§ 74.120 — Additional pretreatment measures
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 74.120
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/18213ac4-4e15-49b5-8a05-e39db75323ac
Sec. 74.120. - Additional pretreatment measures.
(a) When deemed necessary by the Director, industrial users shall restrict discharge during peak flows or during emergencies, discharge certain wastewater only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and be subject to such other conditions necessary to protect the municipal wastewater system and to determine the industrial user's compliance with this chapter or a wastewater discharge permit issued hereunder. (b) The Director may require any new source or any existing source undergoing major expansions which is discharging wastewater into the municipal wastewater system in volumes greater than 100,000 gallons per day or greater than five percent of the average daily flow in the affected drainage basin, whichever is lesser, to install and maintain suitable storage and flow control facilities, to ensure equalization of flow over a 24-hour period. Capacity of the facility shall be determined using sound engineering principles. A wastewater permit may be issued solely for flow equalization. (c) Grease, oil, and sand interceptors shall be provided by users, other than residential users, when deemed necessary by the Director for the proper operation of the wastewater collection system. All interceptors shall be of a type and capacity approved by the Director and shall be so located to be easily accessible for cleaning and inspection. All interceptors shall be inspected, cleaned and repaired regularly, and the contents properly disposed of, as necessary at the owner's sole effort and expense. (d) The Director may require industrial users with the potential to discharge flammable substances to install and maintain an approved combustible gas detection meter. (e) Wastes containing soil, dirt, or sand shall be settled in a detention basin or in a mechanical device approved by the Director before being discharged into the municipal wastewater system. (f) Industrial wastes shall be passed through approved 20-mesh screens (0.85mm sieve opening), unless otherwise allowed by the Director. (g) When pH adjustment is required to meet established pH limits, a recording pH meter shall be installed and maintained by the user.
(Prior Code, § 74.120; Ord. No. 13-96; Ord. No. 65-2002; Ord. No. 22-2003)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
