-way without giving specific advance notice thereof to the city engineer. 3. Advance notice of installation or maintenance work. Before performing any non-emergency servicing or maintenance of a utility facility at any location within the freeway right-of-way and before performing any installation of a utility facility within the clear zone or where access to the utility work zone has been permitted from the traveled way, shoulders or access ramps of the freeway, the utility company shall give at least five work days advance notice thereof to the city engineer. F. Emergency maintenance or repair. The utility company shall notify the appropriate regional director of the city engineer as soon as possible, and in any event not more than 24 hours, after the occurrence of an event requiring emergency maintenance or repair of a utility facility within the city's right-of-way, or as otherwise specified in the installation and maintenance plan approved by the city engineer. G. Cessation of work for public safety. If the utility company fails to comply with the traffic control plan or any other provision of the installation and maintenance plan, or if any activity of the utility company within the city's right-of-way interferes with the safe and efficient use of the travelled way as determined by the city engineer, the utility company shall immediately cease such activity upon notice being given by the city engineer, and the utility company shall thereafter work with the city engineer to bring its activities into compliance with the installation and maintenance plan and/or implement such additional safety requirements as may be specified by the city engineer. H. Trees. The cutting or removal of trees along the freeway right-of-way shall not be permitted without the express approval of the city engineer. I. Hazardous substances. No utility owner or utility company shall place, install or deposit any hazardous substance or hazardous waste within or on any part of the state freeway or state freeway right-of-way. If at any time a utility owner or utility company causes or allows a spill of a hazardous waste or substance within the freeway right-of-way, the utility owner or utility company shall remain solely liable for the clean-up and removal of such hazardous waste or substance. The utility owner or utility company shall indemnify the City of Memphis and city engineer, and their officers, employees and agents, and shall hold them harmless against any and all claims or expenses of any kind related to the deposit, spillage and/or clean-up of any such hazardous wastes or substances. J. Above-ground markers. The utility company shall install permanent above-ground markers indicating the location of its underground utility systems and facilities at such intervals as the city engineer may approve or require in the installation and maintenance plan. These markers shall not interfere with the safe use, operation and maintenance of the freeway, nor shall they constitute a hazard to the traveling public. K. Repair and restoration of premises. 1. The utility owner or utility company shall, as directed by and in a manner satisfactory to the city engineer, promptly replace or repair any portion of the pavement, shoulders, structures, ramps, guardrail, drainage, or any other part of the right-of-way that may have been damaged in the course of any work within the right-of-way. 2. Upon the completion of any installation, replacement, repair or relocation of utility facilities within the rights-of-way, the utility company shall promptly restore the premises to a condition similar to that which existed prior to such work, in a manner satisfactory to the city engineer. 3. The utility owner or utility company shall remain responsible for maintaining any excavation or trench on or along the state freeway right-of-way, as directed by and in a manner satisfactory to the city engineer. L. As-built drawings. "As-built" drawings that adequately demonstrate the location, size length and nature of all underground and aboveground utility systems located on, over or under the city's right-of-way shall be submitted by a utility owner or utility company to the city engineer in such format as he shall direct within 120 days after completion of construction of such systems. A utility owner or utility company shall update such drawings within 60 days whenever material changes are made to such company's system which impact the public right-of-way. Said drawings, set forth by utility quarter sections, shall at a minimum include cable routings and the location of amplifiers, power supplies and system monitor test points. M. Completion of any installation or relocation. It shall be the responsibility of the utility owner or utility company to seasonably submit "as built" drawings of its facilities in the city's right-of-way and to provide other information upon request.
(Ord. No. 5807, 11-16-2021)