33.296.030 Temporary Activities Allowed
A.
Residential sales offices. Sales offices for major subdivisions or planned unit developments
are allowed in the IR, CI2, and RF through RM4 and RMP zones. Sales offices are allowed at
the development site until all lots or houses are sold or for 10 years after the final plat is
approved, whichever is less. Use of the sales office for sites outside of the project
is prohibited.
B.
Show of model homes. The viewing of model homes within a subdivision for a fee is
allowed in the IR, CI2, and RF through RM4 and RMP zones for a period not to exceed one
month. Only one showing is allowed per phase of a subdivision.
C.
Incidental Sales. Incidental sales of items are allowed based on the zone in which the site is
located:
1.
Garage sales. Garage sales and other sales of items from the site may occur in the IR,
CI1, and RF through RM4 and RMP zones for no more than 3 consecutive days on 2
different occasions during a calendar year. The sale of products brought to the site for
the sale is not allowed.
2.
Parking lot sales. Parking lot sales in the RX, C, E, I, and CI2 zones where outdoor
display is not otherwise allowed, are allowed for up to 2 consecutive weeks at any one
time. The time between parking lot sales events must be 4 times as long as the
duration of the last event.
3.
Warehouse sales. In Industrial zones, retail warehouse sales are allowed for up to 1
week at any one time. The time between warehouse sales events must be 4 times as
long as the duration of the last event.
4.
Seasonal outdoor sales.
a.
In the RX, C, E, I, and CI2 zones, sales events are allowed for up to 1 month at any
one time. The time between seasonal outdoor sales events must be four times as
long as the duration of the last event.
b.
In the IR, CI1, and RF through RM4 and RMP zones, seasonal outdoor sales of
plants and produce are allowed twice a year for up to 5 consecutive weeks
each time.
D.
Farmers Markets. Farmers Markets are allowed on a site with an institutional use, and on
sites in the IR, RM1 – RM4, RX, C, E, I, CI, and OS zones as follows:
1.
The market may be open up to 70 days per calendar year.
2.
Vendors. Calculations are based on the number of vendors, rather than linear or
square footage. Those who do not sell any products or services, such as community
groups and music areas, are not included in these calculations.
•
Category One: Agricultural Producers. At least 50 percent of vendors must be
farmers, ranchers, and other agricultural producers who sell food, plants,
flowers, and added-value products, such as jams and jellies, they have grown,
raised, or produced from products they have grown or raised.
•
Category Two: Other Food. Up to 50 percent of market vendors may be those
who sell food, but do not fit into the first category. This includes sales of wild-
caught fish, freshly made food available for immediate consumption on site,
cheesemakers who do not raise their own animals, and the like.
•
Category Three: All Other. Up to 20 percent of market vendors are not
required to be related to agriculture or food.
For example, a market may have 50 percent of vendors in Category One, 30
percent in Category Two, and 20 percent in Category Three. Another market
may have 70 percent of vendors in Category One, 10 percent in Category Two,
and 20 percent in Category Three. A third may have 60 percent of vendors in
Category One, 35 percent in Category Two, and 5 percent in Category Three.
3.
The market cannot obstruct a path that is part of a required pedestrian
circulation system.
4.
The market manager must retain organic certification information on site and must
post a sign in a prominent location that reads "Questions about organic certification?
Contact market manager," and that also includes a phone number for the
market manager.
E.
Fairs, carnivals, and other major public gatherings.
1.
In the CI1 and RF through RM4 and RMP zones, fairs, carnivals and other major public
gatherings are allowed for up to 9 consecutive days at a site with an existing
institutional use. The 9 days does not include up to 5 total days to set up and
breakdown the event. Two events are allowed per calendar year.
2.
In the IR zone, fairs, carnivals and other major public gatherings are allowed for up to
9 consecutive days at a site with an existing institutional use. Temporary events must
be listed in the institution's approved mission statement and impact mitigation plan.
The 9 days does not include up to 5 total days to set up and breakdown the event.
Two events are allowed per calendar year.
3.
In the RX, C, E, I, and CI2 zones, fairs and carnivals and other major public gatherings
are allowed as permitted by Portland Fire & Rescue. The time between events must be
4 times as long as the duration of the last event.
4.
In the OS zone, fairs, carnivals, and other major public gatherings are allowed by right.
A permit is required from the Bureau of Parks when such activities occur in public
parks and open spaces.
F.
Construction activities
1.
