§ 73.17 — Extraction permits
Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances, App. A, art. 73, § 73.17
Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/17efc07e-cb1c-4d0b-a32c-98ff67947a1f
73.17. - Extraction permits.
No new extraction operation shall begin and no existing extraction operation shall expand until an extraction permit has been issued by the natural resources and environmental management division. The following information shall be submitted to the manager of natural resources and environmental management when making application for an extraction permit. The manager may require other pertinent data if necessary to determine that the proposed extraction operation will satisfy the provisions of all applicable local laws and regulations. After all data has been submitted to the manager as required herein, the manager shall have 60 days within which to approve or deny the application. If the manager has taken no action on the completed application within the stated time period, the application shall be deemed denied. 73.17.1. Legal description of the extraction site, including the total acreage. 73.17.2. Copies of all instruments (deeds, leases, etc.) conveying to the applicant mineral rights in and to the real property within the boundaries of the site. Provided, however, that the applicant has the option of attaching, in lieu of a copy of any lease, a memorandum of lease satisfying the execution, acknowledgment, and content requirements of Code of Ala. 1975, §§ 35-4-6, 35-4-51.1. 73.17.3. Vicinity map drawn on an official Huntsville Zoning Map at a scale of one inch to 400 feet, on which is identified the following data for both the proposed extraction site and the area one-half mile beyond the site: (1) Boundaries of the extraction site; (2) Public routes to be used by vehicles and equipment entering and leaving the site; (3) Locations of streams and bodies of water, public roads, railroads, utilities, residences, and structures or areas of cultural or historic significance; and (4) Locations and descriptions of any environmentally sensitive areas including, but not limited to, wetlands and lands harboring endangered plant and animal species. 73.17.4. Site plan drawn on a topographic map at a scale of one inch to 200 feet, on which is identified the following data: (1) Boundaries of the extraction site; (2) Locations and descriptions of all proposed buffers, setbacks and visual screens; (3) Topography of the site and the lands within one-half mile thereof at five-foot intervals; and (4) Locations and acreages of areas planned for extraction; for storage of overburden, byproducts and excavated materials; for processing facilities; and for those lands to be left undisturbed. 73.17.5. Operational plan, with maps drawn at a scale of one inch to 200 feet or less, to include the following: (1) A description of the method of operation, including the disposition of topsoil, overburden and byproducts. (2) A general description of the equipment to be used in the extraction process. (3) Measures to be taken to control noise, dust, litter, and vibrations from the operation. (4) Measures to be taken to screen visibility of the operation, including section drawings of the site clearly indicating the effectiveness of all existing and proposed measures to be used to screen the operation from view of surrounding lands. (5) Measures to be taken to prevent the tracking of material onto public roadways. (6) Plan view drawing showing how the applicant plans to proceed with the extraction operation including, but not limited to, the extent of the mining area, sediment and/or wash ponds, sediment basins, stockpiles, structures, roads, railroads, utilities and other permanent or temporary structures. (7) Measures to be taken to control surface water runoff and soil erosion. (8) General description of the geologic character of the site. (9) General description of the products to be produced at the site, their end use, and general market area. (10) Copies of applications to federal, state and local regulatory agencies for environmental permits including, but not limited to, control of air and water quality. 73.17.6. Reclamation plan, with maps drawn at a scale of one inch to 200 feet or less, to include the following: (1) Approximate expected topography of site when extraction activity has been completed, at intervals no greater than five feet. (2) Approximate expected topography of site when reclamation activity has been completed, at intervals no greater than five feet, to include methods to be employed for backfilling and grading. (3) The location and identification of all lakes, ponds, streams, rivers, or other waterways planned to exist when reclamation activity has been completed. (4) A description of the methods and procedures to be used and a proposed timetable for the various reclamation phases. (5) An estimate of the cost per acre of reclamation with supporting calculations for the estimate. (6) A plan for revegetation of the site. (7) A description of the expected future use following reclamation of the site and the relationship of the expected future use to existing surrounding land uses. An extraction permit shall be valid for a maximum period of five years unless renewed by the manager of natural resources and environmental management as follows: If the permitted extraction operation and reclamation program are not completed within five years, then a review of the extraction permit shall be conducted by the manager of natural resources and environmental management based on the submittal of an updated extraction application. The updated extraction application shall reflect any additions, changes, or other modifications to the information provided in the original application. At each review, the manager shall establish a new bond or adjusted cash escrow amount, which bond or cash escrow shall be posted before the extraction permit is renewed. The renewal process shall occur at five-year intervals until such time as the reclamation plan has been completed.
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