Use of existing house or manufactured dwelling. In the IR, CI1, and RF through RM4
and RMP zones, an existing house or a manufactured dwelling may be used
temporarily for a residence while a permanent residence is being constructed. The
existing house or manufactured dwelling may remain on the site until the completion
of the construction, or for not more than 2 years, whichever time period is less. The
existing house or manufactured dwelling must be removed within 1 month after
approval of final occupancy for the new residence. A performance bond or other
surety must be posted in conformance with 33.700.050, Performance Guarantees, to
ensure removal of the existing house or manufactured dwelling.
2.
Building relocation. In all zones except the OS zone, a site may be used once per year
to store a building for up to 6 months while the building is awaiting permanent
placement. Site development standards of this Title do not apply to the building while
it is being stored; however other city requirements may still apply such as stormwater
management and erosion control. A performance bond in conformance with
33.700.050, Performance Guarantees or other form acceptable to the Director of
PP&D must be posted to ensure removal of the building if is not permanently placed
within 6 months.
3.
Construction parking. In all zones, temporary parking areas are allowed 30 days prior
to and during construction on the site. They must be removed within 1 month of
issuance of a certificate of occupancy for the construction. The land must be restored
to the condition it was in before the development of the temporary parking area
unless an alternative development has been approved for the location. A performance
bond or other surety must be posted in conformance with 33.700.050, Performance
Guarantees, to ensure removal.
4.
Construction staging areas
a.
General construction projects. Staging areas for construction projects in the
RM4, RX, C, E, and CI2 zones are allowed 30 days prior to and during construction
on the site subject to subparagraph .030.F.4.c. The staging area may be located
off-site, however in no case can the staging area be located within an OS or
single-dwelling zone.
b.
Public utility projects. Staging areas for public utility improvement projects, such
as the installation of sewer pipes, water pipes, and transportation improvements,
are allowed in all zones and are subject to the regulations below.
c.
Staging area standards. Adjustments to the following standards are prohibited
(1) Staging areas that last more than one year require that a community
relations representative is designated for the project. The community
relations representative must be available to respond to neighbors related
to the operation of the staging area. The community relations
representative must also be available to meet on at least a quarterly basis
with the affected neighborhood association and business association until
the staging area is removed.
(2) Staging areas located within an Environmental, River Environmental, River
Natural, or Pleasant Valley Natural Resource overlay zone are subject to the
regulations for a permanent use regardless of the length of time the staging
area will be in place.
(3) Dust, mud and erosion control. During the construction project, erosion
control measures must be maintained in order to reduce dust on the site
and to reduce dust and mud on adjacent streets from vehicles entering and
leaving the site. During the length of the project, the site must be enclosed
or protected in a manner to prevent on-site erosion and to prevent
sediment from leaving the site.
(4) Final condition. When the construction project is final, the staging area must
be prepared and seeded with a mixture of 100 percent perennial rye grass
to create a low maintenance vegetative ground cover. This requirement
does not apply to portions of the staging area that were paved before the
project started. In the RX, C, E, I, and CI2 zones the staging area may be
graveled instead of seeded; however gravel is not allowed within 5 feet of
lot lines. Seeding is required within 5 feet of the lot lines.
(5) Permit. Prior to the start of the construction project, a building or zoning
permit must be obtained from the City. The application for the permit must
contain evidence that the project will comply with the staging area
standards. For public utility projects, if the project will be implemented
through a contract with the City, then the evidence of compliance may be
shown as specifications in the contract. If the public utility project does not
involve a contract with the City evidence of compliance must include
performance guarantees for the requirements in c.(3), Dust, mud, and
erosion control, and c.(4), Final condition. Performance guarantees must
comply with the provisions of Section 33.700.050,
Performance Guarantees.
G.
Natural disasters and emergencies. Temporary activities and structures needed as the
result of a natural disaster, shelter shortage, or other health and safety emergencies are
allowed for the duration of the emergency. Temporary activities include food, water, and
equipment distribution centers, medical facilities, sobering centers, short term shelters,
mass shelters, outdoor shelters, warming or cooling shelters, and triage stations.
H.
Mass and outdoor shelters.
1.
Mass shelters. Mass shelters are allowed as a temporary activity for up to 180 days
within a calendar year.
2.
Outdoor shelters. Outside of OS zones, outdoor shelters are allowed as a temporary
activity for up to 180 days within a calendar year when the outdoor shelter is located
outside of Environmental overlay zones, the River Natural overlay zone, the River
Environmental overlay zone, the Pleasant Valley Natural Resource overlay zone, and
the combined flood hazard area.
I.
Radio Frequency Transmission Facilities. Temporary facilities for personal wireless service
facilities are allowed for up to 120 days in a calendar year. Meeting this regulation must be
documented through a zoning permit.
J.
Commercial filming. In all zones, commercial filming is allowed as a temporary activity. For
all sites, except sites in the OS zone, the time between filming events must be four times as
long as the duration of the last event.